Q1 2024 Operational Update

Quarterly Update18 April 2024CHIEnergy

channelnz.com

NZX RELEASE

19 April 2024


Q1 2024 Operational Update

Channel Infrastructure NZ Limited (NZX:CHI) (Channel or Channel Infrastructure) has today released its

operational update for the three months ended 31 March 2024.


OPERATIONAL HIGHLIGHTS


Terminal and pipeline throughput

• Terminal and pipeline throughputs for the quarter ended 31 March 2024 continued to track above

the Envisory fuel demand outlook at c.921 million litres in Q1 2024, up 21 million litres on the

previous quarter and c.13% higher than Q1 2023 (811 million litres).

• 17 import shipments were received and discharged during the quarter (Q1 2023: 18).

• The increased throughput continues to be driven by a strong aviation demand recovery, with jet fuel

throughput up c.38% on the previous corresponding period (Q1 2024: 387 million litres; Q1 2023: 280

million litres).

• Jet fuel demand has shown typical seasonal behaviour (Summer peak demand) but demand has

been stronger than expected with a greater number of flights for the anticipated growth in passenger

numbers, reflected in the lower reported airline load factors. Actual jet fuel throughput for Q1 was

13% above the Envisory forecast compared with 14% for Q4 2023 and 5% for FY23. Management’s

view is that the seasonal peak is now concluded, in line with pre-Covid trends.




• A summary of Quarterly Terminal and Pipeline Throughputs by fuel type since commencement of

import terminal operations on 1 April 2022 is included as Appendix I.



387

280

280

282

254

249

-

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

Q1 24Envisory Q1 24Envisory FY24

Outlook

Q1 23Envisory FY23

Outlook

Pipeline and Truck Loading Facility volumes

Million Litres

JetDieselPetrol


channelnz.com

Conversion and private storage update

• Decommissioning and workforce transition is now complete with the remaining conversion work

largely associated with firefighting and bunding upgrades.

• Conversion costs remain within the $220 million budget with c.$169 million spent to 31 March 2024

(31 December 2023: $163 million).

• Private storage growth capex of c$43.5 million spent to 31 March 2024, within budget of $50 million

(31 December 2023: $41 million).

• Net borrowings increased to $333 million as at 31 March 2024 (31 December 2023: $315 million).


- ENDS -

Authorised by:

Chris Bougen

General Counsel and Company Secretary

Investor Relations contact:

Anna Bonney

investorrelations@channelnz.com


Media contact:

Laura Malcolm

communications@channelnz.com



About Channel Infrastructure NZ

Channel Infrastructure’s vision is to be a world-class infrastructure company, delivering resilient

infrastructure solutions to help meet changing fuel and energy needs.

Channel Infrastructure’s assets are a critical part of the Northland and Auckland fuel supply chain, supplying

around 40% of New Zealand’s transport fuel demand and all of the jet fuel to Auckland International Airport.

Utilising the deep-water harbour and jetty infrastructure at Marsden Point, as well as 280 million litres of

storage tanks, and the 170-kilometre pipeline from Marsden Point to Auckland, we receive, store, test and

distribute fuel owned by our customers. Channel Infrastructure’s wholly-owned subsidiary, Independent

Petroleum Laboratory Limited, provides fuel quality testing services at Marsden Point and around New

Zealand.

Channel Infrastructure will seek to support New Zealand’s decarbonisation ambitions, by utilising our

strategically-located assets and our expertise in supply chain infrastructure. The Company remains focused

on its future growth opportunities at the Marsden Point site and beyond, including additional fuel storage to

support fuel security and studies underway with partners on hydrogen and sustainable aviation fuel

opportunities.

For more information on Channel Infrastructure, please visit: www.channelnz.com


channelnz.com

Appendix I – Terminal and Pipeline Throughputs (since 1 April 2022)



Terminal and Pipeline

Throughputs by quarter

(million litres)


2022


2023



2024

Quarter 1



Jet


280 387

Diesel


282 280

Petrol


249 254

Total


811 921



Quarter 2



Jet


146 299

Diesel


275 274

Petrol


257 249

Total


679 821



Quarter 3



Jet


200 314

Diesel


264 261

Petrol


258 263

Total


721 838



Quarter 4



Jet


244 365

Diesel


275 283

Petrol


280 251

Total


799 900