New Talisman Gold Mines Ltd logo

Chairmans Address to AGM

AGM11 September 2018NTLIndustrials

ANNOUNCEMENT BY NEW TALISMAN GOLD MINES LIMITED (NTL)
CHAIRMAN’S ADDRESS

ANNUAL MEETING 12 SEPTEMBER 2018

Introduction. The Directors’ report for the year to 31 March 201 was circulated with the Annual Report.

Before I ask you to formally receive the Annual Report together with the Financial Statements and the

report of the Auditors I would like to highlight several areas of recent progress.

Shareholder Support. I want to start by thanking our shareholders for their support as we develop our

talisman mine to enable re-commencement after many years of gold extraction activities.

In reflecting upon the year since we last gathered, the Directors and Management team are pleased but

not satisfied with our progress with a number of our goals achieved but a number delayed by the natural

vagaries afflicting projects of this nature and to some extent the regulatory environment in which find

ourselves operating..

The macro economic conditions have been benign to slightly favorable, with the gold price over the last

12 months with prices ranging from US$1,195 per oz to US$1,352 per oz with a current price of US$1,198

per oz. which when looking at such from a current NZD Exchange rate basis is $1828 to $2068.

Industry and Regulatory Environment

I should also note that the Mining and Petroleum industries in NZ continue to face a somewhat higher

level of uncertainty then would be ideal and in this regard we note the industry has in the current year

seen a reduced level of activity in comparison with prior years.

Talisman

Background. As you will be aware our main asset is the fabled Talisman mine which has over its life

produced an estimated 3m plus oz of bullion.

We have a 25 year mining permit and we have land access arrangements in place which we have recently

renewed.


PHYSICAL AND MINE SITE

In terms of the mine key infrastructure is largely established and in particular I note the arrival and

installation of the vent fan which will allow an increased range of underground activity. The JORC 2012

compliant resource estimate announced last year doubled both grades and resources demonstrating and

reinforcing the world class attributes of the ore body at the Talisman mine. This estimate was reviewed

independently both as part of the the valuation completed under the Valmin code and as a separate

independent review completed in the last 2 weeks. This review confirmed the methodologies used by the

Company met the JORC reporting standards and validated the robustness of the Mineral Resource

estimate.

Your company’s technical team have recently completed an updated pre-feasibility study on the
measured and indicated portion of the resource. This study further reinforces the robust economics and

low environmental impact of the project.

Highlights from PFS include

 The estimated Value of Talisman project more than doubles based on updated Pre-feasibility

Study, increasing value from $15m to $36m utilizing an NPV9 %

 Estimated Recovered gold increases by 50% to 51,000 Gold Equivalent Ounces

 Estimated Direct operating costs to produce an ounce reduced to NZ$710 per ounce

($490USD/oz)

 Estimated Ore Reserves increase by more than 40% from 30,500 to 44,100 Gold Equivalent

Ounces

The proposed mining production plan will be adjusted as we gain knowledge through the Bulk Sampling

programme and will form a large part of the Bankable feasibility study which is currently underway.

Separate to the Talisman mine PFS a scoping study was completed on the Talisman Deeps Project which

is predominantly comprised of inferred resources. The Scoping study meets JORC 2012 standards however

further information and data which will be informed by both the bulk sampling and the longer term mine

plan will provide the level of detail required to allow this project to be reach a Pre Feasibility Study.

The work to date has established that we have one of the highest-grade gold mines in New Zealand (and

of international significance) in a world class region which continues to provide a majority of New

Zealand’s gold discoveries.


Financial

Current Activities.

All infrastructure necessary to commence mining is complete.

The Pilot plant is on the water and is expected to arrive later this month.

I am delighted to advise that 5 Tonnes of ‘Mystery vein’ was excavated this week allowing a number of

5kg samples to be sent for testing which will be released in the coming days. The results of these samples

will reveal new data on this relatively new and much speculated about Vein.

Mine Safety, Community and Environment.

I want to emphasize to all that we are committed to responsible, and sustainable mining and the Health

and safety of our workers remains a key focus with governance oversight provided by independent

experts appointed to the health and safety committee.

We are engaging with local community on a regular basis and exploring ways in which we can further

support the communities in which we operate.

So what opportunities lie ahead?

 Reopening of the Talisman mine which begins with the commencement of mining activities

under the resource consent and subsequent production of extracted ore.

 Accelerated extraction volumes at Mystery

 Commencement of extraction at Dubbo which hosts the extremely high-grade resources;

 Installation of pilot plant and commencement of production of gold
 Completion of mine plan covering the next 5 – 7 years


Conclusion:

Thank you to our management team, staff and contractors who have helped make it a productive year. I

note and commend their efforts in at times difficult circumstances.

I also note and thank the community for their support and encouragement to continue to have “a go” at

bringing activity and jobs back to the region.

Most importantly I thank you our shareholders whose continued support is the foundation upon which

this company is built.

We have a very special Thank you to make this year with the retirement of our longest serving Director

Mr Murray McKee at the end of March this year. Murray has been an important contributor to the

company’s progress over 22, at times difficult, years. In particular during the period of his

Chairmanship of the company where his exemplary leadership and his close working partnership with

our CEO saw the company through a very difficult time for the industry and the company.

Personally , I am grateful for his skill and counsel over the last twelve months or so and would like to

wish Murray the very best for the future ”

I’d like to present Murray with a momento of the Talisman mine. This is a sample of rock from the

BM37 Zone in the Dubbo Shoot which holds high grade ore running between 900g/t to an extraordinary

13,800g/t! The sample is mounted on a piece of timber sourced from the original workings inside the

Talisman Gold mine.

Thank You.

---

ANNOUNCEMENT BY NEW TALISMAN GOLD MINES LIMITED (NTL)
CHAIRMAN’S ADDRESS

ANNUAL MEETING 12 SEPTEMBER 2018

Introduction. The Directors’ report for the year to 31 March 201 was circulated with the Annual Report.

Before I ask you to formally receive the Annual Report together with the Financial Statements and the

report of the Auditors I would like to highlight several areas of recent progress.

Shareholder Support. I want to start by thanking our shareholders for their support as we develop our

talisman mine to enable re-commencement after many years of gold extraction activities.

In reflecting upon the year since we last gathered, the Directors and Management team are pleased but

not satisfied with our progress with a number of our goals achieved but a number delayed by the natural

vagaries afflicting projects of this nature and to some extent the regulatory environment in which find

ourselves operating..

The macro economic conditions have been benign to slightly favorable, with the gold price over the last

12 months with prices ranging from US$1,195 per oz to US$1,352 per oz with a current price of US$1,198

per oz. which when looking at such from a current NZD Exchange rate basis is $1828 to $2068.

Industry and Regulatory Environment

I should also note that the Mining and Petroleum industries in NZ continue to face a somewhat higher

level of uncertainty then would be ideal and in this regard we note the industry has in the current year

seen a reduced level of activity in comparison with prior years.

Talisman

Background. As you will be aware our main asset is the fabled Talisman mine which has over its life

produced an estimated 3m plus oz of bullion.

We have a 25 year mining permit and we have land access arrangements in place which we have recently

renewed.


PHYSICAL AND MINE SITE

In terms of the mine key infrastructure is largely established and in particular I note the arrival and

installation of the vent fan which will allow an increased range of underground activity. The JORC 2012

compliant resource estimate announced last year doubled both grades and resources demonstrating and

reinforcing the world class attributes of the ore body at the Talisman mine. This estimate was reviewed

independently both as part of the the valuation completed under the Valmin code and as a separate

independent review completed in the last 2 weeks. This review confirmed the methodologies used by the

Company met the JORC reporting standards and validated the robustness of the Mineral Resource

estimate.

Your company’s technical team have recently completed an updated pre-feasibility study on the
measured and indicated portion of the resource. This study further reinforces the robust economics and

low environmental impact of the project.

Highlights from PFS include

 The estimated Value of Talisman project more than doubles based on updated Pre-feasibility

Study, increasing value from $15m to $36m utilizing an NPV9 %

 Estimated Recovered gold increases by 50% to 51,000 Gold Equivalent Ounces

 Estimated Direct operating costs to produce an ounce reduced to NZ$710 per ounce

($490USD/oz)

 Estimated Ore Reserves increase by more than 40% from 30,500 to 44,100 Gold Equivalent

Ounces

The proposed mining production plan will be adjusted as we gain knowledge through the Bulk Sampling

programme and will form a large part of the Bankable feasibility study which is currently underway.

Separate to the Talisman mine PFS a scoping study was completed on the Talisman Deeps Project which

is predominantly comprised of inferred resources. The Scoping study meets JORC 2012 standards however

further information and data which will be informed by both the bulk sampling and the longer term mine

plan will provide the level of detail required to allow this project to be reach a Pre Feasibility Study.

The work to date has established that we have one of the highest-grade gold mines in New Zealand (and

of international significance) in a world class region which continues to provide a majority of New

Zealand’s gold discoveries.


Financial

Current Activities.

All infrastructure necessary to commence mining is complete.

The Pilot plant is on the water and is expected to arrive later this month.

I am delighted to advise that 5 Tonnes of ‘Mystery vein’ was excavated this week allowing a number of

5kg samples to be sent for testing which will be released in the coming days. The results of these samples

will reveal new data on this relatively new and much speculated about Vein.

Mine Safety, Community and Environment.

I want to emphasize to all that we are committed to responsible, and sustainable mining and the Health

and safety of our workers remains a key focus with governance oversight provided by independent

experts appointed to the health and safety committee.

We are engaging with local community on a regular basis and exploring ways in which we can further

support the communities in which we operate.

So what opportunities lie ahead?

 Reopening of the Talisman mine which begins with the commencement of mining activities

under the resource consent and subsequent production of extracted ore.

 Accelerated extraction volumes at Mystery

 Commencement of extraction at Dubbo which hosts the extremely high-grade resources;

 Installation of pilot plant and commencement of production of gold
 Completion of mine plan covering the next 5 – 7 years


Conclusion:

Thank you to our management team, staff and contractors who have helped make it a productive year. I

note and commend their efforts in at times difficult circumstances.

I also note and thank the community for their support and encouragement to continue to have “a go” at

bringing activity and jobs back to the region.

Most importantly I thank you our shareholders whose continued support is the foundation upon which

this company is built.

We have a very special Thank you to make this year with the retirement of our longest serving Director

Mr Murray McKee at the end of March this year. Murray has been an important contributor to the

company’s progress over 22, at times difficult, years. In particular during the period of his

Chairmanship of the company where his exemplary leadership and his close working partnership with

our CEO saw the company through a very difficult time for the industry and the company.

Personally , I am grateful for his skill and counsel over the last twelve months or so and would like to

wish Murray the very best for the future ”

I’d like to present Murray with a momento of the Talisman mine. This is a sample of rock from the

BM37 Zone in the Dubbo Shoot which holds high grade ore running between 900g/t to an extraordinary

13,800g/t! The sample is mounted on a piece of timber sourced from the original workings inside the

Talisman Gold mine.

Thank You.

Data sourced from publicly available filings. Our datasets may not be complete. Automated analysis can produce errors. If you believe any data on this page is incorrect, please contact us at hello@nzxplorer.co.nz. For informational purposes only. Not investment advice.