What did Infratil Limited announce?

Infratil Limited (NZX: IFT) filed “Infratil Independent Valuation Update – 30 June 2026” with NZX on 24 August 2026, as a market update announcement.

When was it filed?
24 August 2026
Where is the original?
NZX announcement
Infratil Limited/Announcement
Infratil Limited logo

Infratil Independent Valuation Update – 30 June 2026

Market Update24 August 2026IFTUtilities

Infratil Limited 5 Market Lane, PO Box 320, Wellington, New Zealand Tel +64-4-473 3663 www.infratil.com
25 August 2026


Infratil Independent Valuation Update – 30 June 2026


Updated independent valuations, as at 30 June 2026, are provided for Longroad Energy, Galileo, and

Mint Renewables in the attached summary.



Any enquires should be directed to:


Brett Jackson

Infratil Investor Relations Director

Email: brett.jackson@infratil.com


Authorised for release by:

Matthew Ross

Infratil Chief Financial Officer

---

INFRATIL
INDEPENDENT

VALUATION

UPDATE

FOR THE

QUARTER ENDED

30 JUNE 2026

Portfolio Company
(NZ$ Millions)

30 June 202631 March 2026Movement

Longroad Energy

2,483.22,389.393.9

Mint Renewables

51.844.87.0

Galileo

266.0257.1 8.9

Notes: (1) Valuation methodologies and assumptions for 31 March included here: Infratil Full Year Results for the year ended 31 March

2026

Independent Valuation Update

For the quarter ended 30 June 2026

Commentary

•Independentvaluations were completed for five of Infratil’s portfolio companies as at30 June 2026.

•Given the stage of the strategic review, the independent valuation of Qscan as at 30 June 2026 has not been included in this release.

•The CDC valuation was released on 6 July 2026.

•The table presents Infratil’s share of independent valuations at 30 June 2026, with amounts reflecting the midpoint of current valuation ranges; methodologies remain

consistent with the prior period¹, with key movements outlined on the following slides

2
Longroad

•The 30 June 2026 independent valuation of Longroad decreased by US$185 million (4.6%) from US$4.01 billion at 31 March 2026, to US$3.83 billion.

•During the period, Infratil contributed US$118.3 million and increased its Class A ownership from 42.5% to 43.5% through the purchase of additional shares.

•On this basis, Infratil's 43.5% interest in Longroad is valued at US$1,403.8 million, up US$37.8 million from US$1,366.0 million at 31 March 2026. After adjusting for Infratil's

additional investment, the underlying value of Infratil's interest decreased by US$80.5 million, or 5.9%.

•Key drivers of the movement in valuation during the quarter included lower global inflation assumptions, which reduced forecast merchant power curves, together with a

modest increase in base rates. These impacts were partially offset by a reduction in the additional risk premium applied by the independent valuer.

•Overall, the independent valuer's assessed WACC decreased modestly from 9.00% to 8.95%.

•During the quarter, Sun Pond (197MW solar plus storage) commenced operations, and Longroad acquired an approximately 2.8GW solar and storage development project.

Given the recent timing of the acquisition, the project was largely valued at cost.

Galileo

•The 30 June 2026 independent valuation of Galileo increased by €8.9 million (2.6%) from 31 March 2026, to a midpoint of €346.4 million.

•During the period, Infratil contributed a further €2.8 million.

•On this basis, Infratil's 38% interest in Galileo is valued at €131.6 million, up €3.4 million from €128.2 million at 31 March 2026. After adjusting for Infratil's additional

investment, this represents an underlying valuation uplift of €0.6 million, or 0.5%.

Mint Renewables

•The 30 June 2026 independent valuation of Mint Renewables increased by A$7.1 million (13.9%) from 31 March 2026, to a midpoint of A$58.3 million.

•During the period, Infratil contributed A$4.9 million.

•On this basis, Infratil's 73% interest in Mint Renewables is valued at A$42.5 million, up A$5.2 million from A$37.3 million at 31 March 2026. After adjusting for Infratil's

additional investment, this represents an underlying valuation uplift of A$0.3 million, or 0.7%.

Independent Valuation Update

For the quarter ended 30 June 2026

16
43

114

Accent 1

0

173

239

Accent 2

237

0

140

Accent 3

118

75

157

Accent 4

247

239

32

Accent 5

135

196

64

Accent 6

Primary valuation methodology: Adjusted cost approach

across early-stage project portfolio, with cross-reference to

transaction multiples.

Equity value: A$58.3m

Longroad (43.5%) – US$1,403.8m (NZ$2,483.2m)Galileo (38.0%) – €131.6m (NZ$266.0m)

Primary valuation methodology: Transaction multiples for

more advanced projects and cost for entry-stage projects. DCF

methodology used for two projects totalling 8MW out of total

~17GW pipeline

Equity value: €346.4m

Mint Renewables (73%) – A$42.5m (NZ$51.8m)

1.Longroad Enterprise and Equity Value adjusted for committed but uncalled capital included in the independent valuation

2.Operating assets include operating and under construction projects

3.Assets that are expected to achieve Full Notice to Proceed (FNTP) in the next three calendar years

Valuation methodology

Key valuation assumptions

Risk free rate: n.a.

Asset beta: n.a.

Multiples for development projects that are ‘ready to build’

range from €50-400k/MW depending on country and

technology type (i.e. solar, wind, or standalone battery storage)

The valuer assigns a discount to the multiple that it considers

appropriate as the project moves towards ‘ready to build’

stage. For projects that are early to mid-stage of the

development lifecycle, only a small percentage of the ‘ready to

build’ value is captured with the majority of value being

recognised as projects get close to ‘ready to build’ stage.

Projects that have reached ready to build but do not have a

offtake solution in place are capped at 80% of the ready to

build benchmark multiple

Primary valuation methodology: Discounted cash flow (DCF)

using Free Cash Flow to Equity (FCFE) consisting of:

–A top-down approach (aggregate enterprise cashflows,

including a terminal value); and

–Bottom-up valuation approach (DCF using FCFE for

operating, under-construction, and near-term development

projects

3

, and a multiples approach for long-term

development pipeline),

–Platform derived from the difference between top down and

bottom-up valuations

Terminal year: Top down: 2057

Forecast period: Top down: 30Y, Bottom up: 40Y

Enterprise value: US$7,814.3m

Equity value

1

: US$3,567.3m

Net Debt: US$4,247.0m (inclusive of project financing, tax

equity, bridge loans, and parent entity debt)

Risk free rate: 4.93%

Asset beta: Top down: 1.05

Cost of equity: 14.4% top-down, 10.2% operating assets,

10.4% under construction, 10.7% near-term projects plus

milestone discounts, 18.3% long-term pipeline plus milestone

discounts

Terminal growth rate: 3.0% (top-down)

Operating assets

2

: 5,779MW

Near-term (3 years) dev pipeline

3

: 5,849MW

Long-term development pipeline (5 years): 29.9GW

Multiple for long-term development projects: US$130/kW

Platform value assessed around ~10% of total enterprise value

Independent Valuation Assumptions

Risk free rate: n.a.

Asset beta: n.a.

Multiples for early-stage development projects to range from

A$2-45k/MW depending on technology type (i.e. solar, wind,

or standalone battery storage)

The valuer applies an adjusted cost approach with reference to

transaction multiples, taking into consideration the stage of

project development.

Data sourced from publicly available filings. Our datasets may not be complete. Automated analysis can produce errors. If you believe any data on this page is incorrect, please contact us at hello@nzxplorer.co.nz. For informational purposes only. Not investment advice.