International Investor Roadshow Presentation Oct - Nov 2026

General20 October 2026CENUtilities

1
Contact Energy

Image: Tauhara Geothermal Power Station

International investor roadshow

October / November 2026

2
Disclaimer and important information

While all reasonable care has been taken in compiling this presentation, neither Contact

nor any of its directors, employees, shareholders nor any other person gives any

representation as to the accuracy or completeness of this information or accepts any

liability for any errors or omissions.

This presentation may contain certain forward-looking statements with respect of a variety

of matters. All such forward-looking statements involve known and unknown risks,

significant uncertainties, assumptions, contingencies, and other factors, many of which are

outside the control of Contact, which may cause the actual results or performance of

Contact to be materially different from any future results or performance expressed or

implied by such forward-looking statements. Such forward-looking statements speak only

as of the date of this presentation. Except as required by law or regulation (including the

NZX Listing Rules and the ASX Listing Rules), Contact undertakes no obligation to update

these forward-looking statements for events or circumstances that occur subsequent to

the date of this presentation or to update or keep current any of the information

contained herein.

Any estimates or projections as to events that may occur in the future (including

projections of revenue, expense, net income and performance) are based upon the best

judgement of Contact from the information available as of the date of this presentation.

EBITDAF, free cash flow and operating free cash flow are financial measures that are “non-

GAAP (generally accepted accounting practice) financial information” under Guidance

Note 2017: “Disclosing non-GAAP financial information” published by the New Zealand

Financial Markets Authority, “non-IFRS financial information” under ASIC Regulatory Guide

230: “Disclosing non-IFRS financial information” and “non-GAAP financial measures” within

the meaning of Regulation G under the U.S. Exchange Act of 1934.

Such financial information and financial measures (including EBITDAF, free cash flow and

operating free cash flow) do not have standardised meanings prescribed under New Zealand

equivalents to International Financial Reporting Standards (“NZ IFRS”), Australian Accounting

Standards (“AAS”) or International Financial Reporting Standards (“IFRS”) and therefore, may

not be comparable to similarly titled measures presented by other entities, and should not be

construed as an alternative to other financial measures determined in accordance with NZ

IFRS, AAS or IFRS accounting practice) measures. Information regarding the usefulness,

calculation and reconciliation of these measures is provided in the supporting material.

This presentation does not constitute financial or investment advice. This presentation does

not constitute an offer to sell, or a solicitation of an offer to buy, Contact securities and may

not be relied on in connection with any purchase of a Contact security.

Numbers in the presentation have not all been rounded and might not appear to add.

All references to $ are New Zealand dollar unless stated otherwise.

All trademarks, service marks and company names are the property of their respective

owners. All company, product and service names used in this presentation are for

identification purposes only. Use of these names, trademarks and brands does not imply

endorsement or that they are or will be customers of Contact and reflects public

announcements of intention only.

3
Contact Energy is one of New Zealand’s most

significant companies

CEN:NZX/ASX

4

th

Largest NZX Company

1


Contact Energy is dual-listed on NZX

and the ASX

S&P Global and MSCI

Continued representation within key

DJ BIC Asia Pacific and MSCI indices

Shareholder returns

Annual total shareholder return of 13%

over the last 10 years

2

Resilient, highly renewable

generation portfolio

Positioned to capture NZ

electricity market opportunity

Strong, diversified balance

sheet to support growth

Track record of consistent

earnings and dividend growth

•Generation 98% renewable in FY26 (up from 81%

in FY21).

•Diversified geothermal, hydro, solar and battery

portfolio.

•Gas and diesel peaking capacity adds resilience.

•Strong cash flow generation backed by operating

performance and renewable geothermal baseload.

•Deep relationships with industrial customers that

are electrifying process heat.

•Partnered with CDC to explore 250MW data

centre development option at Stratford.

•Proven specialist geothermal developer: 1.9TWh

new geothermal online in last 2 years.

•11TWh p.a. pipeline of wind, solar and geothermal

development options.

•Investment-grade rating and leverage discipline.

•3 debt capital market jurisdictions.

•Sustainable finance leadership with green bonds

and strong sustainability ratings.

•Existing hybrids, with further hybrid capacity

available.

Underlying EBITDAF, $M

3

546

573

663

774

1,011

FY22FY23FY24FY25FY26

DPS

35cps

FY23

40cps

FY26

>50cps

FY31e

4

S&P BBB

1. Based on free-float market capitalisation. | 2. Source Bloomberg. Assumes all dividends are reinvested on issue. | 3. Underlying EBITDAF excludes the impacts in FY23-FY25 from movements in an onerous contract

provision relating to the Ahuroa Gas Storage facility (AGS). | 4. All future dividend decisions are at the discretion of the Board at the time.

4
We own operate and develop low-cost, long-life

renewable generation and storage assets,

meeting the evolving needs of our customers

7

geothermal

stations

+ 1 under

construction

26

hydro

schemes

4

controlled

storage

lakes

3

thermal

peaking

stations

12TWh

mean

generation

1

1

solar farm

+1 under construction

3

debt capital

market

jurisdictions

59k

shareholders

700k

total customer

connections

2

1,421

employees

3

167

community organisations

supported in FY26

1

battery

+ 1 under

construction

~98% renewable

4

product verticals with

electricity, gas,

broadband and mobile

Note: All figures, unless specified, as at 30 June 2026.

1. Mean generation volume from Contact’s operational plant as well as wind and geothermal PPAs as at the date of this presentation i.e. excludes plant under construction. Volume is based on normal hydro and wind

conditions and excludes any assumptions for planned maintenance outages or generation that may be acquired on-market. | 2. Customer connections include Simply Energy connections as at 30 June 2026. |

3. Includes Western Energy employees.

5
Empowered

people and leaders

Unite our people behind

Contact31+ and develop NZ’s

best energy leaders

Relationships with

our stakeholders

Maintain enduring trust with

stakeholders, investing for secure, affordable

renewable energy while upholding our

environmental commitment

Productivity

Drive disciplined growth by

simplifying processes and

deploying automation

Tech advantage

Establish a distinctive edge in

data and AI on a simplified and

secure technology platform

Extend our advantage as

NZ’s geothermal leader

Scale on high-quality existing fields,

explore new options, and continue to

improve our cost-leadership position​

Build into new demand

with wind and solar

Deliver lowest-cost diversified wind

and rapidly deploy solar, anchored on

long-term industrial partnerships​

Lead the energy

transition at home

Empower our customers to shift

energy use, while making every

interaction easy and personal

Lead on new flexibility in NZ

Accelerate batteries, build advantage in

hydro flex and maintain gas flex,

optimising our portfolio in real time​​

Strategic pillars

Leading New Zealand’s renewable energy future

Values

Performance edgeOwn the futureBrave humility

Underpinned by continued operational excellence across our diverse and resilient portfolio

Enablers

6
Our renewable investment programme continues

Glenbrook-Ohurua

Battery 2

200MW / 400MWh

Target online Q1 CY28

Target IRR >10% at FID

3

Te Mihi Stage 2

Geothermal

101MW / ~840GWh p.a.

(~200GWh net uplift)

4

Target online Q3 CY27

Target IRR ~10% at FID

3

Glorit

Solar

150MWac / 287GWh p.a.

Target online Q4 CY28

Target IRR >12% at FID

2

Te Mihi Stage 2

•Construction underway.

Earthworks began March 2026.

•Battery packs under

construction with lithium price

locked in second half 2025.

•Steamfield separator, heat

exchangers and turbines for the

first unit installed. Cooling

tower near complete.

•Delays being incurred in

equipment delivery, in part due

to global shipping constraints.

•Target online remains Q3 CY27.

•Financial close reached in

June 2026.

•Early works underway.

•Notice to proceed issued to

EPC contractor.

1. Total construction cost over the life of the projects including joint venture and project financing (solar). | 2. Target Contact IRR includes joint venture returns and margin on acquired generation. Return on

acquired generation will ultimately depend on sales channel and market conditions. | 3. Representing target ungeared project IRRs. | 4. Indicative average uplift from new generation accounting for the planned

partial closure of Wairakei geothermal station.

Glenbrook-Ohurua

Battery 2

Glorit

Auckland

Wellington

Current projects under construction represent ~$1.3b of investment

1

, ~0.5TWh of net new generation

Under construction:

Kōwhai Park

Online Sep 2026

Glenbrook-Ohurua Battery 1

Online Mar 2026

Te Huka 3

Online Dec 2024

Tauhara

Online May 2024

Recent projects – Continuous build programme since 2021:

+275GWh p.a.

+100MW / 200MWh+430GWh p.a.+1,450GWh p.a.

7
Total uncommitted generation pipeline of 11TWh+,

provides optionality to accelerate with demand

We are advancing 4TWh+ of priority development options

to meet new demand opportunities

Huriwaka

250MW | 890GWh

Southland wind

>325MW | 1,210GWh

Te Mihi Stage 3

Up to 100MW | 830GWh

1

(Up to ~300GWh net uplift)

2

Tauhara 2

50 – 70MW | 415 – 580GWh

Stratford BESS

200MW | 400MWh

Argyle

80MWac | 180GWh

Stratford Solar (hybrid)

150MWac | 312GWh

1. Ultimate size is subject to additional consented mass-take. | 2. Represents potential net uplift in output after accounting for the planned closure of the Wairakei geothermal station. | 3. Fluid take is partially

consented. Ultimate size is dependent on additional land access and consented mass-take. | 4. Te Mihi Stage 3 is included on a net uplift basis.

Consent granted

In Fast-Track

Contact31+ priority

development options,

representing ~4TWh of

net new renewable output

And can draw additional projects from our 11TWh+ total pipeline to meet acceleration in customer needs

Tauhara 3

Up to 100MW | 830 GWh

3

High priority proposed

Contact31+ growth

projects subject to FID

Future development

pipeline options

under assessment

~11

Solar

Geothermal

4

Wind

0.5

0.7

Renewable generation development pipeline options, TWh

~4

~7

8
A pathway is in place for NZAS to act as long-term customer

underpinning our 1TWh+ Southland Wind Farm

Electricity stats

Up to

55 Turbines

>325MW

total capacity

Average annual output expected to be

>1,210GWh

Non-binding letter of intent (LOI) signed with Rio Tinto for a PPA to

support the potential restart of 50MW Line 4 potline at New Zealand

Aluminium Smelter (NZAS).

Consent approved April 2026.

Specialised infrastructure

advisor, Mafic, appointed to run

identification and selection

process for a strategic partner for

Contact’s extensive wind pipeline.

We have engaged a shortlist of credible wind partners.

Project updates

Contact is advancing strategic partner identification and targeting mid-2027 for Final Investment Decision

9
The impacts of the energy transition are apparent in the New

Zealand electricity market

Sources: EMI wholesale price data (OTA node), EMI demand data, EMI Generation output by plant, MBIE electricity & gas statistics.

Annual gas production, PJ

Gas supply is declining

rapidly

The electricity market is

increasingly renewable

135

108

93

FY24FY25FY26

-17%

CAGR

Thermal share of generation ~7%

1

in FY26,

the lowest since the market was introduced.

This reflected high hydro inflows and wind

conditions during the period and renewable

investment in recent years.

Pricing volatility and seasonal

spread have increased

Higher renewable generation is leading

to wider seasonal pricing spreads as

thermal (often the marginal price setter

when operational) shifts to

operating in winter.

Domestic gas production has

fallen 31% since 2024 (17%

CAGR reduction). Recent

drilling campaigns have been

unable to arrest this trend.

0

50

100

150

200

250

300

350

400

450

Oct-

16

Oct-

17

Oct-

18

Oct-

19

Oct-

20

Oct-

21

Oct-

22

Oct-

23

Oct-

24

Oct-

25

Oct-

26

Long-dated futures (>12 months)

Short-dated futures (<12 months)

Monthly average spot price

Reliable, plentiful natural gas

Gas outages & availability decline

Wholesale and futures electricity pricing

2

, $/MWh

New demand is

emerging

Since 2021 (last 5 years) demand

growth has averaged 0.3% p.a.

Large-scale committed and

prospective new industrial demand

is largely yet to come online.

~$80/MWh

average long dated futures

price

~$170/MWh

average long dated futures price

Long-dated futures recently settling

at ~$130/MWh, close to Contact’s

long-run expectation of

$120 – 130/MWh (2026 real)

1

1

1. Thermal share of generation is calculated using EMI generation output by plant, excluding non-identified generation of 2.9TWh (non-grid generation and losses). For FY26, the calculation is based on 2.8 TWh of thermal

generation (including gas and coal) and total grid-connected generation of 41.2 TWh. | 2. October 2026 represents month to date pricing up to 16 October 2026.

10
Demand for new electricity is expected to be driven by

electrification and digitalisation

25

30

35

40

45

50

55

60

65

202020222024202620282030203220342036

Renewable build

supports thermal

substitution

EMI

MBIE EDGS - Constraint

MBIE EDGS - Reference

MBIE EDGS - Innovation

6,952

7,278

7,304

7,564

5,500

6,000

6,500

7,000

7,500

8,000

8,500

201620182020202220242026

Electricity demand scenarios, TWh

Peak electricity demand, MW, annual peak half hour

Sources: EMI demand data, MBIE - Electricity Demand and Generation Scenarios, Tanspower Load and other projects data. Transpower Te Kanapu Future Scenarios (June 2026). Fonterra decarbonisation press

release. NZ Stats National population projections.

1. MBIE scenarios are defined as: Reference - Current trends continue with anticipated changes. Innovation - Current economic trends continue, alongside accelerated technological uptake and learning rates.

Constraint - International trends leave little room for domestic growth or innovation. I 2. Transpower Te Kanapu Future Scenarios (June 2026). Median EV share of the light passenger vehicle (LPV) fleet across the

five scenarios in 2046.

Growth in peak electricity

demand has been driven

primarily by residential usage,

broadly in line with population

growth.

Why it matters?

•

System capacity must meet

peak demand (not average).

•

Higher peaks require

investment in generation,

storage and networks.

•

Increases the value of flexible

capacity (hydro, batteries,

demand response).

MBIE’s scenarios range

from 47–61 TWh by

2035, reflecting

different potential

pathways for

electrification,

economic growth, EV

adoption, industrial

demand, and large new

loads such as data

centres.

Data centres represent a

significant demand opportunity,

with ~1GW of proposed load

currently progressing through

Transpower's pipeline.

Metals: Contact has signed a

LOI with Rio Tinto for a PPA to

support the potential restart of

idle ~50 MW Line 4 potline at

the NZ Aluminium Smelter.

Dairy electrification: Fonterra

plans to phase out coal by 2037.

It is replacing gas-fired heat at

Whareroa and Edgecumbe and

installing new electric boilers at

Waitoa.

Residential: Stats NZ forecasts

population grow of over 1% p.a. over

the next 20 years.

EVs expected to reach >40% of

New Zealand's light passenger

vehicle fleet over the same period

(3.7% in 2026).

2

Key drivers across various market scenarios

61 TWh

50 TWh

47 TWh

11
The nature of the data centre growth opportunity in

New Zealand has evolved

WorkloadsLocationScaleNZ example

From small

10-20MW

domestic cloud

centres ...

(What we have

today)

Domestic

enterprise

and cloud for

local

business

Built in major

cities close to

users to

minimise

latency

10–20MW

facilities

CDC Silverdale

20MW:

... to >100MW

centresfor

global AI

workloads

(Where we’re

going)

Global AI

workloads

growing

rapidly,

creating

export

opportunity,

powered by

renewables

Built in

regional hubs

connecting

directly to

transmission

for latency

tolerant

compute

Scaled

facilities up

to 1,000MW

CDC’s 250MW

proposal at

Stratford:

Sources: BCG report “New Zealand: A Destination for Data” (2026); BCG report “Data Centres as Strategic Infrastructure” (2026).

1. Destinations listed are the first main location the cable connects to, before connecting into wider global network. Some cables also connect to small island states before listed destinations | 2. Illustrative only.

Zone advantages include sites with rural farmland parcels (not sensitive or conservation land), neighbouring sub-stations where there is grid capacity to serve new load and viable pathways to fibre connectivity.

With lower sensitivity to latency for AI workloads, and a growing fibre network, New Zealand is well positioned to capture a

share of global data centre growth

AI is changing the scale, location and scope of data centresNew Zealand offers six strategically advantaged zones for data centre

development, and has a growing sub-sea fibre-optic network

Hawaiki (to AUS and US)

Southern Cross Tasman

Express (2028, to AUS)

Southern Cross (to AUS)

Tasman global access

(to AUS)

Proposed Tasman ring

network (2027, to AUS)

Proposed Tasman ring

network (2027, to AUS)

Honomoana

(2026, to AUS and US)

Southern Cross (to US)

Nelson -

Levin

Aqualink

Existing network cable

1

Future network cable

1

Advantaged DC Zones

2

Stratford

Datagrid’s 280MW

proposal in

Southland

12
New Zealand is an internationally competitive location for

large-scale data centres hosting AI workloads

Investment driversKey componentsNew Zealand’s competitive position (BCG analysis)

Rapid speed

Grid connection1–3 years for grid connection vs 2–5+ years for other developed countries

PermittingFast track permitting programmes for infrastructure, including data centres

Generation supplyGeneration to power ~1GW DC equivalent under construction / shovel-ready

Competitive cost

EnergyCost competitive 100% firmed energy contracts

LandAbundant land; 10% larger than UK & only 5m people; cost on par with peers

ConstructionConstruction cost on par with peers

Advantaged sites

Transmission availability>1GW of grid capacity available within 1-2 years across 6 advantaged zones

1

Connectivity4 existing subsea cables; 4 new cables under development, including by Google

Climate, water & resourcesAbundant water; mild climate enables cooling efficiency

Supportive policy

Taxes, duties & tariffsLow/zero tariff; 20% immediate CAPEX depreciation; favorable thin cap

Business environment8

th

out of 82 countries in the EIU’s 2024 Business Environment Rankings

Sustainable &

secure

Energy sustainability95%+ renewable electricity supply by 2027 – 1 of 3 developed countries

Data security1 of only 7 non-EU countries recognised by EU for adequate data protection

Political stabilityVery low risk; Moody’s Aaa; 2nd in EIU’s Global Democracy Index

^

^

^

^

^

^

^

^

^

^

^

^

Source: BCG report “New Zealand: A Destination for Data” (2026).

1

North Waikato, Taupo, Taranaki, Manawatu, South Canterbury, Central Otago.

~

~

13
The potential for data centre expansion in NZ would be

underpinned by additionality and sustainable development

45

125

300

425

150

300

350

700

202020252030F2035F

800

1,425

Domestic

Export (base)

Export (high)

New Zealand data centre market, with future export scenarios, 2020-2035

Data centre computing capacity, MW

Source: BCG report “New Zealand: A Destination for Data” (2026).

BCG’s market scenarios

indicate significant

growth potential in the

New Zealand data

centre market driven, in

part, by the potential to

export AI compute

Key development principles expected to unlock export scenarios

Contact’s view of the ‘bottom lines’ for data centre development

Large scale data centre demand would unlock new renewable development from extensive pipelines in the NZ market

1

New data centre demand is matched by incremental

renewable energy, built from extensive NZ pipelines

2

Data centres pay their share of transmission costs,

uplifting utilisation and spreading costs over a wider base

3

Customers pay a fair price for power, reflecting the cost of

building new firmed renewable electricity

4

Operations are environmentally sustainable, including through

the use of closed loop cooling systems (limiting water use)

5

Local communities benefit, including through skilled job

creation both in the construction phase and ongoing

6

Enduring value is created in the regions and for New Zealand

14
High-capacity fibre connection

Solar and battery development options

Available transmission capacity

Diverse high-capacity fibre,

both terrestrial and subsea,

provides connection to

Auckland where New

Zealand’s international

cables land.

350MW transmission capacity

available within 1-2 years with

minimal substation work.

600MW expected to be

available within 2-3 years

following planned upgrades.

3

150MWac / 312GWh p.a. solar

farm consented, with DC

coupled batteries potentially

providing up to 750MWh

storage.

2

500MW grid-scale battery

capacity consented.

Land owned and under option

Existing site complemented

by significant adjacent land

options.

Able to support scalable

renewable and load growth

opportunities.

Long-term member of the community

50 years operating in the

Stratford community.

Long-standing relationships

with local stakeholders

including councils and

tangata whenua.

Note: The operation of Contact’s existing 200MW fast-start gas peaking assets at Stratford is not impacted by the data centre concept.

1. IT / compute load of 250MW and approximately 350MW total load including ancillary load at peak times (subject to final design). | 2. Based on batteries with 5-hour duration. | 3. BCG analysis based on

Transpower data and disclosures. | 4. Power Usage Effectiveness (PUE).

Following the March 2026 closure of the TCC gas plant, we are taking steps to leverage the unique combination of grid capacity,

scalable land, renewable development options and diverse fibre connectivity at our Stratford site

Contact and CDC will seek resource consent for a 250MW data centre

1

. It would be supported by co-located battery

storage development and new generation from Contact’s 11TWh development pipeline. The data centre would feature

CDC’s fully closed-loop cooling technology keeping operational water use exceptionally low. Current activities focus on

consenting, site and infrastructure design, customer engagement and development planning.

We have partnered with CDC to explore data centre

development at our highly strategic Stratford site

Favourable environmental conditions

Site altitude lowers peak

temperatures, supporting

data centre PUE.

4

Local climate supports rain

harvesting opportunity

enabling net-zero water

consumption.

.

15
Our capital allocation framework is resilient and accretive

Capital allocation priorities

Growth investment commitments

Investor metrics

Preserve financial

strength

Fund core

operations

Invest for growth

and transition

Deliver dividends

from cash flows

Maintain BBB credit rating; Net

debt/EBITDAF target 2.6–2.8x

(upper limit 3.0x).

BAU sustaining

capex $110–120M p.a.

average (2025 real)

Allocate to projects exceeding

target returns; prioritise

renewables and flexibility +

timebound enhancements

Payout 80–100% rolling four-year

OFCF

1

; consider buybacks when

leverage sustainably below target and

if further dividends are unimputed

+300bps uplift

by FY31

Maintain

55% - 60% of

EBITDAF

Operating free

cash flow

ROIC

trajectory

Hurdle

rates

Project

returns >10%

(or WACC + 200–

300bps+)

Investments to exceed

target return thresholds

and respond to market

signals (including demand

for PPAs and strong

business performance)

Maintain

investment discipline

and flexibility

Prioritise

balance sheet

Strategic assets held

on balance sheet to

preserve control

Non-core assets

financed off balance

sheet to share risk and

improve returns

Sources of balance sheet capacity to fund growth

Grow EBITDAF for higher

debt market capacity

Operating Free Cash Flow

in excess of committed dividends

Hybrids for

equity credit

Additional equity – DRP

16
Appendix 1

Supporting information,

New Zealand electricity sector

17
NZ’s electricity market comprises competitive generation

and retailing supported by regulated distribution

Spot

electricity

pool

Million consumers

2.4

4

Major generators

1

Competitive

29

Distribution

businesses

National

transmission

grid operator

1

Regulated monopolies

8

Retailers over

50k connections

Competitive

23%

11%

33%

21%

12%

Other

12%

52%

36%

Channel

by volume

Sources: Major generators’ FY26 Annual and Operating Reports, Electricity Authority, EMI and Commerce Commission.

1. Excludes PPA purchases and market acquired generation.

C&I

Retail

NZAS

38.5%

8.0%

24.5%

11.0%

13.0%

4.5%

0.5%

Average

electricity

bill

20%

22%

25%

19%

13%

Market share

by total ICPs

Other

Generation

Transmission

Distribution

Retail

GST

Metering

Levies

Rising regulated pass-through costs for transmission and distribution make up a large portion of the customer bill

From 1 April 2025, Commerce-Commission-approved changes to network

charges began to take effect, increasing household bills by $10-25 per month on

average (depending on region and usage profile). Costs are increasing annually.

18
New Zealand’s electricity supply is highly renewable

Emissions for electricity generation, million units of CO

2

e

10

2

Sources: EMI demand data, EMI Generation output by plant, MBIE quarterly energy sector greenhouse gas emissions, NZX Hydro (post-market formation) 1997 – 2025.

41.2

TWh

1,900

2,000

2,100

2,200

2,300

2,400

2,500

2,600

2,700

2,800

2,900

3,000

3,100

3,200

3,300

3,400

3,500

3,600

3,700

200020052010201520202025

Calendar year

Max

Min

Avg: 2809

Average controlled hydro lake storage volumes, GWh

Market emissions have fallen

6%

60%

23%

9%

Gas

1%

Coal

Hydro

Geothermal

Wind

1%

Solar

Total

national

electricity

generation

FY26

1

Generation share by technology

1

, %

2.7

0.2

2017

3.0

0.7

2018

2.5

1.4

2019

2.7

1.4

2020

2.6

2.9

2021

2.4

1.0

2022

1.8

0.1

2023

2.3

1.4

2024

2.0

1.6

2025

1.2

0.3

2026

Natural gasCoal

5 year average

2022 – 2026

=2.9

5 year average

2017 – 2021

=4.0

Stored energy reserves, including gas and coal, remain important sources of system resilience in dry periods

1. FY26 total electricity generation is based on EMI generation output by plant, excluding non-identified generation of 2.9TWh (non-grid generation and losses).

19
▪NZAS now operating on long-

term supply contracts coupled

with demand response.

▪1TWh of committed dairy

electrification projects to be

supported by summer-

weighted generation.

▪NZ Steel’s Electric Arc Furnace

backed by shaped supply

contract.

▪Market and regulatory settings

have evolved alongside the

energy transition.

oNon-discrimination

obligations and super-peak

market making have been

implemented.

▪New Zealand Aluminium

Smelter (NZAS) demand

response mechanisms in place

for dry year support.

▪Huntly Firming Options

signed to support dry year

capacity.

▪Strategic coal reserve and

stored gas and hydro.

▪Fast Track consenting

regime now operating.

▪New renewable generation

added 4TWh over the last

five years (BCG).

1

▪Electricity market reached

93% renewable in FY26.

▪Industry-wide focus on energy

wellbeing consumer care and

reducing barriers to access.

▪Disconnections viewed as last

resort.

▪No disconnection or

reconnection fees (Contact).

▪In FY26 Contact Good Initiative

provided ~$5M of customer

and community support.

The market has adapted for the energy transition

Investing at

pace in

renewable

energy

Managing fuel

security and dry

year risk

Enhancing

market

settings

Supporting

energy

wellbeing

Sector investment, customer innovation and market settings have all advanced as New Zealand has progressed through the

energy transition

▪RMA Reform: Planning and

Environment Acts passed in

2026 with transition to occur

progressively to ~2030.

▪~3TWh of generation either

committed or under

construction and expected to

come online by 2027.

2


▪Consultation has closed on MBIE’s proposed Winter Reliability

Obligation framework. Next steps yet to be confirmed.

▪Potential to extend HFO for further dry year support.

▪Potential for fit-for-purpose LNG import terminal to enhance fuel

diversity.

▪Potential for diesel storage as an additional strategic reserve.

▪Legislation expected in 2027 to enhance EA enforcement and

regulatory powers.

▪Contact advocating for a

market-wide obligation to

connect to further lift energy

wellbeing outcomes.

▪$7.5M committed through

Contact Good Initiative in

FY27 to support customers

and communities.

Delivered

Looking ahead

Innovating for

industrial and

commercial

customers

▪Potential reopening of NZAS

Line 4 potline at Tiwai Point.

▪Continued dairy

electrification, aligned to

summer load.

▪Estimated New Zealand data

centre capacity of up to

~725MW by 2035 (Invest NZ).

3

1. BCG. Energy to Grow: Securing New Zealand’s Future (2025). ​| 2. Company announcements and Contact’s analysis. ​| 3. Invest New Zealand, Data and AI infrastructure Report (2026). Data based on base case export

scenario. High case export scenario indicates data centre capacity of up to 1,425MW by 2035.

20
Appendix 2

Supporting information,

Contact Energy

21
57

76

100

939

-265

-291

-315

-346

-459

-85

-56

-74

-80

-185

-94

-269

-326

-256

1,023

FY22FY23

1,269

53

FY24

1,476

50

FY25

1,640

-14

FY26

Electricity sales margin

Other gross margin

Fixed operating costs

Location losses

Variable fuel costs

546

573

663

774

1,011

Operating earnings (EBITDAF)

106

115

127

136

132

3.69

1.39

FY22

3.73

1.42

FY23

3.80

1.22

FY24

3.69

1.73

FY25

3.68

3.91

FY26

5.08

5.14

5.02

5.42

7.58

RetailLong-term sales

117

126

116

200

138

1.13

0.39

FY22

0.52

0.15

FY23

1.62

0.59

FY24

1.09

0.46

FY25

0.23

0.68

0.83

FY26

1.52

0.67

2.20

1.55

1.74

ThermalAcquiredPPA Purchases

Electricity sales

Variable fuel costs

11111

3.94

3.28

FY22

3.92

3.19

FY23

3.63

3.39

FY24

3.30

4.54

FY25

5.03

4.91

0.01

FY26

7.22

7.10

7.02

7.84

9.96

HydroGeothermalBattery

(i) Renewables

(ii) Thermal, acquired and PPAs

133133

150

186

155

0.94

2.10

0.63

FY22

1.10

1.44

0.09

FY23

1.13

2.57

0.51

FY24

1.17

2.30

0.51

FY25

1.86

2.01

0.23

FY26

3.66

2.63

4.21

3.97

4.10

Commercial and IndustrialCFDsSpot sales

(i) Long-term channels

(ii) Market channels

Price

($/MWh)

Volume

(TWh)

Price

($/MWh)

Volume

(TWh)

Fuel cost

($/MWh)

Volume

(TWh)

Fuel cost

($/MWh)

Volume

(TWh)

Our integrated portfolio performance is underpinned by

long-term sales channels and low-cost renewables

Continuing operations, $M

1

EBITDAF

1

2

1

2

1. Refer to slide 46 of the FY26 Results presentation for a definition and reconciliation of EBITDAF. EBITDAF figures are underlying i.e. excluding the impacts of the ($113M) AGS onerous contract provision expense in FY23, a

$12M net movement in the AGS provision in FY24, and a release of the AGS provision of $98M in FY25.

117121

137

158

140

8.739

7.772

9.232

9.390

11.687

Price

($/MWh)

Volume

(TWh)

22
With the Stratford data centre online, volume and price of

Contact’s strategic fixed price channel would both increase

Channels to market, TWh

3.7

3.9

1.9

2.0

FY26

11.5

Retail

CFDs

C&I

Strategic

fixed price

Pricing linkage

Channel net

price, FY26

Contact31+ expectations by channel

VolumeNet price

$155/

MWh

Reversion to long-run

wholesale price

expectations. Volume mix

adjusts based on load

and fuel positions.

$165/

MWh

Based on long-run

wholesale price

expectations (when

contracted),

adjusted for shape

and load. Inflation-

index linked

$92/

MWh

Excluding supply to the

proposed Stratford data

centre, volume expected

to be steady, reflecting

offsetting impacts from

the step down in MCY

and NZAS

3

volumes as

Fonterra and NZSteel

volumes commence.

Closely linked

to ASX futures

(short-term)

Closely linked to ASX

futures (short-term)

Long-run view of wholesale price

$120-130/MWh

2

2026 real terms

Base price at Otahuhu

Contracting accounts for many factors

including load shape and location

1. ASX prices as at 7 October 2026. | 2. This is a through-the-cycle measure in a balanced market. Prices achieved are a function of the market at a point in time. | 3. New Zealand Aluminium Smelter (NZAS).

Reversion to long-run

wholesale price

expectations. Volume mix

adjusts based on load

and fuel positions.

Long-term channel

generally tracking to

inflation over time.

Limited linkage to

short-term futures

$174/

MWh

Energy price increases

linked to inflation.

Volumes steady, with

potential uplift linked to

retail gas penetration.

ASX linked

ASX futures prices,

Otahuhu, FY27 to FY31

1

57

163

163

70

119

170

170

71

122

171

170

69

127

174

175

73

Dec-

26

113

Dec-

27

Dec-

28

Dec-

29

Dec-

30

OTA quarterly

CFDs

C&I

Strategic fixed price

Retail

With Stratford data centre:

Ex-Stratford data centre:

23
Our operating assets are diversified both geographically

and by technology

Operational generation assets across New Zealand, capacity, MW

1

Dunedin

Wellington

Tauranga

Auckland

Stratford peakers 200MW

Branch River 11MW

Christchurch

Wairakei - 138MW

Te Mihi 1 & 2 - 166MW

Poihipi - 53MW

Ohaaki - 41MW

Tauhara - 174MW

Te Huka 1 & 2 - 26MW

Te Huka 3 51MW

Kaimai 42MW

Matahina 77MW

Wheao & Flaxy 28MW

Hinemaiaia 7MW

Esk 4MW

Mangahao 40MW

Mangorei 4MW

Motukawa 5MW

Patea 32MW

Kuratau 6MW

Wairere 4MW

Mokauiti 2MW

Cobb River 36MW

Waihopai 3MW

Amold 3MW

Kumara/Dillmans/

Duffers 11MW

Kaniere Forks/McKays 1MW

Wahapo 3MW

Coleridge 40MW

Highbank/Montalto 33MW

Paerau/Patearoa 13MW

Deep Stream 6MW

Waipori 93MW

Piriaka

1

1MW

Bream Bay 8MW

Clyde 464MW

2

Roxburgh 320MW

2

Whirinaki 156MW

1. Capacity shown is the maximum rated capacity (MCR or nameplate capacity) for each plant, which may differ from the actual operational capacity in a range of circumstances. | 2. Clyde and Roxburgh power

stations each form part of the Clutha hydro scheme.

Thermal peaking plant

Hydro stations

Geothermal stations

Levin

Glenbrook-Ohurua Battery 1

100MW/ 200MWh

Battery Energy Storage System

Solar

Kōwhai Park

150MWac

649MW of North

Island geothermal

255MW of North

Island hydro

1,040MW of South

Island hydro

24
We have an attractive and diversified pipeline of

development options

1.Final size of wind projects to be confirmed.

2.Capacity for solar projects is shown as MWac.

3.Consent granted for 500MW of standalone BESS at

each of Glenbrook and Stratford, including 300MW

online or under construction at Glenbrook. Stratford

solar consent includes an additional 150MW of DC

coupled BESS.

4.Fluid take partially consented. Ultimate size is

dependent on consented mass-take (and for Tauhara

3, additional land access).

5.Kaihiku is a 50:50 JV with 300MW total capacity.

Solar options

Wind options

1

Land access secured

Consenting underway

Consented

~7TWh

1.2

2.0

3.8

~2.5TWh

Combined solar and wind pipeline

options of ~10TWh

0.2

0.3

2.1

Project Technology

Capacity

(MW /

MWac)

1,2

Estimated

output

(GWh)

Expected

online date

Project status

Land

secured

Consent

lodged

Consented

Under

construction

Committed

Te Mihi Stage 2Geothermal101840Q3 CY2027

GloritSolar150287Q4 CY2028

Glenbrook-Ohurua 2

3

Battery200

4

n/aQ1 CY2028

High

-

priority Contact31+

ArgyleSolar80180

Stratford

3

Solar (hybrid)150312

SouthlandWind>3251,210

HuriwakaWind250890

Stratford

3

Battery 200n/a

Tauhara 2 Geothermal50 - 70415 - 580

Te Mihi Stage 3

4

GeothermalUp to 100Up to 830

Tauhara 3

4

Geothermal

Up to 100Up to 830

Assessing

Kaihiku (JV)

5

Wind

3001,060

KaiparaSolar

100190

Moa CreekSolar

225490

PoutoWind

>400~1,500

HapuakoheWind

250710

Mackenzie BasinSolar

250540

OtotokaWind

150530

MarlboroughWind

100330

Other solar Solar

400830

Other windWind

250750

Consenting activity progressed to support lodgement.Fluid take partially consented.