Downer EDI Limited/Announcement
Downer EDI Limited logo

Half Yearly Report and Accounts

Half Year Results1 February 2017DOWIndustrials

2 February 2017


Company Announcements Office

ASX Limited

Exchange Centre

Level 4, 20 Bridge Street

SYDNEY NSW 2000




Dear Sir/Madam


Please find attached the following documents:

1. Appendix 4D – results for announcement to the market for the half-year ended

31 December 2016;

2. Condensed Consolidated Half-year Financial Report dated 31 December 2016;

3. Market release dated 2 February 2017; and

4. Investor Presentation.


Yours sincerely,

Downer EDI Limited


Peter Tompkins

Company Secretary


Downer EDI Limited

ABN 97 003 872 848

Triniti Business Campus

39 Delhi Road

North Ryde NSW 2113

1800 DOWNER

www.downergroup.com

Page 1 of 1

Results for announcement to the market
for the half-year ended 31 December 2016

Appendix 4D

31 Dec 2016

31 Dec 2015

change

$'m

$'m

%

Revenue from ordinary activities3,333.6 3,262.0

Other income1.0 2.6

Total revenue and other income from ordinary activities3,334.6 3,264.6 2.1%

Total revenue including joint ventures and other income 3,603.0 3,543.4 1.7%

120.8 113.2 6.7%

78.2 72.1 8.5%

31 Dec 2016

31 Dec 2015

change

cents

cents

%

Basic earnings per share 17.6 15.8 11.4%

Diluted earnings per share17.1 15.1 13.2%

Net tangible asset backing per ordinary share255.6 254.2 0.6%

Dividend31 Dec 201631 Dec 2015

InterimInterim

Dividend per share (cents)12.012.0

Franked amount per share (cents)12.012.0

Dividend record date16/02/201718/02/2016

Dividend payable date16/03/201717/03/2016

Redeemable Optionally Adjustable Distributing Securities (ROADS)

Dividend per ROADS (in Australian cents)2.17 2.40

New Zealand imputation credit percentage per ROADS 100%100%

ROADS payment dateQuarter 1Quarter 2

Instalment date FY201715/09/201615/12/2016

Instalment date FY201615/09/201515/12/2015

For commentary on the results for the period and revie

wofoperations, please refer to the Directors' Report and

separate media release attached.

Earnings before interest and tax

Profit from ordinary activities after tax attributable to members of

the parent entity

Downer EDI's Dividend Reinvestment Plan (DRP) has been suspended.

Condensed Consolidated
Half-year Financial Report

31 December 2016

Condensed Consolidated Financial Report
for the half-year ended 31 December 2016

Contents

Directors' Report

Page 2

Auditor's signed report

Page 17Auditor's Independence Declaration

Page 18Independent Auditor's Review Report

Financial Statements

Page 20Condensed Consolidated Statement of Profit or Loss and Other Comprehensive Income

Page 21Condensed Consolidated Statement of Financial Position

Page 22Condensed Consolidated Statement of Changes in Equity

Page 23Condensed Consolidated Statement of Cash Flows

ABCD

B1C1D1

B2C2D2

B3C3D3

B4C4D4

D5

Directors' Declaration

Page 39

Contingent liabilities

Other disclosuresCapital structure and

financing

Business performance

Profit from ordinary

activities

Financing facilitiesIntangible assets

Acquisition and

disposal of

businesses

Segment information Borrowings Property, plant and

equipment

DividendsSubsequent events

Earnings per share Issued capitalJoint arrangements

and associate

entities

Notes to the condensed consolidated financial report

Page 24Page 24-27Page 33-38Page 28-32

About this report

Page 1 of 39

DIRECTORS’ REPORT
For the half-year ended 31 December 2016


The Directors of Downer EDI Limited (Downer) submit the condensed consolidated financial report of the

Company for the half-year ended 31 December 2016. In accordance with the provisions of the Corporations

Act 2001 (Cth), the Directors' Report is set out below:


Directors


The names of the Directors of the Company during, or since the end of, the half-year are:


R M Harding (Chairman, Independent Non-executive Director)

G A Fenn (Managing Director and Chief Executive Officer)

S A Chaplain (Independent Non-executive Director)

P S Garling (Independent Non-executive Director)

T G Handicott

(Independent Non-executive Director) – appointed on 21 September 2016

E A Howell (Independent Non-executive Director)

J S Humphrey (Independent Non-executive Director) – retired on 3 November 2016

C G Thorne (Independent Non-executive Director)


REVIEW OF OPERATIONS


PRINCIPAL ACTIVITIES


Downer EDI Limited (Downer) is a leading provider of services to customers in markets including: Transport

Services; Technology and Communications Services; Utilities Services; Rail; Engineering, Construction and

Maintenance (EC&M); and Mining. Downer employs about 19,000 people, mostly in Australia and New

Zealand but also in the Asia-Pacific region, South America and Southern Africa. An outline of each service

line is set out below.


TRANSPORT SERVICES


Transport Services comprises Downer’s road, transport infrastructure, bridge, airport and port businesses. It

features a broad range of transport infrastructure services including earthworks, civil construction, asset

management, maintenance, surfacing and stabilisation, supply of bituminous products and logistics, open

space and facilities management a nd rail track signalling and electrification works.



Transport Services

1 Total revenue is a non-statutory disclosure and includes revenue, other income and notional revenue from joint ventures and other

alliances not proportionately consolidated. Due to rounding, divisional percentages do not add up precisely to 100%.






Page 2 of 39

Road Services

Downer offers one of the largest non-government owned road infrastructure services businesses in Australia

and New Zealand, maintaining more than 40,000 kilometres of road in Australia and more than 32,000

kilometres in New Zealand.


Downer delivers a wide range of tailored pavement treatments and traffic control services and also provides

high-level capabilities in strategic and tactical asset management, network planning and intelligent transport

systems. The Company continues to invest in state-of-the-art technology to drive innovation and

performance, including asphalt plants that use more recycled products and substantially less energy.


Downer is also a leading manufacturer and supplier of bitumen based products and a provider of soil and

pavement stabilisation, pressure injection stabilisation, pavement recycling, pavement profiling, spray sealing

and asset management.


In October 2016, Downer acquired RPQ Group (RPQ). The principal activities of RPQ include the supply of

asphalt, bitumen spray sealing, road milling and profiling, road maintenance, foam bitumen stabilisation,

mobile asphalt production, mobile crushing and equipment hire.


Downer’s Road Services customers include all of Australia’s State Road Authorities, the New Zealand

Transport Agency and the majority of local government councils and authorities in both countries.


Other Transport Infrastructure


Downer provides a range of transport infrastructure services to its customers including earthworks, civil and

rail track construction, design, construction and commissioning of facilities and signalling and electrification

works.


Downer also provides integrated services to its airport and port customers including pavement construction,

facilities maintenance, communications technologies, open space and asset management and turnkey

electrical and communication systems. It also provides whole-of-life asset solutions for associated

infrastructure such as roads, rail lines and car parks.



TECHNOLOGY AND COMMUNICATIONS SERVICES


Downer provides an end-to-end infrastructure service offering comprising feasibility, design, civil

construction, network construction, commissioning, testing, operations and maintenance across fibre, copper

and radio networks in Australia and New Zealand.




Technology and Communications Services


1 Total revenue is a non-statutory disclosure and includes revenue, other income and notional revenue from joint ventures and other

alliances not proportionately consolidated. Due to rounding, divisional percentages do not add up precisely to 100%.


Downer’s expertise in the feasibility and design phases of the life cycle provides customers with a high level

of assurance and reduces uncertainty at the beginning of the investment process.

Page 3 of 39


Downer has a track record of delivering both fixed and mobile networks across Australia and New Zealand.


Downer is a leader in intelligent transport technology systems (ITS) in both countries.


Comprehensive project and program management capabilities are supported by our world class engineering

and technical capabilities. This allows Downer to deliver projects safely, cost effectively and on time.


Customers include nbn™, Telstra, Chorus, Spark and Vodafone.



UTILITIES SERVICES


The Utilities Services division provides complete lifecycle solutions to customers in the power, gas, water

and renewable energy sectors.





Utilities Services


1 Total revenue is a non-statutory disclosure and includes revenue, other income and notional revenue from joint ventures and other

alliances not proportionately consolidated. Due to rounding, divisional percentages do not add up precisely to 100%.


Power and Gas


Downer offers customers a wide range of services including planning, designing, constructing, operating,

maintaining, managing and decommissioning power and gas network assets.


Downer erects steel lattice transmission towers, designs and builds substations and connects tens of

thousands of new power and gas customers each year. It also maintains over 62,000 kilometres of electricity

and gas networks across more than 115,000 square kilometres.


Customers include United Energy, AusNet Services, Ausgrid, Ergon Energy, Powerco, Wellington Electricity

and Powerlink.


Water


Downer provides complete water lifecycle solutions for municipal and industrial water users, with expertise

including waste and waste water treatment, pumping and water transfer, desalination and water re-use, and

abstraction and dewatering.


Supporting its customers across the full asset lifecycle from the conceptual development of a project through

design, construction, commissioning and optimisation, Downer also operates and maintains treatment,

storage, pump station and network assets.


Customers include Logan City Council, Mackay Regional Council, Melbourne Water, Queensland Urban

Utilities, Tauranga City Council, Yarra Valley Water, Wagga Wagga City Council and Watercare.



Page 4 of 39

Renewable energy

Downer is one of Australia’s largest and most experienced providers in the renewable energy market,

offering design, build and maintenance services for: wind farms and wind turbine sites; solar farms; landfill

methane generation plants; sugar cane waste (Bagasse) fired cogeneration plants; and other biomass fired

cogeneration plants.


Downer offers the services required for the entire asset life-cycle including procurement, assembly,

construction and commissioning.


Downer is currently working on the Ararat Wind Farm Project (Victoria), the Sunshine Coast Solar Farm

(Queensland) and the Clare Solar Farm (Queensland).


RAIL


Downer provides total rail asset solutions including freight and passenger build, operations and

maintenance, component overhauls and after-market parts.





Rail


1 Total revenue is a non-statutory disclosure and includes revenue, other income and notional revenue from joint ventures and other

alliances not proportionately consolidated. Due to rounding, divisional percentages do not add up precisely to 100%.


Downer provides services to a range of public and private sector rail customers with capabilities spanning

the maintenance, overhaul and provision of passenger and freight rolling stock, as well as importing and

commissioning completed locomotive units for use in the resources sector.


Downer operates two fleet control centres, focused on monitoring and management of passenger and freight

fleets on behalf of its customers, and four manufacturing plants.


Downer has formed strategic joint ventures and relationships with leading technology and knowledge

providers to support its growth objectives in the passenger and freight market. These include Keolis, Electro-

Motive Diesel (owned by Caterpillar), and CRRC Changchun Railway Vehicles (CRRC).


The Keolis Downer joint venture is Australia’s largest private provider of multi-modal public transport

solutions, with contracts to operate and maintain Yarra Trams in Melbourne and the Gold Coast light rail

system in Queensland. Keolis Downer also owns Australian Transit Enterprises (ATE), one of Australia’s

largest route, school and charter bus businesses. ATE operates a fleet of over 900 buses in South Australia,

Western Australia and Queensland.


Customers include Sydney Trains, Transport for NSW, Queensland Rail, Public Transport Authority (WA),

Metro Trains Melbourne, Public Transport Victoria, Pacific National, Aurizon, BHP Billiton, Genesee &

Wyoming and SCT Logistics.




Page 5 of 39


ENGINEERING, CONSTRUCTION AND MAINTENANCE (EC&M)


Downer works with customers in the public and private sectors delivering services including design,

engineering, construction, maintenance and ongoing management of critical assets.





EC&M


1 Total revenue is a non-statutory disclosure and includes revenue, other income and notional revenue from joint ventures and other

alliances not proportionately consolidated. Due to rounding, divisional percentages do not add up precisely to 100%.


Multi-disciplined teams project manage and self-execute a wide range of services for greenfield and

brownfield projects across a range of industry sectors including: oil and gas; power generation; commercial /

non-residential; iron ore; coal; and industrial materials. T hese services are delivered on complex resources

and industrial sites as well as commercial operations with critical infrastructure requirements such as data

centres, airport facilities and hospitals.


Downer supports customers across all stages of the project lifecycle with services including:

 feasibility studies;

 engineering design;

 civil works;

 structural, mechanical and piping;

 electrical and instrumentation;

 mineral process equipment design and manufacture;

 commissioning;

 operations maintenance;

 shutdowns, turnarounds and outages;

 strategic asset management; and

 decommissioning.


Customers include Alcoa, Bechtel, BHP Billiton, Chevron, Landcorp, Newcrest, Orica, Origin Energy,

POSCO, Powerlink Queensland, Rio Tinto, Santos, Transgrid, Wesfarmers and Woodside Energy.



Page 6 of 39

MINING

Downer is one of Australia’s leading diversified mining contractors with around 3,500 employees working

across more than 50 sites in Australia, Papua New Guinea, South America and Southern Africa.




Mining


1 Total revenue is a non-statutory disclosure and includes revenue, other income and notional revenue from joint ventures and other

alliances not proportionately consolidated. Due to rounding, divisional percentages do not add up precisely to 100%.



Downer’s Mining division generates its revenues primarily from open cut mining and blasting services, with

contributions also from tyre management and underground mining. Downer supports its customers at all

stages of the mining lifecycle including:


 asset management;

 blasting services, explosives manufacture and supply;

 civil projects (mine site infrastructure);

 crushing;

 exploration drilling;

 mine closure and mine site rehabilitation;

 mobile plant maintenance;

 open cut mining;

 training and development for ATSI employees;

 tyre management (through the subsidiary Otraco International); and

 underground mining.


Customers include BHP Mitsubishi Alliance, Glencore, Idemitsu Australia Resources, Karara Mining,

Millmerran Power Partners, Newmarket Gold, Newmont, Rio Tinto, Roy Hill Iron Ore, Stanwell Corporation

and Yancoal Australia.



GROUP FINANCIAL PERFORMANCE


For the six months ended 31 December 2016, Downer reported increases in total revenue, earnings before

interest and tax (EBIT) and net profit after tax (NPAT).


REVENUE


Total revenue for the Group increased by $59.6 million, or 1.7%, to $3.6 billion.


Transport Services revenue increased 13.5% to $911.2 million due to continuing strong performance on

existing contracts, improved contribution from Infrastructure Projects including Newcastle Light Rail and the

acquisition of RPQ.


Technology and Communications Services revenue decreased 1.6% to $245.9 million due to lower revenue

from the completion of the Foxtel contract in Australia, partially offset by favourable performance on the

nbn

TM

contracts in Australia and the Chorus contract in New Zealand.

Page 7 of 39


Utilities Services revenue increased 17.5% to $442.3 million, due to new contracts and strong contributions

from renewable energy, power, gas and water projects in Australia and New Zealand.


Rail revenue decreased 4.9% to $399.7 million due to the completion of freight build manufacturing contracts

and reduced revenue from the joint venture operations. This was partially offset by higher revenue in

passenger maintenance and from improved After Market Services (AMS) sales.


EC&M revenue increased 4.9% to $973.4 million as a result of the increased activities on the Gorgon and

Wheatstone projects in Western Australia, offset by the continued downturn in the resources sector in

Australia, with significant projects completed in the prior period not being fully replaced.


Mining revenue decreased 18.7% to $635.4 million mainly as a result of the completion of the Christmas

Creek contract.



EXPENSES


Total expenses increased by 2.2% which is in line with the 1.7% increase in total revenue.


Employee benefits expenses increased by 2.8%, or $37.7 million, to $1.4 billion and represents 42.7% of

Downer’s cost base. This increase is mainly due to higher activity across the Group and a more labour

intensive contract base in the current period compared to the prior corresponding period (pcp).


Subcontractor costs increased by 16.1% to $729.2 million and represents 22.6% of Downer’s cost base. This

increase accords with the increase in total revenue and the change in the sub-contractor mix on some

contracts. The continued use of subcontracting accords with the Group’s strategy to retain cost base

variability.


Raw materials and consumables expense increased 0.4% to $567.9 million and represents 17.6% of

Downer’s cost base. The slight increase is the net impact of raw material requirements for new projects

(particularly in Utilities and Transport) offset by lower requirements as a result of completion of contracts in

Mining and Rail.


Plant and equipment costs decreased by 16.0% to $253.2 million and represents 7.8% of Downer’s cost

base. This largely reflects the continued reduction in operating leased assets coupled with increased

utilisation of owned assets, more efficient maintenance practices and scope reduction on some Mining

contracts.


Depreciation and amortisation decreased by 18.0% to $ 105.0 million and represents 3.3% of Downer’s cost

base. This decrease is predominantly as a result of project completion in Mining.


Other expenses, which includes communication, travel, occupancy and professional fees costs, have

decreased by 1.0% to $193.5 million and represents 6.0% of Downer’s cost base. Included in other

expenses is $10.0 million referable to Downer’s share of pre-tax bid costs written off in relation to Downer’s

unsuccessful bid for the New Intercity Fleet contract for Transport for NSW.



EARNINGS


EBIT for the Group increased 6.7% to $120.8 million, consistent with the increase in revenue and with higher

margins in Transport Services, Technology and Communications Services, EC&M and Rail. Net Profit After

Tax (NPAT) for the Group increased 8.5% to $78.2 million which includes the $10.0 million write-off of New

Intercity Fleet bid costs.


Transport Services EBIT increased 31.0% to $41.4 million due to continued strong performance and the

successful integration of the RPQ acquisition.


Technology and Communications Services EBIT increased 53.9% to $21.7 million mainly as a result of the

continued strong performance in Australia and improved performance in New Zealand.


Page 8 of 39

Utilities Services EBIT decreased 8.8% to $20.8 million, driven by the completion of a major gas project in
the pcp in Australia and lower than expected profit from the Ararat wind farm project.


Rail EBIT increased $9.5 million to $14.0 million reflecting improved profitability relating to Waratah TLS,

benefits from cost saving initiatives following a restructure in the pcp, and improved performance by joint

venture operations. The prior period included $5.7 million of restructuring costs.


EC&M EBIT increased 31.6% to $27.1 million due to continued strong performance on the Gorgon and

Wheatstone projects and improved results from the resources related consultancies (QCC Resources and

Mineral Technologies), despite the impact of the continued reduced activity in Australia.


Mining EBIT decreased 34.4% to $44.4 million due predominantly to the completion of the contract at

Christmas Creek during the period.


Corporate costs decreased by $2.3 million, or 5.7%, to $37.8 million, predominantly due to lower

restructuring costs and reduced investment in the IT Transformation Program.


The Group recognised $4.2 million in R&D incentives compared to $5.0 million in the prior period, reflecting a

change in legislation that reduced the benefit rate from 10% to 8.5% of the capped eligible spend of $100

million.


Net finance costs decreased by $2.1 million, or 13.3%, to $13.7 million due to a lower average net debt

balance during the 2017 half-year, following amortisation of facilities in the normal course, higher cash

balances held and the prepayment of two Export Credit Agency (ECA) guaranteed loans during the period.


The effective tax rate of 27.0% is lower than the statutory rate of 30.0% due to non-assessable R&D

incentives, non-taxable distributions from joint ventures and lower overseas tax rates.




Page 9 of 39

DIVISIONAL FINANCIAL PERFORMANCE

Transport Services




 Total revenue of $911.2 million, up 13.5%;

 EBIT of $41.4 million, up 31.0%;

 EBIT margin of 4.5%, up 0.6 ppts;

 ROFE of 21.0%, up from 16.1%; and

 Work-in-hand of $5.3 billion.

.



Technology and Communications Services



 Total revenue of $245.9 million, down 1.6%;

 EBIT of $21.7 million, up 53.9%;

 EBIT margin of 8.8%, up 3.2 ppts;

 ROFE of 157.3%, up from 58.9%; and

 Work-in-hand of $1.6 billion.



Utilities Services





 Total revenue of $442.3 million, up 17.5%;

 EBIT of $20.8 million, down 8.8%;

 EBIT margin of 4.7%, down 1.4 ppts;

 ROFE of 10.8%, down from 13.2%; and

 Work-in-hand of $3.5 billion.



Rail



 Total revenue of $399.7 million, down 4.9%;

 EBIT of $14.0 million, up 211.1%;

 EBIT margin of 3.5%, up from 1.1%;

 ROFE of 5.4%, up from 3.6%; and

 Work-in-hand of $7.2 billion.




Page 10 of 39


Engineering, Construction and Maintenance (EC&M)





 Total revenue of $973.4 million, up 4.9%;

 EBIT of $27.1 million, up 31.6%;

 EBIT margin of 2.8%, up 0.6 ppts;

 ROFE of 25.1%, up from 21.2%; and

 Work-in-hand of $1.5 billion.




Mining




 Total revenue of $635.4 million, down 18.7%;

 EBIT of $44.4 million, down 34.4%;

 EBIT margin of 7.0%, down 1.7 ppts;

 ROFE of 16.3%, down from 18.6%; and

 Work-in-hand of $2.0 billion.


GROUP FINANCIAL POSITION


Funding, liquidity and capital are managed at Group level, with Divisions focused on working capital and

operating cash flow management. The following financial position commentary relates to the Downer Group.


OPERATING CASH FLOW


Operating cash flow was strong at $243.6 million, up 36.8% on last year due to strong contract performance,

advance payments received and higher distributions from equity accounted investees. EBITDA conversion

continued to be strong at 102.6%, showing a high correlation between earnings and cash.

Operating cash flow ($’m) Dec-14 Dec-13

INVESTING CASH


Total investing cash flow was $123.4 million, largely in line with the prior period amount of $123.5 million.

Reduced capital investment, predominantly in the Mining business, was offset by the acquisitions of RPQ

and AGIS in the current period for a combined total cash consideration of $52.0 million. Excluding

acquisitions, investing cash flow decreased by $51.6 million. Payments for intangible assets has decreased

by $12.3 million compared to pcp and largely represents the Group’s investment in IT systems.


DEBT AND BONDING


The Group’s performance bonding facilities totalled $1,629.1 million at 31 December 2016 with $823.6

million undrawn. There is material available capacity to support the ongoing operations of the Group.


As at 31 December 2016, Downer had liquidity of $1.1 billion comprising cash balances of $602.1 million and

undrawn committed debt facilities of $485.0 million.


The Group continues to be rated BBB (Outlook Stable) by Fitch Ratings.

Page 11 of 39


BALANCE SHEET


The net assets of Downer increased by 1.4% to $2.1 billion.


Cash and cash equivalents increased by $32.7 million, or 5.7%, to $602.1 million, reflecting strong operating

cash flows from operations.


Net debt decreased from $87.4 million at 30 June 2016 to $22.2 million at 31 December 2016. This reflects a

strong cash position and a reduction in gross debt following the prepayment of two ECA guaranteed loans

during the period. The strong cash and reduced net debt position resulted in 1.0% gearing (net debt to net

debt plus equity) at 31 December 2016, down from 4.0% at 30 June 2016. The present value of operating

lease commitments for plant and equipment also reduced from $128.5 million to $122.5 million, representing

an off balance sheet gearing of 6.4% at 31 December 2016, down from 9.4% at 30 June 2016.


Current trade and other receivables decreased $111.7 million to $1,012.6 million. Trade debtor days

(excluding WIP) for the Group decreased by 2.8 days, from 23.6 at 30 June 2016 to 20.8 days. Trade debtor

days (including WIP) for the Group decreased by 6.4 days, from 57.7 days at 30 June 2016 to 51.3 days.


Inventories decreased $27.4 million to $299.8 million reflecting a reduction in components and spare parts

as a result of project completions and tight inventory management.


Current tax assets decreased by $44.8 million to $1.5 million due to the timing of cash tax payments.


Interest in joint ventures and associates increased by $7.1 million, with $ 6.8 million of distributions received

offset by Downer’s share of net profits from joint ventures and associates of $13.9 million.


The net value of Property Plant and Equipment decreased by $0.5 million.

Intangible assets increased by $62.6 million due to $56.6 million of goodwill recognised from the acquisition

of RPQ and AGIS and the Group’s investment in IT systems.

Trade and other payables decreased by $94.7 million as a result of project completions and timing on

payments. Trade creditor days decreased by 5.6 days from 37.2 days at 30 June 2016 to 31.6 days. Trade

and other payables represent 46.3% of Downer’s total liabilities.


Total drawn borrowings of $622.3 million represent 31.0% of Downer’s total liabilities and has decreased by

$27.7 million as a result of the repayment of debt during the period.


Other financial liabilities of $32.4 million increased by $16.6 million and represent 1.6% of Downer’s total

liabilities. The increase reflects the $17.5 million deferred consideration on acquisitions of RPQ and AGIS

partially offset by a lower mark to market revaluation on cross-currency and interest rate swaps.


Deferred tax liability decreased by $3.1 million to $54.6 million and is primarily due to temporary differences

in WIP and accruals.


Provisions of $366.0 million increased by $1.8 million and represents 18.2% of Downer’s total liabilities.

Employee provisions (annual leave and long service leave) made up 81.9% of this balance with the

remainder covering onerous contracts provisions, property and warranty obligations and return conditions

obligations for leased assets.


Shareholder equity increased by $29.9 million as the net profit after tax of $78.2 million was partially offset by

$55.3 million of dividend payments made during the period. Net foreign currency gains on translation of

foreign jurisdictions, particularly in New Zealand, resulted in a movement in the foreign currency translation

reserve by $4.1 million.








Page 12 of 39

DIVIDENDS

The Downer Board resolved to pay a fully franked interim dividend of 12.0 cents per share (12.0 cents per

share in the prior corresponding period), payable on 16 March 2017 to shareholders on the register at 16

February 2017.


The Board also determined to continue to pay a fully imputed dividend on the ROADS security, which having

been reset on 15 June 2016 has a yield of 6.29% per annum payable quarterly in arrears, with the next

payment due on 15 March 2017. As this dividend is fully imputed (the New Zealand equivalent of being fully

franked), the actual cash yield paid by Downer will be 4.53% per annum for the next six months.


ZERO HARM

Downer’s Lost Time Injury Frequency Rate (LTIFR) reduced from 0.84 to 0.55 and Total Recordable Injury

Frequency Rate (TRIFR) reduced from 3.67 to 3.61 per million hours worked.






OUTLOOK


Downer is targeting NPAT of around $175 million for the 2017 financial year.



0.84

0.55

3.67

3.61

3.00

3.50

4.00

4.50

5.00

5.50

6.00

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

Dec-15

Jan-16

Feb-16

Mar-16

Apr-16

May-16

Jun-16

Jul-16

Aug-16Sep-16

Oct-16

Nov-16

Dec-16

TRIFR

LTIFR

Downer Group Safety Performance

(12-month rolling frequency rates)

LTIFRTRIFR

Page 13 of 39

GROUP BUSINESS STRATEGIES AND PROSPECTS FOR FUTURE FINANCIAL YEARS
Downer strives to improve business performance through a focus on safety, enhanced customer

relationships, business transformation, cost efficiencies and productivity gains in response to changing

economic conditions. Downer’s strategic objectives, prospects and risks that could adversely impact the

achievement of these objectives are outlined in the table below:


Strategic

Objective

Prospects Risk Management

Maintain focus

on Zero Harm

Downer is an industry leader but seeks to

continually improve its performance to achieve

its goal of zero work related injuries and

environmental incidents.

Downer’s activities can result in harm to people

and the environment. Downer has sought to

mitigate this risk by assessing, understanding

and mitigating the “critical risks” facing Downer

and implementing Downer’s Cardinal Rules

which provide direction and guidance on these

critical risks.

Build core

markets and

capabilities

Downer will continue to improve its existing

business and build on its market leading

positions, capabilities and Intellectual Property.


Downer will pursue initiatives to achieve these

objectives, including:

The achievement of these strategic

objectives may be affected by

macro-economic risks including global

economic conditions, volatile commodity prices,

reduced capital expenditure in the Australian

resources sector, insourcing by key customers

(e.g. rolling stock maintenance and mining

services), early termination or scope reduction

on existing contracts (e.g. contract mining) and

increasing overseas competition. Downer will

continue to manage its exposure to these risks

through:

 developing and growing Asset

Management capabilities;

 forming strategic partnerships and

joint ventures with leading technology

and knowledge providers;

 focusing more closely on forward

revenue opportunities in public transport

(network construction, operations and

maintenance), electricity networks (through

State Government privatisations),

passenger heavy and light rail, outsourcing

of road maintenance by State

Governments and the nbn roll-out;

 forming strategic partnerships and

joint ventures with leading technology

and knowledge providers and

enhancing Downer’s Customer

Relationship Management (CRM)

program;

 expanding into overseas markets

selectively through existing customer

relationships;

 identification, and rigorous review, of

overseas opportunities;

 enhancing management capability

to improve operational and financial

performance;

 a succession planning process for

all leadership roles and a leadership

development program;

 adapting tendering model for large

infrastructure projects; and

 bid governance processes that ensure i)

there is a substantial level of risk

assessment to inform Downer’s decision

on whether to bid, and the terms of the bid,

and ii) there is a strong focus on bid costs

throughout the tender process; and

 maintaining industry and

geographical diversification to

achieve greater resilience through

economic cycles.


 growth and development strategies to

diversify revenue sources, including

through joint ventures.

Strengthen

customer

relationships

Continuous improvement of the Company’s

engagement with customers, including working

with them constructively to reduce costs and

improve productivity.

Ongoing analysis of markets, customers and

competitors to understand potential impacts

and determine necessary action.

Leveraging “cross-selling” opportunities. Continuing to drive benefits from Downer’s

broad range of capabilities and CRM tools.


Engaging more closely with customers to

understand their needs and play a more

substantial role in their success.

Downer restructured in 2015 to create better

alignment with its customer base and is

implementing a range of initiatives to develop a

more customer-focused organisation.

Page 14 of 39

Drive efficiency
and productivity

Downer has two key internal business

initiatives:

 Fit 4 Business Program: which has

achieved over $600 million in cost

benefits since its launch in FY11; and

 Business Transformation Program:

involves investment in core systems and

the consolidation of business services.


Downer has taken proactive steps to ‘right-size’

its business in alignment with market

conditions.

Failing to take proactive steps to reduce costs

in line with forward revenue projections would

jeopardise the ability to drive further

improvements to business performance. The

focus on business improvement, technological

advancements and cost management is a

fundamental part of Downer’s formal planning

processes, day-to-day management activities

and governance activities.



Continue to improve tender, contract and

project risk management processes.

Rigorous tender, contract and project risk

policies and procedures consistently across the

Group.

Continue to focus on asset utilisation and the

appropriateness of the carrying value and

allocation of non-current assets.

Detailed review of equipment, including age

and valuation. Asset specific maintenance

plans and continued assessment to ensure

equipment is allocated on a best fit-for-purpose

basis.

Assess growth

opportunities

Downer assesses merger and acquisition

opportunities on an ongoing basis, including in

new geographies, with a focus on the following

key criteria:

 strategic fit for Downer;

 growth of capability; and

 appropriate valuation.


Downer undertakes rigorous analysis of

potential opportunities to ensure they meet the

key criteria and are structured to mitigate

downside risks. The company is also focused

on ensuring it remains well within its financing

covenant and credit rating metrics.



Capital

management

Downer intends to maintain strong balance

sheet and financial metrics. It also intends to

maintain an investment-grade external credit

rating.

The Group maintains ample capacity to support

its ongoing operations and continues to be

rated BBB (Stable) by Fitch Ratings.



The following table provides an overview of the key prospects relevant to each of Downer’s service lines and

summarises Downer’s intended strategic response across each sector to maximise the Company’s

performance and realise future opportunities.


Service line Prospects Downer’s response

Transport Services Potential for further outsourcing as Governments

seek greater efficiency and smarter solutions.


Downer is a market leader in Australia and

New Zealand and is well positioned for

future opportunities in both countries.

Downer has a vertically integrated road

services business with end-to-end service

offering, including asphalt production.

Technology and

Communications

Services

Customers are developing new performance-

based contracting models, based on closer

collaboration between parties, which are

generating longer term construction, operations

and maintenance opportunities.


Downer is a market leader in both Australia

and New Zealand and works closely with

its customers in both countries to adapt to

the changing environment and help them

achieve success.


Utilities Services The power, gas and water markets offer long-

term operations and maintenance contract

opportunities, with potential for growth through

increased outsourcing.

In addition, there is substantial investment in

renewable energy as Australia strives to achieve

the Government’s Renewable Energy Target.

Downer has market leading positions in

both Australia and New Zealand and is well

positioned for future opportunities,

including those flowing from State

Government privatisation of electricity

assets.



Page 15 of 39

Rail Governments are seeking value through:
 the procurement of large orders of

passenger rolling stock and long-term

maintenance contracts;

 the franchising of operations and

maintenance of heavy rail, light rail and bus

transport networks; and

 the development of multi-modal transport

infrastructure solutions.


Freight customers are seeking continual

improvements to fleet performance and

reliability, with a strong focus on technology and

innovation.

Downer’s rail asset management model

has a strong focus on ‘return on

investment’ – i.e. increasing fleet

availability and reliability.


Downer maintains strong strategic

partnerships with leading global transport

solutions providers and, through this

model, is pursuing opportunities in rolling

stock manufacture and maintenance and

transport network operations and

maintenance.


The Keolis Downer joint venture is a

leading Australian multi-modal transport

operator, through its light rail and bus

operations.

EC&M EC&M opportunities, particularly in the

resources sector, are declining due to the mining

downturn. They are being replaced by

opportunities at different stages of the

investment / asset lifecycle and across adjacent

sectors.


Downer is building on its leading, multi-

discipline capability, working with

customers to provide the best project

management delivery mode, and

developing its asset management

capabilities to become a strategic solutions

provider across the complete asset

lifecycle.


Downer is also focused on optimising its

performance on existing LNG projects.


Mining Depressed commodity prices have led to

reduced volumes and lower levels of investment,

increasing the industry’s focus on cost reduction.

However, opportunities exist for mining

contractors that can work collaboratively with

customers to help drive productivity

improvements and reduce production costs.

Downer’s Mining division continues to

perform strongly by focusing on cost

reduction, increased efficiencies and close

collaboration with customers.



The business continues to examine

overseas opportunities.



Auditor’s independence declaration


The auditor’s independence declaration, as required under Section 307C of the Corporations Act 2001, is set

out on page 17.


Signed in accordance with a resolution of the Directors.


On behalf of the Directors




R M Harding

Chairman

Sydney, 2 February 2017

Page 16 of 39





KPMG, an Australian partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG

International”), a Swiss entity. Liability limited by a scheme approved under Professional Standards Legislation.


Lead Auditor’s Independence Declaration under Section 307C of the Corporations Act 2001

To: the directors of Downer EDI Limited

I declare that, to the best of my knowledge and belief, in relation to the review for the half-year ended 31

December 2016 there have been:

(i) no contraventions of the auditor independence requirements as set out in the Corporations

Act 2001 in relation to the review; and

(ii) no contraventions of any applicable code of professional conduct in relation to the review.



KPMG


John Teer

Partner

Sydney

2 February 2017





Independent Auditor’s Review Report




To the Members of Downer EDI Limited


Conclusion




We have reviewed the accompanying half-year

financial report of Downer EDI Limited.

Based on our review, which is not an audit, we

have not become aware of any matter that

makes us believe that the half -year financial

report of Downer EDI Limited is not in

accordance with the Corporations Act 2001,

including:

i)

giving a true and fair view of the Group’s

financial position as at 31 December 2016

and of its performance for the half -year


ended on that date; and

ii)


complying with Australian Accounting

Standard AASB 134 Interim Financial

Reporting and the Corporations

Regulations 2001.


The half-year financial report comprises:



the condensed consolidated statement of

financial position as at 31 December 2016;



condensed consolidated statement of profit

or loss and other comprehensive income,

condensed consolidated statement of

changes in equity and condensed

consolidated statement of cash flows for the

half -year ended on that date;



notes A to D comprising a summary of

significant accounting policies and other

explanatory information; and



the Directors’ d eclaration.

The Group comprises Downer EDI Limited (the

Company) and the entities it controlled at the

half -year’s end or from time to time during the

half -year.



Responsibilities of the Directors for the half-year financial report


The Directors of the Company are responsible for:


the preparation of the half -year financial report that gives a true and fair view in accordance

with Australian Accounting Standards and the Corporations Act 2001; and


for such internal control as the Directors determine is necessary to enable the preparation of

the half -year financial report that is free from material misstatement, whether due to fraud or

error.







Page 18 of 39



Auditor’s responsibility for the review of the half-year financial report


Our responsibility is to express a conclusion on the half -year f inancial report based on our review.

We conducted our review in accordance with Auditing Standard on Review Engagements ASRE

2410 Review of a Financial Report Performed by the Independent Auditor of the Entity, in order to

state whether, on the basis of the procedures described, we have become aware of any matter that

makes us believe that the half -year financial report is not in accordance with the Corporations Act

2001 including: giving a true and fair view of the Group’s financial position as at 31 December 2016

and its performance for the half-year ended on that date; and complying with Australian Accounting

Standard AASB 134 Interim Financial Reporting and the Corporations Regulations 2001. As

auditor of Downer EDI Limited, ASRE 2410 requires that we comply with the ethical requirements

relevant to the audit of the annual financial report.

A review of a half -year financial report consists of making enquiries, primarily of persons

responsible for financial and accounting matters, and applying analytical and other review

procedures. A review is substantially less in scope than an audit conducted in accordance with

Australian Auditing Standards and consequently does not enable us to obtain assurance that we

would become aware of all significant matters that might be identified in an audit. Accordingly, we

do not express an audit opinion.


Independence


In conducting our review, we have complied with the independence requirements of the

Corporations Act 2001.











KPMG









John Teer

Partner

Cameron Slapp

Partner


Sydney Sydney


2 February 2017 2 February 2017

Page 19 of 39

Condensed Consolidated Statement of Profit or Loss and Other Comprehensive Income
for the half-year ended 31 December 2016

31 Dec

31 Dec

2016

2015

Note

$'m

$'m

Revenue from ordinary activitiesB23,333.6 3,262.0

Other incomeB21.0 2.6

Total revenue and other income3,334.6 3,264.6

Employee benefits expenseB2(1,378.9)(1,341.2)

Subcontractor costs(729.2)(628.2)

Raw materials and consumables used(567.9)(565.4)

Plant and equipment costs(253.2)(301.3)

Depreciation and amortisation D1,D2(105.0)(128.0)

Other expenses from ordinary activities (193.5)(195.4)

Total expenses(3,227.7)(3,159.5)

Share of net profit of joint ventures and associates13.9 8.1

Earnings before interest and tax120.8 113.2

Finance income4.7 3.8

Finance costs(18.4)(19.6)

Net finance costs(13.7)(15.8)

Profit before income tax107.1 97.4

Income tax expense(28.9)(25.3)

Profit after income tax78.2 72.1

Other comprehensive income

Items that may be reclassified subsequently to profit or loss

-4.1 10.7

-3.8 (1.2)

-(0.3)(1.2)

-(1.1)0.7

6.5 9.0

Total comprehensive income for the period84.7 81.1

Earnings per share (cents)

- Basic earnings per shareB317.6 15.8

-

D

iluted earnings per shareB317.1 15.1

Other comprehensive income for the period (net of tax)

Income tax relating to components of other comprehensive income

The condensed consolidated statement of profit orloss and other comprehensive income should be read in

con

junction with the accompanying notes on pages 24 to 38.

Exchange differences arising on translation of foreign operations

Net loss on cross currency interest rate swaps taken to equity

Net gain / (loss) on foreign currency forward contracts taken to equity

Page 20 of 39

Condensed Consolidated Statement of Financial Position
as at 31 December 2016

DecJun

2016

2016

Note

$'m

$'m

ASSETS

Current assets

Cash and cash equivalents 602.1 569.4

Trade and other receivables1,012.6 1,124.3

Other financial assets12.4 10.1

Inventories299.8 327.2

Current tax assets1.5 46.3

Prepayments and other assets30.1 38.2

Total current assets1,958.5 2,115.5

Non-current assets

Trade and other receivables28.3 17.3

Interest in joint ventures and associates88.7 81.6

Property, plant and equipmentD1987.8 988.3

Intangible assetsD21,032.5 969.9

Other financial assets24.9 22.1

Prepayments and other assets5.0 5.6

Total non-current assets2,167.2 2,084.8

Total assets4,125.7 4,200.3

LIABILITIES

Current liabilities

Trade and other payables916.0 1,010.9

BorrowingsC134.5 45.5

Other financial liabilities18.0 15.1

Employee benefits provision274.6

254.

2

P

rovisions 36.5 51.6

Current tax liabilities3.1 0.5

Total current liabilities1,282.7 1,377.8

Non-current liabilities

Trade and other payables12.9 12.7

BorrowingsC1587.8 604.5

Other financial liabilities14.4 0.7

Employee benefits provision25.1 27.6

Provisions 29.8 30.8

Deferred tax liabilities54.6 57.7

Total non-current liabilities724.6 734.0

Total liabilities2,007.3 2,111.8

Net assets2,118.4 2,088.5

EQUITY

Issued capitalC31,428.8 1,427.8

Reserves(2.8)(8.8)

Retained earnings692.4 669.5

Total equity2,118.4 2,088.5

The condensed consolidated statement of financialposition should be read in conjunction with the

accompanying notes on pages 24 to 38.

Page 21 of 39

Condensed Consolidated Statement of Changes in Equity
for the half-year ended 31 December 2016

Dec 2016

$'m

Issued

capital

Hedge

reserve

Foreign

currency

translation

reserve

Employee

benefits

reserve

Retained

earningsTotal

Balance at 1 July 2016

1,427.8 (2.6)(18.4)12.2 669.5 2,088.5

Profit after income tax

- - - - 78.2 78.2

Other comprehensive income for the period

(net of tax)

- 2.4 4.1 - - 6.5

Total comprehensive income for the period

- 2.4 4.1 - 78.2 84.7

Vested executive incentive shares transactions

1.0 - - (1.0) - -

Share-based employee benefits expense

- - - 1.2 - 1.2

Income tax relating to share-based transactions

during the period

- - - (0.7) - (0.7)

Payment of dividends

(i)

- - - - (55.3)(55.3)

Balance at 31 December 2016

1,428.8 (0.2)(14.3)11.7 692.4 2,118.4

Dec 2015

$'m

Issued

capital

Hedge

reserve

Foreign

currency

translation

reserve

Employee

benefits

reserve

Retained

earningsTotal

Balance at 1 July 2015

1,449.1 (0.3)(27.8)12.3 602.0 2,035.3

Profit after income tax

- - - - 72.1 72.1

Other comprehensive income for the period

(net of tax)

- (1.7)10.7 - - 9.0

Total comprehensive income for the period

- (1.7)10.7 - 72.1 81.1

Group on-market share buy-back

(6.4) - - - - (6.4)

Vested executive incentive shares transactions

0.9 - - - - 0.9

Share-based em

ployee benefits expense

- - - 2.4 - 2.4

Income tax relating to share-based transactions

during the period

- - - (0.1) - (0.1)

Payment of dividends

(i)

- - - - (56.7)(56.7)

Balance at 31 December 2015

1,443.6 (2.0)(17.1)14.6 617.4 2,056.5

The condensed consolidated statement of changes in equity should be read in conjunction with the accompanying

notes on pages 24 to 38.

(i)

Payment of dividend relates to the 2015 final dividend and $4.8m ROADS dividends paid during the financial period.

(i)

Payment of dividend relates to the 2016 final dividend and $4.3m ROADS dividends paid during the financial period.

Page 22 of 39

Condensed Consolidated Statement of Cash Flows
for the half-year ended 31 December 2016

31 Dec

31 Dec

2016

2015

$'m

$'m

Cash flows from operating activities

Receipts from customers3,821.4 3,690.6

Distributions from equity accounted investees6.8 2.1

Payments to suppliers and employees(3,596.5)(3,537.6)

Interest received4.1 3.5

Interest and other costs of finance paid(17.3)(14.7)

Net income tax received25.1 34.2

Net cash inflow from operating activities 243.6 178.1

Cash flows from investing activities

Proceeds from sale of property, plant and equipment17.8 12.0

Payments for property, plant and equipment(72.2)(112.0)

Payments for intangible assets(16.4)(28.7)

Receipt from investments

- 0.6

Advances to joint ventures - (1.5)

Proceeds from sale of businesses - 7.2

Payments for businesses acquired(52.6)(1.1)

Net cash used in investing activities(123.4)(123.5)

Cash flows from financing activities

Group on-market share buy-back - (6.4)

Proceeds from borrowings - 168.9

Repayments of borrowings(32.8)(44.8)

Dividends paid(55.3)(56.7)

Net cash (used in) / inflow from financing activities(88.1)61.0

Net increase in cash and cash equivalents32.1 115.6

Cash and cash equivalents at the beginning of the period569.4 372.2

Effect of exchange rate changes0.6 1.7

Cash and cash equivalents at the end of the period602.1 489.5

The condensed consolidated statement of cash flows should be read in conjunction with the accompanying notes

on pages 24 to 38.

Page 23 of 39

Notes to the condensed consolidated financial report
for the half-year ended 31 December 2016

About this report

Statement of compliance and basis of preparation

Rounding of amounts

Accounting estimates and judgements

Business performance

B1. Segment informationB3. Earnings per share

B2. Profit from ordinary activitiesB4. Subsequent events

B1. Segment information

- Transport Services

- Technology and Communication Services (Tech & Comms Services)

- Utilities Services

-Rail

- Engineering, Construction and Maintenance (EC&M)

- Mining

There have been no changes to the composition of the Group's reportable segments since last reported in the 2016

Annual Report.

The reportable segments identified within the Group are outlined below:

An operating segment is a component of an entity that engages in business activities from which it may earn

revenue and incur expenses. The operating segments havebeen identified based on the nature of the service

provided and the internal reports that are reviewed regularly by the Group CEO in assessing performance and in

determinin

g the allocation of resources.

A

B

These condensed consolidated half-yearFinancial Report (Financial Report) represent the consolidated results of

Downer EDI Limited (ABN 97 003 872 848). The Financial Report is general purpose financial statements which has

been prepared in accordance with AASB 134Interim Financial Reportingand theCorporations Act 2001(Cth), and

with IAS 34 Interim Financial Reporting.

The Financial Report does not include all the information required for an annual financial report and should be read

in con

junction with the 2016 Annual Report.

Accounting policies are selected and applied in a manner thatensures the resulting financial information satisfies

the concepts of relevance and reliability, thereby ensuring that the substance of the underlying transactions or other

events is reported. The accounting policies and methods of computation applied in the Financial Report are

consistent with those adopted and disclosed in the 2016 Annual Report. Amounts in the Financial Report are

presented in Australian dollars unless otherwise notedand has been prepared on a historical cost basis, except for

r

evaluation of certain financial instruments.

The Financial Report was authorised for issue by the Directors on 2 February 2017.

Downer is a company of the kind referred to inASIC Corporations (Rounding in Financial / Directors’ reports)

Instrument 2016/191, relating to the “rounding off” of amounts in the Directors' Report and consolidated financial

statements. Unless otherwise expressly stated, amounts have been rounded off to the nearest whole number of

millions of dollars and one place of decimals representing hundreds of thousands of dollars in accordance with that

Instrument. Amounts shown as $- re

present amounts less than $50,000 which have been rounded down.

Significant judgement, estimates and assumptions about future events are made by management when applying

accounting policies and preparing theFinancial Report which are consistent with those described in the 2016 Annual

Report.

Page 24 of 39

Notes to the condensed consolidated financial report - continued
for the half-year ended 31 December 2016

B1. Segment information - continued

B1-01B1-02B1-03B1-06B1-04B1-05

B1-07

Tech &

31 Dec 2016TransportCommsUtilities

$'mServicesServices ServicesRailEC&MMining Total

Revenue

885.5 245.9 442.3 202.0 951.6 612.2

5.2

3,344.7

Inter-segment sales

- - - - - -

(10.1)(10.1)

Total segment revenue

885.5 245.9 442.3 202.0 951.6 612.2 (4.9) 3,334.6

25.7 - - 197.7 21.8 23.2 - 268.4

911.2 245.9 442.3 399.7 973.4 635.4 (4.9) 3,603.0

41.4 21.7 20.8 14.0 27.1 44.4

(48.6)

120.8

Tech &

31 Dec 2015TransportCommsUtilities

$'mServicesServices ServicesRailEC&MMining

Total

Revenue771.8 249.9 376.5 211.5 912.1 758.2 9.7

3,289.7

Inter-segment sales - - - - - - (25.1)

(25.1)

Total segment revenue 771.8 249.9 376.5

211.5 912.1 758.2 (15.4) 3,264.6

31.1 - - 208.6 15.7 23.4 -

278.8

802.9 249.9 376.5 420.1 927.8 781.6 (15.4) 3,543.4

31.6 14.1 22.8 4.5 20.6 67.7 (48.1)

113.2

Reconciliation of segment net operating profit to net profit after tax:

31 Dec

31 Dec

2016

2015

$'m

$'m

Segment net operating profit169.4 161.3

Unallocated:

Research and development incentives4.2 5.0

Bid costs referable to New Intercity Fleet rail project

(i)

(10.0)

-

Bid costs referable to Canberra light rail project

(ii)

-

(13.0)

Settlement of contractual claims(5.0) -

Corporate costs(37.8)(40.1)

Total unallocated (48.6)(48.1)

Earnings before interest and tax120.8 113.2

Net finance costs(13.7)(15.8)

Profit before income tax107.1 97.4

Income tax expense(28.9)(25.3)

Profit after income tax78.2 72.1

(i)

This is a non-statutory disclosure as it relates to Downer's share of revenue from equity accounted joint ventures and associates.

(ii)

Downer was a member of the ACTivate consortium. On 1 February 2016, the consortium was advised that it had

not been successful in its bid to build, operate and maintain Canberra's new light rail project ("Capital Metro").

Accordingly, an amount of $13.0 million, referable to Downer's share of pre-tax bid costs, has been expensed.

(i)

Downer was a member of the Constellation Rail consortium. On 18 August 2016, the consortium was advised that it

had not been successful in its bid to deliver and maintain the New Intercity Fleet (NIF) for Transport for NSW.

Accordingly, an amount of $10.0 million, referable to Downer's share of pre-tax bid costs, has been expensed.

Share of sales revenue from joint

ventures and associates

(i)

Total revenue including joint

ventures and other income

(i)

Total revenue including joint

ventures and other income

(i)

Segment results

Total reported segment results

(EBIT)

Total reported segment results

(EBIT)

Un-

allocated

Un-

allocated

Share of sales revenue from joint

ventures and associates

(i)

Page 25 of 39

Notes to the condensed consolidated financial report - continued
for the half-year ended 31 December 2016

B2. Profit from ordinary activities

a) Revenue and other income

31 Dec

31 Dec

2016

2015

$'m

$'m

Sales revenue

Rendering of services2,137.3 1,955.9

Mining services598.0 739.4

Construction contracts482.1 449.0

Sale of goods104.8 98.1

Other revenue11.4 19.6

Total revenue from ordinary activities3,333.6 3,262.0

Other income1.0 2.6

Total revenue and other income3,334.6 3,264.6

Share of sales revenue from joint ventures and associates

(i)

268.4 278.8

Total revenue including joint ventures and associates and other income

(i)

3,603.0 3,543.4

b) Operating expenses

31 Dec

31 Dec

2016

2015

$'m

$'m

Employee benefits expense:

- Defined contribution plans

73.9 69.6

- Share-based employee benefits expense

1.2 2.4

- Employee benefits1,303.8 1,269.2

Total employee benefits expense

1,378.9 1,341.2

Operating lease expenses relating to land and building33.6 34.2

Operating lease expenses relating to plant and equipment45.5 49.4

Total operating lease expenses79.1 83.6

- 2.3

c) Individually significant items

31 Dec

31 Dec

2016

2015

$'m

$'m

- Bid costs referable to New Intercity Fleet rail project

(i)

10.0 -

- Bid costs referable to Canberra light rail project

(ii)

- 13.0

(i)

This is a non-statutory disclosure as it relates to Downer's share of revenue from equity accounted joint ventures and associates.

Net loss on disposal of business

The following material items are relevant to an understanding of the Group's

financial

performance:

(i)

Downer was a member of the Constellation Rail consortium. On 18 August 2016, the consortium was advised

that it had not been successful in its bid to deliver and maintain the New Intercity Fleet (NIF) for Transport for NSW.

Accordingly, an amount of $10.0 million, referable to Downer's share of pre-tax bid costs, has been expensed.

(ii)

Downer was a member of the ACTivate consortium. On 1February 2016, the consortium was advised that it had

not been successful in its bid to build, operate and maintain Canberra's new light rail project ("Capital Metro").

Accordingly, an amount of $13.0 million, referable to Downer's share of pre-tax bid costs, has been expensed.

Page 26 of 39

Notes to the condensed consolidated financial report - continued
for the half-year ended 31 December 2016

B3. Earnings per share

Basic earnings per share

31 Dec31 Dec

2016

2015

Profit attributable to members of the parent entity ($'m)78.2 72.1

Adjustment to reflect ROADS dividends paid ($'m)(4.3)(4.8)

73.9 67.3

Weighted average number of ordinary shares (WANOS) on issue (m's)

(i)

420.5 427.1

Basic earnings per share (cents per share)17.6 15.8

Diluted earnings per share

31 Dec31 Dec

2016

2015

78.2 72.1

Weighted average number of ordinary shares - diluted

Weighted average number of ordinary shares (WANOS) on issue (m's)

(i)(ii)

420.5 427.8

WANOS adjustment to reflect potential dilution for ROADS (m's)

(iii)

37.7 50.9

WANOS used in the calculation of diluted EPS (m's)458.2 478.7

Diluted earnings per share (cents per share)17.1 15.1

(i)

(ii)

(iii)

B4. Subsequent events

a)

b)

c)

The Group's operations in future financial years;

The results of those operations in future financial years; or

The Group's state of affairs in future financial years.

At the date of this report there is no matter or circumstance that has arisen since the end of the period, that has

significantly affected, or may significantly affect:

Profit attributable to members of the parent entity ($'m)

The calculation of basic earnings pershare (EPS) is based on the profit attributable to ordinary shareholders and

the weighted-average number of ordinary shares outstanding.

The calculation of diluted EPS is based on the profit attributable to ordinary shareholders and the weighted-average

number of ordinary shares outstanding after adjustments for the effects of all dilutive potential ordinary shares.

Profit attributable to members of the parent entity used in calculating EPS ($'m)

The WANOS on issue has been adjusted by the weighted average effect of on-market share buy-back and the unvested

executive incentive shares.

For diluted earnings per share, the WANOS has been further adjusted by the potential vesting of executive incentive shares.

The WANOS adjustment is the value of ROADS that could potentially be converted into ordinary shares at the reporting

date. It is calculated based on the issued value of ROADS in New Zealand dollars converted to Australian dollars at the spot

rate prevailing at the reporting date, which was $192.4 million (Dec 2015: $187.5 million), divided by the average market

price of the Company's ordinary shares for the period 1 July 2016 to 31 December 2016 discounted by 2.5% according to the

ROADS contract terms, which was $5.10 (Dec 2015: $3.68).

Page 27 of 39

Notes to the condensed consolidated financial report - continued
for the half-year ended 31 December 2016

Capital structure and financing

C1. BorrowingsC3. Issued capital

C2. Financing facilitiesC4. Dividends

C1. Borrowings

Dec

Jun

2016

2016

$'m

$'m

Current

Secured:

-Finance lease liabilities 17.5 13.1

-Hire purchase liabilities 0.5 0.5

-Supplier finance - 5.8

18.0 19.4

Unsecured:

-Bank loans 5.5 15.1

-AUD medium term notes (series 2009-1)13.3 13.3

-Deferred finance charges(2.3)(2.3)

16.5 26.1

Total current borrowings34.5 45.5

Non-current

Secured:

-Finance lease liabilities 3.0 13.9

-Hire purchase liabilities 0.3 0.6

3.3 14.5

Unsecured:

-Bank loans 4.8 8.6

-USD notes147.9 144.1

-AUD notes 30.0 30.0

-AUD medium term notes (series 2009-1)6.7 13.3

-AUD medium term notes (series 2013-1)150.0 150.0

-AUD medium term notes (series 2015-1)250.0 250.0

-Deferred finance charges(4.9)(6.0)

584.5 590.0

Total non-current borrowings587.8 604.5

Total borrowings622.3 650.0

C

Page 28 of 39

Notes to the condensed consolidated financial report - continued
for the half-year ended 31 December 2016

C2. Financing facilities

Financing facilities

Dec

Jun

2016

2016

$'m

$'m

Syndicated bank loan facility400.0 400.0

Bilateral bank loan facilities85.0 125.0

Total unutilised bank loan facilities485.0 525.0

Syndicated bank bonding facilit

y210.0 -

Bilateral bank and insurance company bonding facilities613.6 614.5

Total unutilised bonding facilities823.6 614.5

Bank loans

Syndicated loan facility

-

-

Bilateral bank loans

USD notes

AUD notes

AUD Medium Term Notes (MTNs)

The Group has the following MTNs on issue:

-

-

-

The above facilities and notes are subject to certain Group guarantees.

Finance lease / Hire purchase / Supplier finance facilities

Series 2015-1 for $250.0 million, which matures in March 2022.

The Group has certain secured facilities of these types which are for an aggregate amount of $21.3 million and which

amortise over different

periods of up to three years.

At 31 December 2016, the Group had the following facilities that were not utilised:

The s

yndicated loan facility, totalling $400.0 million, is unsecured and is split into two tranches:

USD unsecured private placement notes are on issue for a total amount of US$107.0 million. US$7.0 million notes

mature in September 2019 and US$100.0 million in July 2025. The USD denominated principal and interest amounts

have been full

y hedged against the Australian dollar.

AUD unsecured private placement notes are on issue for a total amount of $30.0 million with a maturity date of July

2025.

Series 2009-1 amortises through even semi-annual instalments, until the final maturity date of April 2018 and has

a balance of $20.0 million;

Series 2013-1 for $150.0 million

, which matures in November 2018; and

These facilities are unsecured and due for renewal in multiple tranches in calendar years 2017 and 2018 apart from

$10.3 million loan which is supported by an Export Credit Agency (ECA) guarantee, which amortises through even

semi-annual instalments with a final maturit

y date of July 2018.

$200.0 million maturin

g in April 2019; and

$200.0 million maturin

g in April 2021.

Page 29 of 39

Notes to the condensed consolidated financial report - continued
for the half-year ended 31 December 2016

C2. Financing facilities - continued

Covenants on financing facilities

Bonding

Refinancing requirements

Credit ratings

$805.5 million (refer to Note D5) of these facilities were utilised as at 31 December 2016 with $823.6 million

unutilised. $613.6 million of these facilities have varying maturity dates between calendar years 2017 and 2018. The

remaining $210.0 million relates to a syndicated bonding facility referable to the Sydney Growth Trains project with a

maturity date of December 2019.

Certain of the Group's financing facilities contain undertakings to comply at all times with financial covenants. This

requires the Group to operate within certain financial ratios as well as ensuring that subsidiaries that contribute

certain minimum threshold amounts of Group EBIT andGroup Total Tangible Assets are guarantors under various

facilities.

The Group currently has an Investment Grade credit rating of BBB (Outlook Stable) from Fitch Ratings. Where the

credit rating is reduced or placed on negative outlook, customers and suppliers may be less willing to contract with

the Group. Furthermore, banks and other lending institutions may demand more stringent terms (including increased

pricing, reduced tenors and lower facility limits) on debt and bonding facilities to reflect the deteriorating credit risk

profile.

The underlying risk being assumed by the relevant financier under all bonds is Downer corporate credit risk, rather

than

project specific risk.

Where existing facilities approach maturity, the Group will negotiate with existing and new financiers to extend the

maturity date of these facilities. The Group’s financial metrics and credit rating as well as conditions in financial

markets and other factors may influence the outcome of these negotiations.

The Group has the flexibility in respect of certain committed facility amounts (shown as part of the unutilised bilateral

bank loan facilities

) which can, at the election of the Group, be utilised for bonding purposes.

The main financial covenants which the Group is subject to areNet Worth, Interest Service Coverage (calculated as

rollin

g 12 month EBIT to Net Interest Expense) and Leverage (calculated as Net Debt to Total Capitalisation).

Financial covenant testing is undertaken and reported to the Board on a monthly basis. Reporting of financial

covenants to financiers occurs semi-annually for the rolling 12 month periods to 30 June and 31 December. The

Grou

p was in compliance with all its financial covenants as at 31 December 2016.

The Group has $1,629.1 million of unsecured bank guarantee and insurance bond facilities to support its contracting

activities. $768.0 million of these facilities are provided to the Group on a committed basis and $861.1 million on an

uncommitted basis. These facilities are sub

ject to certain Group guarantees.

Page 30 of 39

Notes to the condensed consolidated financial report - continued
for the half-year ended 31 December 2016

C3. Issued capital


Dec

Jun

2016

2016

$'m

$'m

Ordinary shares

424,785,204 ordinary shares (Jun 2016: 424,785,204)1,270.2 1,270.2

Unvested executive incentive shares

4,257,373 ordinary shares (Jun 2016: 4,453,456)(20.0)(21.0)

Redeemable Optionally Adjustable Distributing Securities (ROADS)

200,000,000 ROADS (Jun 2016: 200,000,000)178.6 178.6

1,428.8 1,427.8

Fully paid ordinary share capital

Fully paid ordinary shares carry one vote per share and carry the right to dividends.

m's $'m

m's $'m

Fully paid ordinary share capital

Balance at the beginning of the financial period / year424.8 1,270.2 432.7 1,296.7

Group on-market share buy-back - - (7.9)(26.5)

Balance at the end of the financial period / year424.8 1,270.2 424.8 1,270.2

Unvested executive incentive shares

Balance at the beginning of the financial period / year4.5 (21.0)5.3 (26.2)

Vested executive incentive shares transactions

(i)

(0.2)1.0 (0.8)5.2

Balance at the end of the financial period / year4.3 (20.0)4.5 (21.0)

Redeemable Optionally Adjustable Distributing

Securities (ROADS)

m's $'m

m's $'m

200.0 178.6 200.0 178.6

Jun

Dec

Jun

Unvested executive incentive shares are stock marketpurchases and are held by theExecutive Employee Share

Plan Trust under the Long Term Incentive (LTI) plan.From the 2011 LTI plan onwards, no dividends will be

distributed on shares held in trust during the performance measurement and service periods. Accumulated dividends

will be paid out to executives after all vesting conditionshave been met. Otherwise, excess net dividends are retained

in the trust to be used by the Company to acquire additional shares on the market for employee equity plans.

2016

Balance at the beginning and at the end of the

financial

period / year

2016

2016

Dec

2016

(i)

Represents 196,083 vested shares for a value of $955,174, referable to the second deferred component of the 2014 STI award and first deferred

component of the 2015 STI. June 2016 figures referable to the first deferred component of the 2014 STI award totalling 842,537 vested shares for a

value of $5,155,989.

Page 31 of 39

Notes to the condensed consolidated financial report - continued
for the half-year ended 31 December 2016

C4. Dividends

a) Ordinary shares

2017

Interim

2016

Final

2016

Interim

Dividend per share (in Australian cents)12.0 12.012.0

Franking percentage100%100%100%

Cost (in $'m)51.0 51.0 51.7

Dividend record date16/02/201718/08/2016 18/02/2016

Payment date16/03/201715/09/2016 17/03/2016

b) Redeemable Optionally Adjustable Distributing Securities (ROADS)

2017Quarter 1Quarter 2Total

Dividend per ROADS (in Australian cents)1.08 1.09 2.17

100%100%100%

Cost (in A$'m)2.1 2.2 4.3

Payment date15/09/2016 15/12/2016

2016Quarter 1Quarter 2Quarter 3Quarter 4Total

Dividend per ROADS (in Australian cents)1.18 1.22 1.17 1.24 4.81

100%100%100%100%100%

Cost (in A$'m)2.4 2.4 2.3 2.5 9.6

Payment date15/09/2015 15/12/2015 15/03/2016 15/06/2016

New Zealand imputation credit percentage

New Zealand imputation credit percentage

The 2017 interim dividend has not been declared at the reporting date and therefore is not reflected in the financial

statements.

Page 32 of 39

Notes to the condensed consolidated financial report - continued
for the half-year ended 31 December 2016

Other disclosures

D1. Property, plant and equipmentD4. Acquisition and disposal of businesses

D2. Intangible assetsD5. Contingent liabilities

D3. Joint arrangements and associate entities

D1. Property, plant and equipment

Freehold

Land and

Buildings

Plant and

Equipment

Equipment

under

Finance

LeaseTotal

Carrying amount as at 1 July 2016

68.5 859.9 59.9 988.3

Additions

- 86.3 4.3 90.6

Disposals at net book value

- (14.2)(0.8)(15.0)

Acquisition of businesses

- 16.3 - 16.3

Depreciation expense

(2.4)(82.0)(6.9)(91.3)

Reclassifications at net book value

0.6 2.7 (3.3) -

Reclassified as intangible assets

(i)

- (3.0) - (3.0)

0.1 2.1 (0.3)1.9

Closing net book value as at 31 December 2016

66.8 868.1 52.9 987.8

Cost96.2 2,121.4 105.1 2,322.7

Accumulated depreciation(29.4)(1,253.3)(52.2)(1,334.9)

Carrying amount as at 1 July 2015

59.1 895.1 82.9 1,037.1

Additions

13.6 168.8 14.0 196.4

Disposals at net book value

- (16.8)(0.5)(17.3)

Acquisition of business

- 1.7 - 1.7

Disposals of business at net book value

- (0.6) - (0.6)

Depreciation expense

(4.7)(217.7)(12.1)(234.5)

Reclassifications at net book value

- 24.4 (24.4) -

Reclassified as intangible assets

(i)

- (1.2) - (1.2)

0.5 6.2 - 6.7

Closing net book value as at 30 June 2016

68.5 859.9 59.9 988.3

Cost95.5 2,143.3 109.8 2,348.6

Accumulated depreciation(27.0)(1,283.4)(49.9)(1,360.3)

Net foreign currency exchange differences at net

book value

(i)

Refers to the reclassification of software from Capital Work In Progress to Intangible Assets.

Jun 2016

Net foreign currency exchange differences at net

book value

D

Dec 2016

$'m

Page 33 of 39

Notes to the condensed consolidated financial report - continued
for the half-year ended 31 December 2016

D2. Intangible assets

Goodwill

Customer

contracts and

relationships

Intellectual

property,

software and

system

developmentTotal

Carrying amount as at 1 July 2016

805.3 37.1 127.5 969.9

Additions

- - 16.4 16.4

Acquisition of businesses

56.6 - - 56.6

Reclassifications at net book value

(i)

- - 3.0 3.0

Amortisation expense

- (3.4)(10.3)(13.7)

0.3 - - 0.3

Closing net book value as at 31 December 2016

862.2 33.7 136.6 1,032.5

Cost

938.2 50.1 271.5 1,259.8

Accumulated amortisation and impairment

(76.0)(16.4)(134.9)(227.3)

Carrying amount as at 1 July 2015

781.7 43.5 93.8 919.0

Additions

- - 49.1 49.1

Acquisition of business

20.5 - - 20.5

Reclassifications at net book value

(i)

- - 1.2 1.2

Amortisation expense

- (6.4)(17.8)(24.2)

3.1 - 1.2 4.3

Closin

g net book value as at 30 June 2016

805.3 37.1 127.5 969.9

Cost

881.3 50.1 255.3 1,186.7

Accumulated amortisation and impairment

(76.0)(13.0)(127.8)(216.8)

Net foreign currency exchange differences at net

book value

(i)

Refers to the reclassification of software from Capital Work In Progress to Intangible Assets.

Net foreign currency exchange differences at net

book value

Dec 2016

$'m

Jun 2016

Page 34 of 39

Notes to the condensed consolidated financial report - continued
for the half-year ended 31 December 2016

D3. Joint arrangements and associate entities

Name of arrangement

Country of

operation

31 Dec 2016

%

31 Dec 2015

%

Allied Asphalt LimitedNew Zealand

50

50

Australia

50

50

Australia

50

50

Australia

50

50

New Zealand

50

50

Isaac Asphalt Limited New Zealand

50

50

RTL Mining and Earthworks Pty Ltd Australia

44

44

VEC Shaw Joint VentureAustralia

50

50

Associates

Australia

27

27

Australia

49

49

Australia

49

49

(i)

Joint ventures

There are no material commitments held by joint ventures or associates.

Bitumen Importers Australia Joint

Venture

Bitumen Importers Australia Pt

y Ltd

EDI Rail-Bombardier

Trans

portation Pty Ltd

Emulco Limited

MHPS Plant Services Pty Ltd

Reliance Rail Pty Ltd

(i)

Downer previously wrote down its investment in Reliance Rail Pty Ltd to nil. The New South Wales Government has the right in

February 2018 to acquire Downer's ownership of Reliance Rail Pty Ltd for nil consideration. As a consequence, Downer does

not include Reliance Rail Pty Ltd in its equity accounted disclosure.

Keolis Downer Pty Ltd

Construction of bitumen

stora

ge facility

Bitumen importer

Road construction

Sale and maintenance of

railwa

y rolling stock

Emulsion plant

Principal activity

Operation and maintenance of

Gold Coast light rail, Melbourne

tram network and bus

operation

Ownership interest

Manufacture and supply of

as

phalt

Contract mining; civil works

and

plant hire

Refurbishment, construction

and maintenance of boilers

Rail manufacturing and

maintenance

All joint ventures and associates have a statutory reporting date of 30 June, with the exception of MHPS Plant

Services Pty Ltd which has a statutory reporting date of 31 March.

The Group has interests in the following joint ventures and associates which are equity accounted:

Asphalt plant

Page 35 of 39

Notes to the condensed consolidated financial report - continued
for the half-year ended 31 December 2016

D4. Acquisition and disposal of businesses

Acquisitions

RPQ Group

Dec 2015

The goodwill resulting from this acquisition represents future market development, expected revenue growth

opportunities, technical talent and expertise, and the benefit of expected synergies. These benefits are not

recognised separately from goodwill because they do not meetthe recognition criteria for identifiable intangible

assets. None of the goodwill arising on this acquisition is expected to be deductible for tax purposes.

The Group has reported provisional purchase price allocation for the RPQ acquisition. The final determination of the

fair value of acquired identifiable assets and liabilities is expected to be completed by 30 June 2017.

On 1 October 2016, the Group acquired 100% of RPQ Group (RPQ) for a gross consideration of $55.0 million which

includes cash consideration of $47.5 million and $7.5 million deferred consideration. The principal activities of RPQ

include the supply of asphalt, bitumen spray sealing, road milling and profiling, road maintenance, foam bitumen

stabilisation, mobile asphalt production, mobile crushing and equipment hire. The RPQ acquisition increases the

Group's capabilities in the Roading business.

Dec 2016

On 18 December 2015, the Group acquired 100% of Green Vision Recycling Limited for $0.9 million. Green Vision is

a New Zealand company specialised in recycling horizontal infrastructure (roads, footpath, kerbs and soil).

AGIS

On 1 July 2016, the Group acquired 100% of AGIS Group Pty Limited (AGIS) and its subsidiaries. AGIS provides

project management, systems engineering and integration, and capability development advice to a range of

government agencies including the Department of Defence,Australian Defence Force and Department of Foreign

Affairs and Trade.

Total cash outflow for this acquisition was $6.0 million, which comprises a consideration of $17.3 million, net of $1.3

million cash balances acquired and $10.0 million deferred consideration. The goodwill resulting from this acquisition

represents future market development, expected revenue growth, technical talent and expertise and the benefit of

expected synergies. These benefits are not recognised separately from goodwill because they do not meet the

criteria for identifiable intangible assets. None of the goodwillarising on this acquisitionis expected to be deductible

for tax purposes.

The Group has reported provisional purchase price allocation for the AGIS acquisition. The final determination of the

fair value of acquired identifiable assets and liabilities is expected to be completed by 30 June 2017.

Page 36 of 39

Notes to the condensed consolidated financial report - continued
for the half-year ended 31 December 2016

D4. Acquisition and disposal of businesses - continued

Disposals

The Group did not dispose any business during the period ended 31 December 2016.

D5. Contingent liabilities

Dec

Jun

2016

2016

$'m

$'m

Bonding

805.5722.0

Other contingent liabilities

i)

ii)

iii)

iv)

v)

The Group is subject to product liability claims. Provision is made for the potential costs of carrying out

rectification works based on known claims and previous claims history. However, as the ultimate outcome of

these claims cannot be reliably determined at the date of this report, contingent liability may exist for any amounts

that ultimately becomes payable in excess of current provisioning levels.

The Group is subject to design liability in relation to completed design and construction projects. The Directors

are of the opinion that there is adequate insurance to cover this area and accordingly, no amounts are recognised

in the financial statements.

Controlled entities have entered into various joint arrangements under which the controlled entity is jointly and

severally liable for the obligations of the relevant joint arrangements.

The Group carries the normal contractor’s and consultant’s liability in relation to services, supply and construction

contracts (for example, liability relating to professional advice, design, completion, workmanship, and damage),

as well as liability for personal injury/property damage during the course of a project. Potential liability may arise

from claims, disputes and/or litigation/arbitration by or against Group companies and/or joint venture

arrangements in which the Group has an interest. The Group is currently managing a number of claims,

arbitration and litigation processes in relation to services, supply and construction contracts as well as in relation

to personal injury and property damage claims arising from project delivery.

Several New Zealand entities in the Group have been named as co-defendants in four “leaky building” claims.

The leaky building claims where Group entities are co-defendants generally relate to water damage arising from

design and construction methodologies (and certification) for residential and other buildings that were common in

New Zealand during the early-mid 2000s. The Directors are of the opinion that disclosure of any further

information relating to the leaky building claims would be prejudicial to the interests of the Group.

Dec 2015

On 31 August 2015, the Group sold the Rimtec business to Rimex Wheel Pty Ltd for a total consideration of $7.2

million. The Grou

p has incurred $2.3 million loss as a result of this transaction.

The Group is required under certain contracts to provideguarantees and indemnities to counterparties relating to

contract performance for varying amounts, some of which are indeterminable.

The Group has bank guarantees and insurance bonds on issue in

respect of contract performance in the normal course of business

Dec 2016

Page 37 of 39

Notes to the condensed consolidated financial report - continued
for the half-year ended 31 December 2016

D5. Contingent Liabilities - continued

vi)

vii)

viii)

ix)

Ground subsidence at the Waratah Train Maintenance Centre located on Manchester Road, Auburn (‘AMC’) has

been identified. The design and construction of the AMC formed part of the Waratah Train Project, with Reliance

Rail contracting Downer to design and build the AMC. In turn, Downer subcontracted this work to John Holland

Pty Ltd. The design and construction of the areas inwhich subsidence has been observed formed part of the

subcontractor’s design and construct obligations. Investigations into the causes of the subsidence continue with

an estimated remediation cost in the order of $70 million. While it is too early to reliably estimate the total cost of

the remediation, in the opinion of the Directors there is no material exposure to either Downer EDI Rail Pty

Limited or Downer EDI PPP Maintenance Pty Limited arising from the subsidence, based on the fact that there

are a range of recovery options being pursued.

On 16 September 2015, the Group announced that it had terminated a contract with Tecnicas Reunidas S.A.

(“TR”) following TR’s failure to remedy a substantial breach of the contract and that the Group would be pursuing

a claim against TR in the order of $65 million. Downer has since demobilised from the site and has commenced a

claim that will be determined via an arbitration process, with a hearing date scheduled for June 2018. TR has

initiated a counter-claim. The Directors are of the opinion that disclosure of any further information relating to this

matter would be prejudicial to the interests of the Group.

The Group is defending a claim brought by Port Waratah Coal Services Limited and a cross claim by another

defendant, Menard Bachy Pty Ltd in respect of alleged non-conforming excavation and civil work performed at

Kooragang Island Coal Terminal by Downer and its joint venture partner, Daracon Contractors Pty Ltd. The value

of the claim against all defendants (Downer is one of five defendants) is $39 million. The Directors are of the

opinion that disclosure of any further information relating to this matter would be prejudicial to the interests of the

Group.

Under the terms of the agreement reached between the New South Wales Government and Reliance Rail, the

Group has a contingent commitment to pay Reliance Rail $12.5 million in 2018 should it be required to refinance

Reliance Rail's senior debt.

Page 38 of 39

Directors' Declaration
for the half-year ended 31 December 2016

In the opinion of the Directors' of Downer EDI Limited:

(a)

(i)

(ii)

(b)

On behalf of the Directors

R M Harding

Chairman

Sydney, 2 February 2017

the condensed consolidated half-year Financial Report and notes set out on pages 20to38, arein

accordance with the Corporations Act 2001 (Cth), including:

givinga true andfairviewof the Group's financial position as at 31 December 2016 and ofits

performance for the six month period ended on that date; and

complyingwithAustralian Accounting StandardAASB134Interim Financial Reportingand the

Corporations Regulations 2001; and

there are reasonable groundstobelieve that the Companywillbe abletopayitsdebts as and when they

become due and payable.

Signed in accordance with a resolution of the Directors:

Page 39 of 39



Media/ ASX and NZX Release

2 February 2017


DOWNER REPORTS NET PROFIT AFTER TAX OF $78.2 MILLION

AND INCREASES FULL YEAR GUIDANCE

Downer EDI Limited (Downer) today announced its financial results for the six months to

31 December 2016:

 Net profit after tax (NPAT) of $78.2 million, up 8.5% on the previous corresponding period;

 Total revenue of $3.6 billion, up 1.7%;

 Earnings before interest and tax (EBIT) of $120.8 million, up 6.7%;

 Operating cash flow of $243.6 million, representing cash conversion of 102.6% of earnings

before interest, tax, depreciation and amortisation (EBITDA);

 Gearing of 1.0% (6.4% including off-balance sheet debt);

 Work-in-hand of $21.1 billion, up from $18.6 billion at 30 June 2016; and

 Full year NPAT guidance increased from $163 million to around $175 million.

The result includes the write-off of $10 million in pre-tax bid costs as announced on 18 August

2016.

The Chief Executive Officer of Downer, Grant Fenn, said he was very pleased with the first half

result which featured strong performances from all of the businesses and a number of significant

contract wins.

“We continue to reposition our business successfully to service increased investment and

outsourcing in sectors including Roads and Rail, Public Transport, Utilities, Communications and

Defence,” Mr Fenn said.

“Our cash flow result, and our cash conversion of 102.6% of EBITDA, was again outstanding and

our net debt is just $22.2 million with gearing of 1%, or 6.4% including off-balance sheet debt.

“Work-in-hand has increased over 13% during the half to $21.1 billion with major contracts wins in

both Australia and New Zealand including High Capacity Metro Trains in Victoria and Sydney

Growth Trains in New South Wales.

“Overall it has been a very strong operational and financial performance and we are increasing our

guidance for full year NPAT to around $175 million, up from $163 million.”


Downer EDI Limited

ABN 97 003 872 848

Triniti Business Campus

39 Delhi Road

North Ryde NSW 2113

1800 DOWNER

www.downergroup.com

Page 1 of 2


Downer reports its financial results under six service lines and the performance of each service

line, compared with the previous corresponding period, is summarised below:

Transport Services Technology and Communications Services

Total revenue of $911.2 million, up 13.5% Total revenue of $245.9 million, down 1.6%

EBIT of $41.4 million, up 31.0% EBIT of $21.7 million, up 53.9%

Work-in-hand of $5.3 billion Work-in-hand of $1.6 billion


Utilities Services Rail

Total revenue of $442.3 million, up 17.5% Total revenue of $399.7 million, down 4.9%

EBIT of $20.8 million, down 8.8% EBIT of $14.0 million, up 211.1%

Work-in-hand of $3.5 billion Work-in-hand of $7.2 billion


Engineering, Construction and Maintenance Mining

Total revenue of $973.4 million, up 4.9% Total revenue of $635.4 million, down 18.7%

EBIT of $27.1 million, up 31.6% EBIT of $44.4 million, down 34.4%

Work-in-hand of $1.5 billion Work-in-hand of $2.0 billion


Zero Harm

Downer’s Lost Time Injury Frequency Rate of 0.55 remained below one incident per million hours

worked. Total Recordable Injury Frequency Rate reduced from 3.67 to 3.61 per million hours

worked.

Dividend

The Downer Board resolved to pay a fully franked interim dividend of 12.0 cents per share (12.0

cents per share in the prior corresponding period), payable on 16 March 2017 to shareholders on

the register at 16 February 2017. The company’s Dividend Reinvestment Plan (DRP) remains

suspended and will not operate for this dividend.

Outlook

Downer is targeting NPAT of around $175 million for the 2017 financial year.



For further information please contact:

Michael Sharp, Group Head of Corporate Affairs and Investor Relations +61 439 470145

Downer EDI Limited (Downer) is a leading provider of services to customers in markets including: Transport

Services; Technology and Communications Services; Utilities Services; Rail; Engineering, Construction &

Maintenance and Mining. We build strong relationships of trust with our customers, truly understanding and

predicting their needs and bringing them world leading insights and solutions. Downer employs about 19,000

people across more than 200 sites and projects, mostly in Australia and New Zealand, but also in the Asia-

Pacific region, South America and Southern Africa. For more on Downer, visit:

www.downergroup.com

Page 2 of 2




DOWNER HALF YEAR RESULTS

Investor presentation | 2 February 2017

OVERVIEW
Total revenue

1

$3,603.0 million, up 1.7%

Work in hand

2

$21.1 billion,

up from $18.6 billion at 30 June 2016

1 Total revenue is a non-statutory disclosure and includes revenue from joint ventures and other

alliances and other income.

2Work-in-hand numbers are unaudited.

3Adjusted for the mark-to-market of derivatives and deferred finance charges.

4 Gearing = Net debt / net debt + equity. Gearing including off-balance sheet debt based on present

value of plant and equipment operating leases discounted at 10% pa: $122.5m (June 2016: $128.5m).

5Lost Time Injury Frequency Rate - the number of lost time injuries (LTIs) per million hours worked.

6Total Recordable Injury Frequency Rate – the number of LTIs and medically treated injuries per million

hours worked.


Net Profit After Tax (NPAT) $78.2 million,

up 8.5%

Earnings Before Interest and Tax (EBIT) $120.8 million,

up 6.7%

Operating cash flow $243.6 million,

EBITDA conversion 102.6%

Net debt

3

$22.2 million,

down from $87.4 million at 30 June 2016

Interim dividend declared: 12.0 cps,

100% franked no Dividend Reinvestment Plan

LTIFR

5

of 0.55, down from 0.84 at 31 December 2015

TRIFR

6

of 3.61, down from 3.67 at 31 December 2015

Return on Funds Employed (ROFE) 13.0%,

up from 12.5%

Gearing

4

1.0%, (6.4% including off-balance sheet debt)

2

Full year NPAT outlook increased from $163

million to around $175 million

TRANSPORT SERVICES
OPPORTUNITIES

1Total revenue includes joint ventures and other income.

2ROFE = EBIT divided by average funds employed (AFE). AFE = Average Opening and Closing Net Debt + Equity.

Total revenue

1

$m EBIT margin EBIT $m ROFE

2

41.4

31.6

0

10

20

30

40

50

HY17HY16

4.5%

3.9%

0.0%

1.0%

2.0%

3.0%

4.0%

5.0%

6.0%

HY17HY16

21.0%

16.1%

0%

5%

10%

15%

20%

25%

HY17HY16

911.2

802.9

0

200

400

600

800

1,000

HY17HY16

3

Revenue increase of 13% driven by new projects, road maintenance and RPQ acquisition

Continuing strong performance for customers on existing contracts

Contribution from new projects including Newcastle Light Rail, NSW Transport Access Program

Acquisition of RPQ provides further geographical presence and capability mix

Numerous contract wins in Australia and New Zealand

Performance in the previous corresponding period affected by inclement weather

TECHNOLOGY AND COMMUNICATIONS SERVICES
1Total revenue includes joint ventures and other income.

2ROFE = EBIT divided by average funds employed (AFE). AFE = Average Opening and Closing Net Debt + Equity.

Total revenue

1

$m EBIT margin EBIT $m ROFE

2

245.9

249.9

0

50

100

150

200

250

300

HY17HY16

21.7

14.1

0

5

10

15

20

25

30

HY17HY16

8.8%

5.6%

0%

2%

4%

6%

8%

10%

HY17HY16

157.3%

58.9%

0%

50%

100%

150%

200%

HY17HY16

4

Improved earnings performance despite reduced revenue

Strong contribution from nbn

TM

contracts with increased volumes

A number of new contracts awarded including Telstra Wideband


UTILITIES SERVICES

1Total revenue includes joint ventures and other income.

2ROFE = EBIT divided by average funds employed (AFE). AFE = Average Opening and Closing Net Debt + Equity.


Total revenue

1

$m EBIT margin EBIT $m ROFE

2

442.3

376.5

0

100

200

300

400

500

HY17HY16

20.8

22.8

0

5

10

15

20

25

HY17HY16

4.7%

6.1%

0%

1%

2%

3%

4%

5%

6%

7%

HY17HY16

10.8%

13.2%

0%

2%

4%

6%

8%

10%

12%

14%

HY17HY16

5

Revenue increase of 18% driven by new and existing contracts

EBIT reduced by completion of major gas and power projects in the previous corresponding period

Good performance across Power and Gas distribution, stronger performance by Water business

Awarded Clare Solar Farm contract (December 2016); well positioned for the large pipeline of renewable projects

Advisory role with Ausgrid

Positioned well for services to privatised and Government owned power assets

RAIL
1Total revenue includes joint ventures and other income.

2ROFE = EBIT divided by average funds employed (AFE). AFE = Average Opening and Closing Net Debt + Equity.

Total revenue

1

$m EBIT margin EBIT $m ROFE

2

399.7

420.1

0

100

200

300

400

500

HY17HY16

14.0

4.5

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

HY17HY16

3.5%

1.1%

0%

1%

2%

3%

4%

HY17HY16

5.4%

3.6%

0%

1%

2%

3%

4%

5%

6%

HY17HY16





6

Continuing strong performance on maintenance contracts e.g. Waratah TLS and Millennium

Improved performance by joint ventures

Improved depot performance driven by restructuring in the previous corresponding period

Awarded three major contracts: High Capacity Metro Trains in Victoria; Sydney Growth Trains in NSW;

Transport for Newcastle (Keolis Downer)

1Total revenue includes joint ventures and other income.
2ROFE = EBIT divided by average funds employed (AFE). AFE = Average Opening and Closing Net Debt + Equity.

Total revenue

1

$m EBIT margin EBIT $m ROFE

2

27.1

20.6

0

5

10

15

20

25

30

HY17HY16

2.8%

2.2%

0%

1%

2%

3%

4%

5%

HY17HY16

25.1%

21.2%

0%

5%

10%

15%

20%

25%

30%

HY17HY16

973.4

927.8

0

200

400

600

800

1000

1200

HY17HY16

ENGINEERING, CONSTRUCTION & MAINTENANCE

7

Continuing strong performance at Gorgon and Wheatstone

EBIT result benefited from restructuring in FY16

Improved result from consultancies (QCC and MT)

Expansion of Defence footprint through acquisition of AGIS

MINING
1Total revenue includes joint ventures and other income.

2ROFE = EBIT divided by average funds employed (AFE). AFE = Average Opening and Closing Net Debt + Equity.

Total revenue

1

$m EBIT margin EBIT $m ROFE

2

635.4

781.6

0

200

400

600

800

1,000

HY17HY16

44.4

67.7

0

10

20

30

40

50

60

70

80

HY17HY16

7.0%

8.7%

0%

2%

4%

6%

8%

10%

HY17HY16

16.3%

18.6%

0%

5%

10%

15%

20%

HY17HY16

8

Expiry of Christmas Creek contract

Two year extension to Meandu Mine contract (to June 2020)

Four year extension to Karara Mining contract (to March 2022)

Several mining services contract wins (blasting and underground)

FINANCIAL PERFORMANCE
1

Total revenue includes joint ventures and other income.

2ROFE = EBIT divided by average funds employed (AFE); AFE = Average Opening and Closing Net Debt + Equity.

$m HY17 HY16 Change (%)

Total revenue

1

3,603.0 3,543.4 1.7

EBITDA 225.8 241.2 (6.4)

EBIT 120.8 113.2 6.7

Net interest expense (13.7) (15.8) 13.3

Tax expense (28.9) (25.3) (14.2)

Net profit after tax 78.2 72.1 8.5

EBIT margin 3.4% 3.2% 0.2

Effective tax rate 27.0% 26.0% 1.0

ROFE

2

13.0% 12.5% 0.5

Dividend declared

(cents per share)

12.0 12.0 -

Ordinary Dividend payout ratio 69.0% 76.5% (7.5)

10

$m Total

Transport Tech & Comm Utilities Rail EC&M Mining Corp

Statutory EBIT 120.8 41.4 21.7 20.8 14.0 27.1 44.4 (48.6)

New Intercity Fleet bid costs 10.0

10.0

Settlement of contractual

claims

5.0 5.0

Contract closure (6.5) (6.5)


Adjusted EBIT (approx)

129.3

41.4 21.7 20.8 14.0 27.1 37.9 (33.6)

SUMMARY OF EARNINGS

11

UNALLOCATED COSTS (CORPORATE COSTS)
$m HY17 HY16

R&D incentives 4.2 5.0

New Intercity Fleet bid costs (10.0) -

Capital Metro bid costs - (13.0)

Settlement of contractual claims (5.0) -

Corporate costs (37.8) (40.1)

Total unallocated (48.6) (48.1)

12

OPERATING CASH FLOW
1Interest and other costs of finance paid minus int erest received.

$m HY17 HY16

EBIT 120.8 113.2

Add: depreciation & amortisation 105.0 128.0

EBITDA 225.8 241.2

Operating cash flow 243.6 178.1

Add: Net interest paid

1

13.2 11.2

Tax received (25.1) (34.2)

Adjusted operating cash flow 231.7 155.1

EBITDA conversion 102.6% 64.3%

Add back project claims - 65.0

Underlying operating cash flow 231.7 220.1

Normalised EBITDA conversion 102.6% 91.3%

13

CASH FLOW
1As at 31 December 2015, Downer had bought back 1.8 million shares, reducing the total number of shares outst anding to 430.9 million.

2Refer to slide 24 for details.

$m HY17 HY16

Total operating 243.6 178.1

Net capital expenditure (54.4) (100.0)

AGIS and RPQ acquisitions (52.6) -

IT Transformation and Other (16.4) (23.5)

Total investing (123.4) (123.5)

On-market share buy-back

1

- (6.4)

Net (repayment)/ proceeds of borrowings (32.8) 124.1

Dividends paid (55.3) (56.7)

Total financing (88.1) 61.0

Net increase in cash held 32.1 115.6

Cash at 31 December 602.1 489.5

Total liquidity

2

1,087.1 1,017.5

14

DEBT MATURITY PROFILE
15

1. Undrawn $485m. June 2016 undrawn facility was $525m with $40m re-allocated to bonding facilities

0

100

200

300

Jun-17

Dec-17

Jun-18

Dec-18

Jun-19

Dec-19

Jun-20

Dec-20

Jun-21

Dec-21

Jun-22

Dec-22

Jun-23

Dec-23

Jun-24

Dec-24

Jun-25

Dec-25

A$m Equivalent


Weighted average debt duration

(Dec 2016) = 3.96 years (Jun 2016) = 4.25 years

By Limit (at 31 Dec 2016)

USPP

Finance leases

ECA finance

A$MTN

Syndicated bank facility

Bilateral bank facilities

1

1

BALANCE SHEET AND CAPITAL MANAGEMENT
1Adjusted for the mark-to-market of derivatives and deferred finance charges.

2Includes the present value of plant and equipment operating leases discounted at 10% pa: $122.5m (2016: $128.5m).

3Adjusted Net Debt Includes Net Debt plus 6x operating lease expenses in the year. Adjusted EBITDAR equals underlying earnings before int erest, tax, depreciation, amortisation and

operating lease expense (on a rolling 12 month basis).

$m Dec 16 Jun 16

Total assets


4,125.7 4,200.3

Total shareholders’ equity 2,118.4 2,088.5

Net debt

1

22.2 87.4

Gearing: net debt to net debt plus equity 1.0% 4.0%

Gearing (including off balance sheet debt)

2

6.4% 9.4%

Debtor days 20.8 23.6

WIP days 30.5 34.1

Creditor days 31.6 37.2

Interest cover 9.5 x 8.8 x

Net Debt / EBITDA


0.04 0.2

Adjusted Net Debt / adjusted EBITDAR

3

1.5 x 1.6 x

16

11%
25%

12%

18%

27%

7%

Rail

Transport Services

Utilities Services

Mining

EC&M

Technology & Communications Services

18

DOWNER REVENUE BASE

42%

58%

Public

Private

WORK-IN-HAND: $21.1 BILLION
By Contract Type – December 2016

By Service Line – December 2016

19

25%

17%

7%

10%

34%

7%

Transport Services

Utilities Services

EC&M

Mining

Rail

Technology & Communications Services

35%

20%

40%

2%

3%

Schedule of Rates

Recurring

Lump Sum / Fixed Price

Alliance / Target Cost

Cost Plus

WORK-IN-HAND: BOOSTED BY RECENT RAIL WINS
20

$m

0

5,000

10,000

15,000

20,000

25,000

FY14FY15FY16Dec-16

WORK-IN-HAND BY SERVICE LINE
$m

21

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

TransportUtilitiesEC&MMiningRailT&C

Jun-16Dec-16

OUTLOOK

22



Downer is targeting NPAT of around $175 million for the 2017 financial year

.

DEBT AND BONDING FACILITIES
11 Including A$ Medium Term Notes sold to Asian and European domiciled investors measured at financial close of the transaction.

Debt facilities $m

Total facilities 1,109.3

Drawn (624.3)

Available facilities 485.0

Cash 602.1

Total liquidity 1,087.1

Bonding facilities $m

Total facilities 1,629.1

Drawn (805.5)

Available facilities 823.6

Debt facilities by type %

Syndicated bank facility 36

A$MTN 36

USPP


15

Bilateral bank facilities 8

ECA finance 3

Finance leases & other 2

100

Debt facilities by geography %

Australia / NZ 50

North America 23

Asia

1

22

Europe

1

5

100

24

SEGMENT REPORTING
HY17


$m

Transport

Services

Technology and

Communications

Services

Utilities

Services

Rail

EC&M Mining Unallocated Total

Segment revenue

885.5 245.9 442.3 202.0 951.6 612.2 (4.9) 3,334.6

Share of sales from JVs and Associates

1

25.7 - - 197.7 21.8 23.2 - 268.4

Total revenue

1

911.2 245.9 442.3 399.7 973.4 635.4 (4.9) 3,603.0

EBIT

41.4 21.7 20.8 14.0 27.1 44.4 (48.6) 120.8

EBIT margin

4.5% 8.8% 4.7% 3.5% 2.8% 7.0% - 3.4%

HY16


$m

Transport

Services

Technology and

Communications

Services

Utilities

Services

Rail

EC&M Mining Unallocated Total

Segment revenue 771.8 249.9 376.5

211.5

912.1 758.2 (15.4) 3,264.6

Share of sales from JVs and Associates

1

31.1 - -

208.6

15.7 23.4 - 278.8

Total revenue

1

802.9 249.9 376.5

420.1

927.8 781.6 (15.4) 3,543.4

EBIT 31.6 14.1 22.8

4.5

20.6 67.7 (48.1) 113.2

EBIT margin

3.9% 5.6% 6.1% 1.1% 2.2% 8.7% - 3.2%


1 This is a non-statutory disclosure as it relates to/includes Downer’s share of revenue from equity accounted joint ventures and associates.

25

Data sourced from publicly available filings. Our datasets may not be complete. Automated analysis can produce errors. If you believe any data on this page is incorrect, please contact us at hello@nzxplorer.co.nz. For informational purposes only. Not investment advice.

Other issuers discussed similar conditions around this time

Matched by meaning across NZX announcement text, not keywords — based on our semantic index of announcement bodies.