NTL Market Update

Capital Raise27 August 2024NTLIndustrials

Page | 1

__________________________________________________________________________

28 August 2024

ANNOUNCEMENT BY NEW TALISMAN GOLD MINES LIMITED

(NZX: NTL, ASX: NTL)

FOR IMMEDIATE RELEASE


NTL MARKET UPDATE



New Talisman closed its Shortfall offer last Friday 23rd resulting in a further NZ$438k in

addition to the previously announced 1.805 million NZD to bring a total raised via the Rights

Issue of NZ$2.24m. The shares for the shortfall will be allotted on August 28

th

.

The Board thanks both existing shareholders and new investors for their support.

Not included in this amount, and as also announced previously

, NTL Directors Richard Tacon

and Samantha Shariff have applied for a further 170k shortfall subject to shareholder approval

as per ASX listing rule 10.11, at the ASM in September.

1.

These funds are held in trust in the

meantime.

The successful Capital Raising has enabled NTL to confirm the purchase of the processing

plant

2.

. Preparations are now underway to relocate the plant to the port for containerisation

and shipping. NTL will update the market on delivery timeframes once the ship sailing is

confirmed, but a 10-12 week period is envisaged, not allowing for customs clearance in New

Zealand.

On May 31st NTL announced that it had entered into a Heads of Agreement with Terra Firma

Mining Ltd

3.

, the agreement includes the providing of premises for and to operate a processing

plant. The HOA contained four conditions to be met ahead of a lease for the premises being

signed. Three of the conditions fall to NTL to complete. Two of these three have now been

met, with the third in process. They being:

• A successful capital raising

• A long-Term Access Arrangement with DoC in place

• Purchase of a processing plant (in process). The costs for plant’s purchase and

shipping were laid out in the Rights Offer document Released to the Market on 9

th

July

2024

4.

and remain on budget. The 100 tonne per day design capacity of the plant will

meet NTL’s near term production requirements based on the scale and constraints of

the historic nature of the Talisman mine with its narrow tunnels and confined access

road, and upon the advice of NTL’s mining contractor Terra Firma.

• The fourth condition is for Terra Firma to provide an identified site ready for plant

installation, which is well underway. The Waikato location of the premises and the

broad terms of the lease have been agreed. NTL can confirm the intended lease

agreement will cover the 2 year Bulk Sampling period with Rights of Renewal and has

2b Gibraltar Cres,

Parnell, Auckland 1052

Office +64 9 303 1893

info@newtalisman.co.nz

Page | 2

a monthly lease of NZ$7k. Terra Firma does not envisage any delay in having the site

ready ahead of the plant’s arrival.

NTL announced on 25th June 2024 that it had secured the renewal of the Long Term Access

Arrangements

5.

(AA) with the Department of Conservation. The material terms of this AA are

a 5 year period, a bond of NZ$100k, insurance requirements of $10m cover and the

submission of a five year work plan.

The Talisman mine is in a state of readiness for commencement of the Consented Bulk

Sampling project with the Workplan focussing on the Mystery vein.

6.

The knowledge gained

will inform future decision making for production targets in the vein system.

The Workplan is centred on commencing production through Bulk Sampling of ore produced

in the advancement of the Mystery Vein drive which has random chip sampled at promising

levels of a weighted average 39.35g/t Au and 34.75g/t Ag, as previously announced on 8 May

2018

6.

Advancing the Mystery drive to 200 metres over a 3-4 month period, producing approx 1600

tonnes of ore, will inform the next decision point relating to further target areas in the mine.

This could be, for example, opening a second drive on a higher level, interconnecting

periodically via stoping areas of high grade, and advancing both drives North to the surface if

the vein proves contiguous. This decision will be informed by the grades logged and the

ongoing nature of the vein.

Opening a second drive will also most likely require investment in a means of conveyance

within the mine to enable larger volumes to be transported to surface in an efficient manner.

Knowledge of the Mystery vein structure and mineralisation will be logged at regular intervals,

giving the opportunity to add to the mine’s existing Mineral Resource Estimate (MRE).

7.


This dual drive strategy would also enable an additional egress within the Mystery area while

under development, and for the whole mine if the egress is continued to the surface –

improving both the operating and safety environment. This would also generate revenue by

mining on vein - potentially adding to the MRE and mine life, and value as a consequence.

The following table summarises the expected timeframes for the different components of the

project. NTL will update the market if these timeframes change due to external or unexpected

factors.

Activity Quarter Ended

30 Sept 2024

Quarter Ended

31 Dec 2024

Quarter Ended

31 Mar 2025

Plant Packing, Shipping

and installation


$200k


Arrival of Plant


Commissioning of

Processing Plant


$75-$100k


Commencement of Bulk

Sampling production and

stockpiling and interim

2

nd

egress


$250k


$575k


Decision point for second

higher level Mystery

Drive and means of

conveyance



Page | 3

Road signage for the access road as required in the agreed Traffic Management Plan is being

designed and installed. With the funds now in place from the Capital Raising the NTL Board

will decide on a suitable runway period and expenditure for stockpiling of ore while awaiting

the installation of the processing plant. In essence, NTL will “time its run” to ensure responsible

cash management.

NTL will continue to update the market as the project progresses in the coming months in what

is a hugely exciting period for the company.


Yours sincerely,




John Upperton

General Manager

New Talisman Gold Mines Limited







1. Refer to ASX & NZX announcement dated 2

nd

August 2024 “NTL Allots shares from Rights Offer”

2. Refer to ASX & NZX announcement dated 19

th

August 2024 “Processing Plant Update”

3. Refer to ASX & NZX announcement dated 31

st

May 2024 “NTL signs HOA with Terra Firma Mining Ltd for Ore Processing”

4. Refer to ASX & NZX announcement dated 9

th

July 2024 “NTL Rights Offer”

5. Refer to ASX & NZX announcement dated 25

th

June 2024 “NTL Secures Renewed Long Term Access Arrangements”

6. Refer to ASX & NZX announcement dated 8

th

May 2018 ”Quarterly Activities Report”

7. Refer to ASX & NZX announcement dated 24

th

June 2020 “2019 Mineral Resource Estimate Update”

Data sourced from publicly available filings. Our datasets may not be complete. Automated analysis can produce errors. If you believe any data on this page is incorrect, please contact us at hello@nzxplorer.co.nz. For informational purposes only. Not investment advice.