Dredging of Fragmented Rock in Channel Successful
7 October 2022
NZX Announcement / Media Release
SOUTH PORT NEW ZEALAND LIMITED (NZX SPN)
Dredging of Fragmented Rock in Channel Successful
On 8 August South Port notified the market that we had contracted Heron Construction
Company Ltd operating under an existing coastal permit, to remove fractured or fragmented
rock that remained in the Port harbour entrance channel from previous dredging campaigns.
This project commenced on 21 August and was expected to be completed towards the end of
September 2022. As noted at the time there were several variables associated with a project
such as this, foremost of which was the uncertainty of the extent of the fragmented rock and
therefore the timeline was subject to change. It was also noted that the proposed six-week
clearance work did not include any blasting activity.
The Company is very pleased to announce that this dredging campaign has been very
successful and with the support from Heron Construction this work will continue into early
October.
The Company now expects that this dredging campaign will achieve 9.7m chart datum (CD)
in the harbour entrance channel.
This is a significant milestone as this is the depth that was targeted for project Kia Whakaū,
the subject of the resource consent that was granted on 31 August 2022 (notified to NZX on
1 September 2022).
Kia Whakaū is a project to dredge and remove seabed materials to 9.7m CD in the harbour
entrance channel, which included the use of drilling and blasting as required, 10.7m CD in the
Island Harbour berth basins, and 9.45m CD in the swinging basin.
Owing to, the success of this project the drilling and blasting activity that was required for
project Kia Whakaū is unlikely to be required under the consent granted on 31 August 2022.
This is a very exciting development for the Port and will have the potential to significantly
reduce the cost of project Kia Whakaū going forward.
The Company will now contract a suction dredge to deepen the swinging basin and berth
pockets under the new resource consent, which is expected to be completed in July 2023 to
allow for larger cargo volumes and or vessels to transit through the Port.
ENDS.
For further information please contact:
Media:
Mr Nigel Gear Mrs Charlotte Scoles
Chief Executive Communications Advisor
South Port New Zealand Ltd South Port New Zealand Ltd
Ph: (03) 212 8159 Mobile: 021 775 298
Email: ngear@southport.co.nz Email: cscoles@southport.co.nz