Refining NZ Throughput and Margin Report for May/June 2018

Processing Fee income for the May/June period was NZD -2.8 million due to the impact of the May/ June

maintenance shutdown. Major refits were completed successfully during this one in fifteen year event and

position the refinery to capitalise on refining margins going forward. The refinery has been back in full

operation since 6 July.

Throughput for the May/June period was 3.9 million barrels. The Gross Refinery Margin

3)

(GRM) was USD -

0.71 per barrel for the period. The average exchange rate for the May/June period was USD/NZD 0.69.

The Singapore Dubai complex margin for the May/June period was USD 2.02 per barrel, down from

USD 3.75 per barrel margin for the March/April period.

Appendix I shows further information on throughput, margin and refining income.

Historical Analysis

A five year history of Throughput, Margins and Processing Fees is attached as Appendix II and can also be

found on the company’s website: www.refiningnz.com


Notes:

1. The information provided in this announcement relates to refining operations only. Revenue from pipeline or

other activities is not included.

2. The Processing Fee results reported in this announcement are subject to change due to post announcement

price updates and independent audit.

3. Refining NZ’s Gross Refining Margin is defined as the typical market value of the products produced minus the

typical market value of the feedstock used, expressed per barrel of feedstock used. The margin incorporates

the cost of the hydrocarbon used for fuel and incurred as process losses.


Refining NZ

Port Marsden Highway, Ruakaka, Northland 0171, Private Bag 9024, Whangarei 0148, New Zealand

Telephone: +64 9 432 8311 Fax: +64 9 432 8035 Email: corporate@refiningnz.com www.refiningnz.com

Appendix I – Year to date: 2018

Throughput, Margin and Refining Income


Note: The GRM for a period may be above or below the Cap of USD 9.00 per barrel due to previous year price updates, which

are not subject to the Floor/Cap in the current year

Total

per bbl

Jan/Feb

Throughput

Barrel s (mi l l i on)

7.01

Gros s Refi ni ng Margi n

USD (mi l l i on)

52.8

7.54

Gros s Refi ni ng Margi n (excl udi ng Fl oor/Cap)

USD (mi l l i on)

52.8

7.54

Interi m Cap adjus tment

NZD (mi l l i on)

0.0

Proces s i ng Fee (after Fl oor/Cap)

USD (mi l l i on)

37.0

5.28

Proces s i ng Fee (excl udi ng Fl oor/Cap)

NZD (mi l l i on)

50.8

Proces s i ng Fee (after Fl oor/Cap)

NZD (mi l l i on)

50.8

Mar/Apr

Throughput

Barrel s (mi l l i on)

6.96

Gros s Refi ni ng Margi n

USD (mi l l i on)

47.5

6.82

Gros s Refi ni ng Margi n (excl udi ng Fl oor/Cap)

USD (mi l l i on)

47.5

6.82

Interi m Cap adjus tment

NZD (mi l l i on)

0.0

Proces s i ng Fee (after Fl oor/Cap)

USD (mi l l i on)

33.2

4.77

Proces s i ng Fee (excl udi ng Fl oor/Cap)

NZD (mi l l i on)

45.8

Proces s i ng Fee (after Fl oor/Cap)

NZD (mi l l i on)

45.8

May/Jun

Throughput

Barrel s (mi l l i on)

3.91

Gros s Refi ni ng Margi n

USD (mi l l i on)

-2.8

-0.71

Gros s Refi ni ng Margi n (excl udi ng Fl oor/Cap)

USD (mi l l i on)

-2.8

-0.71

Interi m Cap adjus tment

NZD (mi l l i on)

0.0

Proces s i ng Fee (after Fl oor/Cap)

USD (mi l l i on)

-1.9

-0.49

Proces s i ng Fee (excl udi ng Fl oor/Cap)

NZD (mi l l i on)

-2.8

Proces s i ng Fee (after Fl oor/Cap)

NZD (mi l l i on)

-2.8


Refining NZ

Port Marsden Highway, Ruakaka, Northland 0171, Private Bag 9024, Whangarei 0148, New Zealand

Telephone: +64 9 432 8311 Fax: +64 9 432 8035 Email: corporate@refiningnz.com www.refiningnz.com

Explanatory Note

Throughput

Throughput is the volume of feedstock intake, comprising crude oil, residues, natural gas and blendstock,

measured in barrels. One barrel equates to approximately 159 litres.

Gross Refining Margin

The Gross Refining Margin is calculated in USD as the difference between the value of products and the cost

of feedstock for each refining customer. The value of products use Singapore quoted prices adjusted for

New Zealand quality and the cost of importing those products to New Zealand. Feedstocks are valued using

the notional market values adjusted for the cost of getting the feedstock to the refinery. The Gross Refining

Margin incorporates the cost of hydrocarbon used as fuel and incurred as process losses.

Typically, Refining NZ has an uplift over the Singapore complex margins of around USD 3.00 to 4.00 per

barrel. The value of the uplift varies due to fluctuations in freight rates, product quality premia, crude

market premia and operational performance. Product quality premia are the cost differentials between

products made to New Zealand quality and products made to the quality that applies to quoted prices in

Singapore. Crude market premia are the cost differences between the crude types actually processed at

Refining NZ and Dubai (used as basis for the Singapore complex margins).

Margin Cap/Fee Floor Adjustment

The processing agreements with our customers contain both Floor and Margin Cap clauses, both effective

over a full calendar year.

The Fee Floor is the minimum Processing Fee due, for a calendar year, up to a current maximum of NZD 134

million. If the year-to-date Processing Fee is below the pro-rata Fee Floor, then an interim pro-rata Fee

Floor payment is made by the Customers. Should the Processing Fee exceed the Fee Floor in future months

any pro-rata Fee Floor payments that have been made are repaid to the Customers.

The Margin Cap limits the Gross Refining Margin for each customer to a maximum of USD 9.00 per barrel

over the calendar year. Should the Gross Refining Margin fall below the Cap in future months any pro-rata

Cap reductions that have been made are repaid by the Customers.

The Cap and the Floor are subject to year-to-date adjustments.

Any balance remaining at the end of the year cannot be carried over to the next year.

Gross Refining Margin after Cap/Floor

The Gross Refining Margin adjusted for any impacts of the Cap or Floor.

Processing Fee

The Processing Fee is 70% of the Gross Refining Margin after any adjustment for the Cap or Floor. The

Processing Fee is paid by our customers in NZD.


Refining NZ

Port Marsden Highway, Ruakaka, Northland 0171, Private Bag 9024, Whangarei 0148, New Zealand

Telephone: +64 9 432 8311 Fax: +64 9 432 8035 Email: corporate@refiningnz.com www.refiningnz.com

Appendix II - Historical Analysis

Intake/Production, Gross Refining Margin and Processing Fee


20142015201620172018

Ja n/Fe bBa rre l s 000's6,7407,0566,8267,1607,011

RNZ USD GRM pe r ba rre l

1)

3.869.917.966.587.54

Si nga pore Duba i Compl e x GRM0.705.404.953.423.37

Upl i ft vs . Si nga pore Duba i Compl e x

3)

3.164.513.013.164.17

NZD Proce s s i ng Fe e (mi l l i on)

2) 4)

22.059.657.045.950.8

Ma r/AprBa rre l s 000's6,1467,4117,4715,1406,958

RNZ USD GRM pe r ba rre l

1)

-2.848.771.849.356.82

Si nga pore Duba i Compl e x GRM1.364.823.183.023.75

Upl i ft vs . Si nga pore Duba i Compl e x

3)

-4.203.95-1.346.333.07

NZD Proce s s i ng Fe e (mi l l i on)

2)

20.762.314.848.145.8

Ma y/JunBa rre l s 000's6,9766,4166,8377,7553,910

RNZ USD GRM pe r ba rre l

1)

3.488.556.267.63-0.71

Si nga pore Duba i Compl e x GRM0.104.242.132.902.02

Upl i ft vs . Si nga pore Duba i Compl e x

3)

3.384.314.134.73-2.73

NZD Proce s s i ng Fe e (mi l l i on)

2)

21.148.943.358.4-2.8

Jul /AugBa rre l s 000's6,2987,5196,8337,511

RNZ USD GRM pe r ba rre l

1)

6.757.666.208.87

Si nga pore Duba i Compl e x GRM-0.552.521.864.70

Upl i ft vs . Si nga pore Duba i Compl e x

3)

7.305.144.344.17

NZD Proce s s i ng Fe e (mi l l i on)

2)

21.363.541.363.6

Se pt/OctBa rre l s 000's6,3887,2217,2516,816

RNZ USD GRM pe r ba rre l

1)

7.549.477.499.31

Si nga pore Duba i Compl e x GRM2.545.123.184.73

Upl i ft vs . Si nga pore Duba i Compl e x

3)

5.004.354.314.58

NZD Proce s s i ng Fe e (mi l l i on)

2)

21.071.852.562.2

Nov/De cBa rre l s 000's7,1277,0177,4477,342

RNZ USD GRM pe r ba rre l

1)

9.9810.829.206.83

Si nga pore Duba i Compl e x GRM4.486.374.193.67

Upl i ft vs . Si nga pore Duba i Compl e x

3)

5.504.455.013.16

NZD Proce s s i ng Fe e (mi l l i on)

2)

62.473.067.650.7

TotalBarrels 000's39,67642,63942,66541,72417,879

USD GRM per barrel

1)

4.969.206.478.025.46

NZD Processing Fee (million)

2)

168.4379.2276.6328.993.9

YTD Cap adjustment14.4

NZD Processing Fee (million)

1)

1) Excl ude s Fe e Fl oor/Ca p a djus tme nt

2) I ncl ude s Fe e Fl oor/Ca p a djus tme nt

3) RNZ upl i ft vs . Si nga pore Duba i Compl e x GRM i s i n USD pe r ba rre l

4) Ja n/Fe b 2017 e xcl ude s a pri or pe ri od a djus tme nt of ($1.5m)

Data sourced from publicly available filings. Our datasets may not be complete. Automated analysis can produce errors. If you believe any data on this page is incorrect, please contact us at hello@nzxplorer.co.nz. For informational purposes only. Not investment advice.

Other issuers discussed similar conditions around this time

Matched by meaning across NZX announcement text, not keywords — based on our semantic index of announcement bodies.

  • FSF — Fonterra Shareholders' Fund: Fonterra Annual Results 2018
    2018-09-12

    FONTERRA ANNUAL REPORT  55 FOR THE YEAR ENDED NZD MILLION31 JULY 201831 JULY 2017CHANGE Production Volume (’000 MT) Reference products1,849, Non-reference products762 Sales Volume (’000 MT) 2 Reference products1,794, Non-reference products620 Re…”

  • FCG — Fonterra Co-operative Group Limited: Fonterra Annual Results 2018
    2018-09-12

    FONTERRA ANNUAL REPORT  55 FOR THE YEAR ENDED NZD MILLION31 JULY 201831 JULY 2017CHANGE Production Volume (’000 MT) Reference products1,849, Non-reference products762 Sales Volume (’000 MT) 2 Reference products1,794, Non-reference products620 Re…”