Channel Infrastructure NZ Limited (NZX: CHI) filed “Presentation to E&P’s 11th Annual SMID Caps Conference” with NZX on 26 October 2026, as an operational update announcement.

From the announcement:“Excluding revenue from Government diesel storage contract announced 20 April 2026 3 3 Geographic Location Marsden Point has direct access to the Auckland market via Channel’s 170km pipeline.”
When was it filed?
26 October 2026
Where is the original?
NZX announcement
Channel Infrastructure NZ Limited logo

Presentation to E&P’s 11th Annual SMID Caps Conference

Operational Update26 October 2026CHIEnergy

1
E&P’s 11

th

Annual

SMID Caps

Conference

NZX: CHI | ASX: CHI

October 2026

2
World-class operator with strong safety track record

Ownership of critical infrastructure in New Zealand and Australia

Long-term customer contracts, >50%

1

of contracted revenue is fixed / capacity based and independent of fuel volumes

Stable inflation-linked revenues underpinned by long term contracts, strong cash flows and balance sheet

Stable and growing dividend paying 70-90% of Normalised Free Cash Flow

Infrastructure resilient through transition to liquid renewable fuels

Proven execution with capital intensive projects delivered safely, on budget, and on time that have significantly grown

earnings and diversifiedcustomer base

Significant opportunity for selective and disciplined growth including additional storage, delivery of the Marsden Point

Energy Precinct and acquisitions in New Zealand and Australia

Investment Proposition

1. Excluding revenue from Government diesel storage contract announced 20 April 2026

3
3

Geographic Location

Marsden Point has direct

access to the Auckland

market via Channel’s 170km

pipeline. The next nearest

alternate Auckland fuel

supply import terminal is

located at Port of Tauranga,

195km from Auckland by

road.

The fuels pipeline from Marsden

Point is the lowest-emission

supply route for transport to

Auckland, and does not

contribute to traffic congestion.

There is no pipeline between Port

of Tauranga and Auckland.

4
Ownership of Critical Infrastructure in New Zealand and Australia

>290

>410

25%

share of Somerton Pipeline to

Melbourne Airport

>350

5
Key Financial Metrics – Continuing Operations

Revenue

Set to grow with new contracted revenue in

FY27-28

Normalised Free Cash Flow

1

EBITDA (Margin %)

FY26 expected to be $103-$108 million

Dividends

Stable and growing

Growth Capex

Above WACC returns and contracted revenue

Free Cash Flow Conversion

Disciplined financial management

1. Net cash generated fromcontinuing operations less financing, maintenance capex, excluding conversion costs, site redevelopment costs and growth capex (including acquisitions)

$88.2m

$130.7m

$139.8m $140.2m

$72.9m

FY22FY23FY24FY25HY26

Underlying RevenueLegacy Wiri lease

$57.4m

$87.2m

$95.1m

$93.4m

$48.8m

FY22FY23FY24FY25HY26

Underlying EBITDALegacy Wiri lease

(65%)

(67%)

(68%)

(67%)

(67%)

$35.5m

$61.8m

$63.4m

$66.9m

$33.6m

FY22FY23FY24FY25HY26

62%

71%

67%

72%

69%

FY22FY23FY24FY25HY26

$15.8m

$30.6m

$29.3m

$27.1m

$25.1m

FY22FY23FY24FY25HY26

2.00cps

1.50cps

7.00cps

12.00cps

11.00cps

13.00cps

7.25cps

FY22FY23FY24FY25HY26

OrdinarySpecial

6
Strong balance sheet and disciplined Capital Allocation Framework

1.Calculated as total borrowings (bank, fixed rate bonds) less cash and cash equivalents. Excludes

the fair value movement of retail bond CHI030

Growth investment

Net Cash Flow from Continuing

Operations

less Financing Costs

Deleveraging

Target credit metrics consistent

with a shadow BBB/BBB+ credit

rating

Dividend Policy

3

Deliver a stable and growing dividend by paying out 70-90% of

Normalised Free Cash Flow on average over time

Maintenance Capex

8-10% revenue

Conversion

~$27 million remaining to be spent

across H2 2026 and 2027

Normalised Free

Cash Flow

2

Excess Cash Flow

available for

Special dividends

At the Board’s discretion, in the

absence of growth investment

opportunities

Above WACC returns

Contracted Revenue

0

30

60

90

120

150

180

20262027202820292030

Retail bonds (CHI030)Retail bonds (CHI020)Bank

6.75% p.a.

CovenantHY26FY25HY25

Net debt

1


$346m$330m$297m

Liquidity headroom

$93m$108m$138m

Leverage

(Net debt/Rolling 12-month EBITDA)

3.8x3.6x3.1x

Gearing

(Net debt/(Net debt + Equity))

<55%

31%30%27%

Interest cover ratio

(Rolling 12-month EBITDA/Net interest expense)

>2.5x

5.75.65.2

Weighted average debt maturity

3.1 years3.6 years3.7 years

Debt Maturity Profile ($m) as at 30 June 2026

2.Net cash generated fromcontinuing operations less financing, maintenance capex, excluding

conversion costs, site redevelopment costs and growth capex (including acquisitions)

3.The Board reserves the right to amend the dividend policy at any time. Each dividend will be

determined after due consideration of the capital requirements, operating performance, financial

position and cash flows of the Company at the time

7
579

705

693

710

679

699

729

330

1,258

1,404

1,422

1,040

2023202420252026

H1H23Q26

498

509

504

487

514

483

520

242

1,012

992

1,024

729

2023202420252026

H1H23Q26

556

547

538

536

544

540

551

258

1,100

1,087

1,089

794

2023202420252026

H1H23Q26

YTD DIESELYTD PETROL

729m litres

In line with Envisory

outlook

794m litres

In line with Envisory

outlook

1,040m litres

Broadly in line with

Channel’s expectations

YTD JET

YTD Q3 2026 fuel throughput broadly in-line with expectations, despite Iran conflict

8
65%

28%

18%

13%

2026 guidance further upgraded

•FY26 EBITDA guidance further upgraded reflecting:

•greater certainty around fuel throughputs with eight

months’ visibility

•New Zealand Government diesel storage contract

delivered to plan in June 2026

•Z Energy jet storage delivered in early July, six months

ahead of schedule

•Assumed jet fuel growth of ~2% with some additional

passenger demand being absorbed by available seat

capacity on existing flights

2027 outlook

•Full year EBITDA contribution from the Z Energy jet storage

and Higgins bitumen contracts (~$9 million)

•Full year EBITDA contribution from New Zealand

Government diesel storage contract (~$14 million)

•The PPI applicable to FY27 is expected to be published in

November 2026

•Channel will invest an additional $700k to $900k per

annum from FY27 in operating expenditure to support

resilient import terminal operations and the growth

pipeline

FY26 Guidance and Outlook

FY26 EBITDA

Guidance

$95–100 million

(FY25: $93.4 million)

$97-$105 million

$103 - $108 million

FY26 Maintenance

capex

8-10% revenue

(FY25: 8.8%)

UnchangedUnchanged

Normalised Free Cash

Flow Conversion

Broadly in line

with FY25

(FY25: 72%)

UnchangedUnchanged

Dividend Policy

70-90% of

Normalised Free

Cash Flow

(FY25: 13.0 cps)

UnchangedUnchanged

February 2026

Guidance

May 2026

Guidance

August 2026

Guidance

9
51%

51%

53%

52%

53%

53%

53%53%

0

20

40

60

80

100

120

140

160

180

20252026202720282029203020312032

Contracted storageTerminal revenue - fixedTerminal revenue - variable

Contracted storage - Government dieselInflation of 0% to 2.5%Take or pay threshold + Contracted Storage

Contracted revenue outlook $M

1

Revenue underpinned by contracted fixed revenue, PPI indexation and take-or-pay

1.Outlook uses Envisory base case (released October 2024) assumptions and is subject to change based on actual fuel throughput volume. Contracted Revenue from 2026 onwards incudes 3.25% inflation for FY26

2.Excluding revenue from Government diesel storage contract announced 20 April 2026

Contracted

Fixed

Revenue

Fixed revenue %

of total revenue

2

2

10
-

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

20242025

2026

2027

20282029

2030

2031

2032

2033

20342035

2036

2037

20382039

2040

2041

2042

2043

20442045

2046

2047

20482049

2050

2060

PetrolDiesel

Jet2024 Envisory Outlook

2026 Envisory "slower transition" case2026 Envisory "faster transition" case

Updated Envisory forecast: 1.3bn litres of additional throughput estimated to 2050

•Channel uses Envisory’s long-term forecast for business planning

purposes but Envisory’s outlook is indicative only. Channel applies its

own views ondemand and operating conditions when developing its

business plans and market guidance

•Channel’s existing infrastructure can evolve as demand changes.

Since converting Marsden Point to an import terminal, Channel has

grown the proportion of its revenue that is capacity-based and

independent of fuel throughput to more than half of its revenue

Key highlights on Envisory’s updated outlook:

•Envisory’s base case for total fuel throughput in 2060 is

approximately 2% higher than its October 2024 outlook with an

increased share of New Zealand’s petrol and diesel demand to flow

through Channel’s infrastructure

•Consistent with Channel’s expectations, Envisory has lowered its

near-term jet fuel outlook following Auckland Airport’s revised

passenger forecasts and the impact of high fuel prices in 2026.

Envisory continues to expect long-haul travel to support demand

over time, with its 2060 jet fuel outlook broadly unchanged

•Diesel demand is expected to remain higher over a longer timeframe

•Evolving geopolitical environment and the importance of diesel to

New Zealand’s primary and export sections reinforces importance of

New Zealand Government’s strategic diesel reserve providing nine

days of additional storage capacity through to December 2027

•Slower vehicle fleet turnover and electric vehicle uptake mean petrol

demand is expected to remain higher for longer than in Envisory’s

October 2024 outlook

Marsden Point Throughput Outlook (Million Litres)

1

1.Envisory base case released October 2026

11
Our Strategy

OUR VISION

World-class energy infrastructure company

OUR PURPOSE

Delivering resilient infrastructure solutions to meet changing fuel and energy needs

OUR STRATEGIC PRIORITIES

Strong safety

systems and

culture

Resilient

infrastructure

Long-term asset

management

Customer focused

People and

capability

development

Future focused

Continuous

Improvement

Adaptive

Repurposing

Marsden Point

Support transition

of aviationto lower

carbon fuels

Marsden Point

Energy Precinct

Concept

Brownfield

opportunities at

Marsden Point

Consolidator of

fuels infrastructure

Supply chain

optimisation for

our customers

Reducing

environmental

impacts

Community

engagement and

iwi relations

Just transition

Transparency and

disclosure

Target credit

metrics consistent

with a BBB/BBB+

shadow credit

rating

Deliver above

WACC returns

Cost management

Stable and growing

dividends

Infrastructure

Partner of Choice

Grow Through Supporting

the Energy Transition

More Sustainable Future

World-Class

Operator

High Performance

Culture

Grow from

the Core

Support Energy

Transition

Good Neighbour,

Good Citizen

Disciplined Capital

Management

12
Selective and disciplined approach to growth

Nearer term opportunities identified for:

•Additional product storage

•Fuel and energy security projects

Deep experience in project delivery

safely, on budget and on time

Strong return on investment given

repurposing of existing assets

Marsden Point Energy Precinct

#1

Synergistic consolidation along

Channel’s current supply chain to

Auckland Airport

Channel already owns a premium suite

of assets in the New Zealand fuels supply

chain, handling 80% share of Jet volume

and 40% of all transport fuels

#2

Measured growth step-outs

focused on adding to the quality

of Channel’s assets

Acquisitions in New Zealand or

Australia where there is opportunity to

add value:

•Through world-class capability and

proven operation of high-hazard

facilities

•By supporting our customers’

strategies as they evolve and their

capital is reprioritised

•Targeting liquid fuels growth

markets (e.g. jet) and opportunities

supporting the energy transition

Embedded growth opportunities from

acquisitions

#3

MCH, Ammonia / Greenfields Fuels Storage
(9 hectares)

Biofuels Manufacture

Jetties

SAF / Hydrogen

manufacture

Lease (to Long-term Tenant)

Public Access (Mair Road)

Diesel Peaker

Truck Loading Facility (Leased)

Flow Battery /

Strategic Storage

IPL

Stormwater Retention Basin

Jet/SAF Compound

(120 Million Litres Capacity -

75 Million Litres contracted)

Diesel/Biofuels Compound

(120 Million Litres Capacity)

Energy Security Opportunities

Future Fuels Manufacturing Opportunities

Additional Storage Opportunities

Current Facility

Leased to Third Parties

Owned by Others

Marsden Point Energy Precinct

Transformational for Channel and New Zealand

Bitumen Terminal

(under construction)

Transpower, Northpower

Greenfields Fuels Storage (36 hectares)

Strategic Fuels Storage

Sold: CCR

Platformer

14
Proven execution of growth with projects delivered safely, on budget, and on time

20222023202420252026+

Nov-22: Additional Storage

May-24: Transmix Storage

Nov-21: 100 million litres Private Storage

Nov-24: Bitumen import terminal

Remains on track to be completed

in Q4 2026

Aug-24: Z Energy Jet Fuel Storage

Completed six months ahead of

schedule, July 2026

Oct-23: Additional Storage

Aug-25: Additional Storage Extension

Conversion Project

$220 million conversion project continues to be

delivered safely, on-time and to-budget

Measured growth step-out

First measured growth step-out with strategic

acquisition of 25% of Somerton pipeline to

Melbourne Airport in November 2025

Completed

In-Progress

New projects

Six growth projects signed over the past three years

delivering an additional ~$335 million (before PPI

indexation) in incremental revenue over 15 years

2021

Apr-26: Government Diesel Storage

93 million litres of additional diesel

storage at Marsden Point (30%

increase in in-service storage

volume)

Acquisition

Aug-26: bp Storage

New contract for significant

jet and diesel storage

15
Marsden Point Energy Precinct delivery

Z Energy Jet Storage

(announced 23 August 2024)

Boosting resilience in NZ’s jet fuel

supply chain

Significant jet storage contract

delivering ~$55 million (pre-PPI) over 10

years

Delivered in early July 2026, six months

ahead of the original schedule and

within budget

Supporting New Zealand’s energy

security

93 million litres diesel storage contract

to the Government until 31 December

2027 providing ~9 additional days of

New Zealand diesel demand storage

Delivered in June 2026. A unique,

accelerated solution identified in 3

weeks and delivered 9 weeks later

NZ Government Storage

(announced 20 April 2026)

Bitumen Import Terminal

(announced 25 November 2024)

Enhancing New Zealand’s bitumen

supply chain

Higgins has expanded the scope and

capabilities of bitumen facility

increasing total revenue from the

contract to $57 million (pre-PPI) over

15 years (from $45 million)

Delivery on track for late Q4 2026

Boosting resilience in New Zealand’s

jet and diesel fuel supply chain

Significant additional jet and diesel

storage contract delivering ~$130

million (pre-PPI) over 15 years,

commencing Q3 2028

Work commenced September 2026

bp Jet and Diesel Storage

(announced 28 August 2026)

16
Future Energy Precinct Opportunities

Brownfields Storage

350+ million litres of storage capacity

available for repurposing

Scoping study completed into the

feasibility of conversion of existing

tanks and construction of new tanks,

reflecting increasing opportunity for

strategic storage

45 hectares available for new tank

construction

Utilising existing resource consents,

jetties and pipeline infrastructure to

facilitate condensed delivery timelines.

500-700 million litres of additional

greenfields storage capacity could be

accommodated on Channel’s site

Greenfields storageSAF/Biofuels

Several additional parties evaluating

Marsden Point for SAF and biofuels

manufacture

In addition to the Marsden Point

Biorefinery Project, Channel has

entered into an MoU with LanzaJet

who are in the early stages of

exploring the development of an

alcohol-to-jet facility

Up to 72MW of fast start peaking

capacity which benefits from fuel

reserves on site

Industry determining the impact of the

New Zealand Government LNG project

and winter energy reliability

obligations

Electricity Peaking Project

17
Viva Geelong

Refinery

Viva Newport

Terminal

Mobil Altona

Terminal

Mobil Yarraville

Terminal

Proven operator ExxonMobil

JV Owners:

•Channel Infrastructure 25%

•ExxonMobil 37.5%

•Viva Energy 18.75%

•bp 18.75%

~10km pipeline from Somerton

Depot to Melbourne Airport JUHI

Capacity of 4.4 million litres / day

Melbourne AirportSomerton DepotSomerton Pipeline JVTullamarine Pipeline

Other Terminals

Trucking

~34km pipeline from terminals and

refineries to Somerton Depot

Capacity of 16.3 million litres / day

Owners:

•ExxonMobil 50%

•Viva Energy 25%

•bp 25%

Owners:

•ExxonMobil 50%

•Viva Energy 25%

•bp 25%

2025 Metrics

1

•>2,600 million litres jet fuel

demand

•239k aircraft movements

•37 million passengers

Australia’s second busiest

airport

1. 12 months to December 2025

Channel 25% ownership

Channel has a Strategic Position in Melbourne’s Jet Fuel Supply Chain

18
Appendix

19
0

5

10

15

20

25

30

35

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

5,000

Dec 17Dec 18Dec 19Dec 20Dec 21Dec 22Dec 23Dec 24Dec 25Sept 26

DieselPetrolHybridEV

-

20

40

60

80

100

120

140

160

-

1,000

2,000

3,000

4,000

5,000

6,000

Aug-19

Dec-19

Apr-20

Aug-20

Dec-20

Apr-21

Aug-21

Dec-21

Apr-22

Aug-22

Dec-22

Apr-23

Aug-23

Dec-23

Apr-24

Aug-24

Dec-24

Apr-25

Aug-25

Dec-25

Apr-26

Aug-26

Auckland Airport - International FlightsChannel Jet Throughput (ML)

Drivers of demand

1.Source: Auckland Airport Monthly Traffic Update

2.Source: Ministry for Cities, Environment, Regions & Transport

Auckland Airport International Flight Movements

1

New Zealand Light Vehicle Fleet

2

EV new registrations

(RHS)

20
65%

28%

18%

13%

Contracted Revenue Agreements

CONTRACT

DATE

ANNOUNCED

PROGRESS FINANCIAL IMPACT

COSTREVENUETERM

Terminal Services

Agreement

22 Nov 2021 Commenced April 2022 $220 million

conversion budget

(~$27 million

remaining to be spent

across H2 2026 and

2027)

Fixed fee of $40 million per annum

(prior to PPI), reducing to $35 million

(prior to PPI) per annum from April

2028

Variable fees per litre of throughput on

the wharf, pipeline, and truck loading

facility

10 years

2x 5 year rights of

renewal

100 million litres

private storage

29 Nov 2021Storage in service in FY23 safely, on

schedule and within budget. Bunds

delivered in Q1 2025, project complete

$50 million ~$9 million per annum (prior to PPI)10 years

commencing, in

tranches, from Q2

2022

2x 5 year rights of

renewal

Additional Storage 17 Nov 2022Completed safely, on schedule and within

budget

$7 million~$25 million over contract term from

2023

5 years

commencing

2023

Additional storage 19 Oct 2023Completed safely, on schedule and within

budget

Minimal~$9 million over 10 years (prior to PPI) 10 years from

2024

Transmix Storage

Contract

1 May 2024Infrastructure upgrades completed in

December 2024 safely, on schedule and

within budget

$12 - 15 million ~$3 million per annum (prior to PPI)7 years from

December 2024

2x 5 year rights of

renewal

Z Energy Storage

Contract

23 Aug 2024Completed July 2026 safely, ahead of

schedule and within budget

$26 – 30 million across

FY24 to FY26

~$55 million over contract term (prior

to PPI)

10 years from July

2026

Bitumen Import

Terminal Contract

25 Nov 2024On schedule to be delivered late Q4 2026$25 – 27 million across

FY25 and FY26

~$57 million over contract term (prior

to PPI)

Opex of $0.2 million per annum

15 years from Q4

2026

2x 5 year rights of

renewal

21
65%

28%

18%

13%

Contracted Revenue Agreements continued

CONTRACT

DATE

ANNOUNCED

PROGRESS FINANCIAL IMPACT

COSTREVENUETERM

Additional Storage

extension

26 Aug 2025Project is in progress and scheduled to be

delivered in Q1 2028

$20-26 million across

FY26 to FY30

~$50 million over contract term from

2028

9 years

commencing Q1

2028

93 million litres

Government diesel

2 April 2026Completed June 2026Included in growth

capex

$1.2 million per month with the final

month of the contract at no charge in

the event tanks are de-heeled

19 months

commencing

June 2026

bp Storage

Contract

28 August

2026

Project is in progress and scheduled to be

delivered in Q3 2028

$65-70 million across

FY26 to FY28

~$130 million over contract term (prior

to PPI)

15 years from Q3

2028

22
•This presentation contains forward looking statements concerning the

financial condition, results and operations of Channel Infrastructure NZ

Limited (hereafter referred to as “CHI”).

•Forward looking statements are subject to the risks and uncertainties

associated with the fuels supply environment, including price and foreign

currency fluctuations, regulatory changes, environmental factors,

production results, demand for CHI’s products or services and other

conditions. Forward looking statements are based on management’s

current expectations and assumptions and involve known and unknown

risks and uncertainties that could cause actual results, performance or

events to differ materially from those expressed or implied in these

statements.

•Forward looking statements include among other things, statements

concerning the potential exposure of CHI to market risk and statements

expressing management’s expectations, beliefs, estimates, forecasts,

projections and assumptions. Forward looking statements are identified by

the use of terms and phrases such as “anticipate”, “believe”, “could”,

“estimate”, “expect”, “goals”, “intend”, “may”, “objectives”, “outlook”, “plan”,

“probably”, “project”, “risks”, “seek”, “should”, “target”, “will” and similar terms

and phrases.

•Readers should not place undue reliance on forward looking statements.

Forward looking statements should be read in conjunction with CHI’s

financial statements. This presentation is for information purposes only

and does not constitute legal, financial, tax, financial product advice or

investment advice or a recommendation to acquire CHI’s securities and

has been prepared without taking into account the objectives, financial

situation or needs of individuals. Before making an investment decision,

you should consider the appropriateness of the information having regard

to your own objectives, financial situation and needs and obtain

independent professional advice.

Important Information

•In light of these risks, results could differ materially from those stated,

implied or inferred from the forward-looking statements contained in this

announcement. CHI does not guarantee future performance and past

performance information is for illustrative purposes only. To the maximum

extent permitted by law, the directors of CHI, CHI and any of its related

bodies corporate and affiliates, and their officers, partners, employees,

agents, associates and advisers do not make any representation or

warranty, express or implied, as to accuracy, reliability or completeness of

the information in this presentation, or likelihood of fulfilment of any

forward-looking statement or any event or results expressed or implied in

any forward-looking statement, and disclaim all responsibility and liability

for these forward-looking statements (including, without limitation, liability

for negligence).

•Except as required by law or regulation (including the NZX Listing Rules or

ASX Listing Rules), CHI undertakes no obligation to provide any additional

or updated information whether as a result of new information, future

events or results or otherwise.

•Forward looking figures in this presentation are unaudited and may

include non-GAAP financial measures and information. Not all of the

financial information (including any non-GAAP information) will have been

prepared in accordance with, nor is it intended to comply with: (i) the

financial or other reporting requirements of any regulatory body; or (ii) the

accounting principles generally accepted in New Zealand or any other

jurisdiction, or with IFRS. Some figures may be rounded, and so actual

calculation of the figures may differ from the figures in this presentation.

Non-GAAP financial information does not have a standardised meaning

prescribed by GAAP and therefore may not be comparable to similar

financial information presented by other entities. Non-GAAP financial

information in this presentation is not audited or reviewed.

•Each forward-looking statement speaks only as of the date of this

presentation.

Data sourced from publicly available filings. Our datasets may not be complete. Automated analysis can produce errors. If you believe any data on this page is incorrect, please contact us at hello@nzxplorer.co.nz. For informational purposes only. Not investment advice.