Taiko Critical Minerals Limited logo

Appointment of Fast-Track Expert Panel

Regulatory10 August 2026TCMMaterials

NZX and Media Release
11 August 2026





FAST-TRACK

APPOINTMENT OF EXPERT PANEL AND TIMING OF DECISION



Taiko Critical Minerals Limited (NZCN: 5824110)

c/o PriceWaterhouseCoopers, Level 26 PwC Tower, 15 Customs Street West,

Auckland Central, Auckland 1010, New Zealand

www.taikocm.co.nz

Tāiko Critical Minerals Limited (“Tāiko”, “TCM” or “the Company”) (NZX:TCM) advises that On 10

August 2026, the Fast-Track Panel Convener issued a minute announcing the appointment of the

following people to the expert panel:

 John Maassen (chair) – joint nominee from WCRC, GDC and Te Rūnunga o Ngāti Waewae;

 Sharon Dines; and

 Cameron Lines.

The Expert Panel will commence work on 17 August 2026 and is due to make a decision on the

Company’s Fast Track application by 8 December 2026, subject to any delays.

The minute can be viewed at:

https://www.fasttrack.govt.nz/__data/assets/pdf_file/0024/32379/FTAA-2605-1238-Convener-

Minute-re-Panel-appointment.pdf




ENDS

For further information please contact:

Robert Brand

Chief Executive Officer

Mobile: +61 421 388 222

Email: robert.brand@taikocm.co.nz

Website: www.taikocm.co.nz




Page 2 of 3

ABOUT TĀIKO CRITICAL MINERALS

Tāiko is a New Zealand incorporated company preparing to extract, refine and export critical minerals

from privately owned farmland on the West Coast of the South Island of New Zealand, near

Greymouth. The Company has strong mana whenua support, with resource consents through to

implementation.

Tāiko plans to develop and produce ilmenite, zircon, garnet, and other critical minerals. The company’s

“mine to market” strategy involves refining these critical minerals at a planned Mineral Separation

Plant on the West Coast and exporting them to global customers. The Company’s operations are in

start-up phase and are therefore pre-revenue.

BARRYTOWN CRITICAL MINERALS PROJECT

The Company’s core asset is the Barrytown Critical Minerals Project, contained on Mining Permit ML

60785 covering 1250ha of coastal heavy mineral sands located ~30 km north of Greymouth.

Tāiko has been granted resource consents to mine the mineral resource from the Coates South Block

property near Greymouth.

The Company has entered into a conditional Sale and Purchase Agreement with Barrytown Farms

Limited to acquire approximately 304 hectares of farmland on the Barrytown Flats, securing access

rights for the core mining blocks of the project.

The Company has also been granted resource consents to construct and operate a mineral separation

plant at nearby Rapahoe, which will produce high value critical minerals from the mineral resource.

In addition, Tāiko will transport refined minerals via established rail infrastructure to South Island

ports for export to global customers.

MINERAL RESOURCE

Tāiko has reported a JORC Code (2012) compliant Mineral Resource for the Barrytown Critical Minerals

Project comprising Total Measured, Indicated and Inferred Resources of 25.3 Mt @ 24.1% VHM and

33.2% THM.

The Company has also reported an initial JORC Code (2012) Mineral Resource Estimate (MRE) for the

Canoe Creek Block, with Measured & Indicated Resources of 2.85 Mt @ 20% Valuable Heavy Mineral

(VHM).

PROJECT DEVELOPMENT

The Company lodged its substantive application for resource consent under the Fast Track Approvals

Act 2024 on 8 June 2026. The application covers mining of the mineral resource extension of the

Coates South Block contained in the Canoe Creek, Barrytown Farms and Cargill South Blocks.

Tāiko has received strong support from Mana Whenua Te Rūnanga o Ngāti Waewae, whose vital input

is helping to shape the project from resource consents through to implementation.



Page 3 of 3

COMPETENT PERSONS STATEMENT

The Mineral Resource information in this announcement is based on information compiled under the

supervision of Mathijs van de Ven (MAusIMM) and Michael Gazley (MAusIMM, MAIG) of RSC, who are

Competent Persons as defined in the JORC Code (2012). Both have sufficient experience relevant to

this style of mineralisation and consent to the inclusion of this information in the form and context in

which it appears.

MINERAL RESOURCE ESTIMATES

All references to mineral resource estimates should be read in conjunction with the reports listed in

the table below.

Location Title of Document Competent person Report & (NZX

release) date

Barrytown

Farms and

Coates South

Initial Mineral Resource Estimate

for the Barrytown Critical Minerals

Project

Mr Rene Sterk MSc FAusIMM

(CP(Geo) MAIG (RPGeo) MSEG

20 Jan 2026

(pre NZX listing)

Barrytown

Farms and

Coates South

Listing Profile – Taiko Critical

Minerals Limited

Mr Rene Sterk MSc FAusIMM

(CP(Geo) MAIG (RPGeo) MSEG

5 Mar 2026

(NZX: 5 Mar 26)

Canoe Creek

Canoe Creek Mineral Resource

Estimate

Mathijs van de Ven (MAusIMM)

Michael Gazley (MAusIMM,

MAIG)

4 May 2026

(NZX: 13 May 26)

Canoe Creek Initial Mineral Resource Estimate

for the Canoe Creek Block at the

Barrytown Critical Minerals Project

Mathijs van de Ven (MAusIMM) 6 May 2026

(NZX: 13 May 26)

The above reports were prepared by RSC and can be found at www.taikocm.co.nz/mineral-resource-

information.

All disclosures made in this document with reference to mineral resources estimates are quoted as

per those documents. Taiko confirms that it is not aware of any new information or data that will or

may materially affect the information included in this market announcement. In the case of mineral

resource estimates, all material assumptions and technical parameters underpinning the estimates

continue to apply and have not materially changed since the date of the above reports.

FORWARD LOOKING STATEMENTS

This announcement may contain forward-looking statements based on management’s expectations.

Actual results may differ materially from those expressed or implied in such statements.

Forward-looking statements, opinions, and estimates included in this document are based on

assumptions and contingencies which are subject to change without notice. These statements are

provided as a general guide only and should not be relied upon as a guarantee of future performance.

Project development pathways, timelines, production targets, and commercial outcomes are

indicative only and are based on current expectations. Actual timing and outcomes may vary

depending on technical, regulatory, funding, and market conditions. Tāiko does not undertake to

update forward-looking statements except as required by applicable law.

PUBLIC DISCLOSURES

This announcement should be read in conjunction with Taiko’s NZX announcements. It is not intended

to provide a comprehensive overview of all material information relating to the Company and should

not be relied upon as a substitute for those disclosures.

Data sourced from publicly available filings. Our datasets may not be complete. Automated analysis can produce errors. If you believe any data on this page is incorrect, please contact us at hello@nzxplorer.co.nz. For informational purposes only. Not investment advice.