What did Port of Tauranga Limited announce?

Port of Tauranga Limited (NZX: POT) filed “POT Annual Meeting 2026: Chair and Chief Executive's Speech” with NZX on 29 October 2026, as an agm announcement.

When was it filed?
29 October 2026
Where is the original?
NZX announcement
Port of Tauranga Limited logo

POT Annual Meeting 2026: Chair and Chief Executive's Speech

AGM29 October 2026POTIndustrials

Port of Tauranga Limited Annual Meeting 2026
Thursday 29 October 2026, 1pm

Chair – Julia Hoare

I’m very pleased to be reporting on a record underlying profit for the 2026 financial year,

driven by successful yield, cost and productivity initiatives.

Despite lower cargo volumes, underlying Group Net Profit After Tax increased 23% to

$155.3 million.

Revenue increased 4.7% to $486.5 million, while operating costs decreased 6.2% to

$221.7 million.

Our subsidiary and joint venture companies also performed well, with their contribution

increasing 42.1% to $15.5 million.

These are outstanding results, particularly given the challenging economic conditions

and ongoing capacity constraints that we have faced.

Total trade volumes decreased 3% to 24.6 million tonnes, mainly due to reduced log and

coal volumes, while container volumes remained resilient at just over 1.2 million TEUs.

Leonard will go into more detail on cargo categories shortly.

The strength of the business enabled the Board to declare a final dividend of 12.5 cents

per share, bringing the total ordinary dividend for the year to 20.5 cents per share.

That was a 22.8% increase on the previous year, and approximately $139 million in

dividends to shareholders for the 2026 financial year. This represented a payout of 90%

of underlying earnings for the year.

We are pleased to deliver this increased return to shareholders, while continuing to

invest in the long-term capacity and resilience of the business.

One of the most important developments of the year was the significant progress made

towards securing resource consents for our Stella Passage development. This project

involves extending the Sulphur Point container berth by 385 metres, in two stages, and

the Mount Maunganui wharves by 315 metres. It will be achieved by converting existing
cargo storage land, within our current footprint.

As you have heard from us for several years now, this development is urgently needed.

Our container terminal is essentially at capacity, and we have a queue of shipping lines

wanting to increase their business or introduce new services through Tauranga.

To recap our journey so far, very briefly – we started formal consultation back in 2019

and in December 2024, we secured Environment Court approval of the first stage of the

development. The decision was immediately appealed, so we opted into the fast-track

process.

Unfortunately, due to an error in the legislation, not of our making, our first attempt

under the Fast-track Approvals Act was successfully challenged in the High Court.

After the legislation was fixed, we made a fresh application in January this year and a

three-day cultural effects hearing was held at Whareroa Marae in July.

On 7 September, the fast-track expert panel issued a decision approving the

development, subject to a number of conditions.

After such a long process, this is a significant milestone.

The decision is now subject to three appeals by iwi and two judicial review applications

by hapū. We expect these to be heard in a single hearing, and we hope to confirm an

urgent hearing date any day now.

The Stella Passage development is vital for our customers, and both the regional and

national economies.

Additional berth capacity will enable greater competition and better productivity, helping

to reduce supply chain costs for New Zealand’s importers, exporters and, ultimately,

consumers.

It will also unlock important decarbonisation opportunities, by allowing us to introduce

electric automated stacking cranes at the terminal, and by facilitating more visits from

larger vessels, which are more carbon-efficient.

The Environment Court and the fast-track panel agreed that the development’s impact

on the environment, according to Western science, will be minor in the short-term and

negligible in the long-term.

We remain committed to working with iwi and hapū regarding the cultural concerns
around the development, with ongoing consultation embedded in the resource consent

conditions.

Importantly, we have not stood still while the Stella Passage consenting process has

continued.

The second stage of our capital dredging programme is under way, with completion due

around mid-2027.

We are also progressing preparations to introduce automated stacking cranes, or ASCs,

into the container terminal alongside construction of the new berth.

We have completed the emulation phase, where processes are tested virtually, and are

now refining processes and system design, ensuring operational readiness and finalising

contracts with our preferred vendor.

The first stage will involve two blocks of nine electric ASCs, which will coincide with the

completion of the new container berth.

In August, we took delivery of another six hybrid straddle carriers, as well as New

Zealand’s first fully electric straddle carrier.

We are also building New Zealand’s first hybrid tug boat, expected to be delivered in mid-

2027 from Turkey.

These investments will all improve efficiency while reducing greenhouse gas emissions.

We firmly believe that growth, productivity and environmental performance can, and

must, progress together.

Wearing my other hat as Chair of Northport Group, we are very pleased with the

granting of resource consent for its planned expansion, which includes nearly 12

hectares of reclamation, a 250-metre wharf extension and associated capital dredging.

The expansion will give Northport and the Northland economy the opportunity to play a

larger role in an increasingly integrated Upper North Island supply chain.

The timing of the development will depend on freight demand and progress on the

proposed rail link to Marsden Point.

Turning to governance, I would like to thank my fellow Directors for their diligence and

commitment over the past year. During the year, we farewelled Doug Leeder with our

sincere gratitude for his many years of service and welcomed Ken Shirley as a Quayside-
appointed Director. He stands for election at today’s meeting.

Our Future Director, Scott Campbell, concluded his appointment on 31 March and we

thank him for his contribution.

Fraser Whineray is also standing for re-election today, and you will hear from both him

and Ken when it comes to the meeting resolutions.

Before I hand over to Leonard, I’d like to thank him, the senior management team and all

our Port people for their efforts over the past year. The improvements in productivity

and customer service, the ongoing investment in capacity, and progress in improving

environmental outcomes give us great confidence in Port of Tauranga’s future.

Ngā mihi nui.

---

Port of Tauranga Limited Annual Meeting 2026
Thursday 29 October 2026, 1pm

Chief Executive – Leonard Sampson

Thank you Julia and kia ora koutou.

The 2026 financial year was indeed a very successful one for Port of Tauranga.

I’d like to start with a particular highlight of improving service delivery to our customers,

which has been a major focus.

Our average net crane rate increased 9.9% to 30.8 moves per hour, along with our ship

rate (or berth rate as it’s also known) increasing 13% to 76.4 container moves per hour,

up from 67.2 the previous year.

This was helped by an improvement in schedule reliability, with the proportion of

container ships arriving on time increasing to 71% from 62% in the previous year.

Our team also introduced new emulation technology in the container terminal which has

helped with better planning to improve straddle efficiency and reduce unnecessary

container rehandling.

We will continue to focus on service delivery and productivity, particularly as our lack of

spare berth capacity makes it challenging to recover from supply chain and schedule

disruptions.

The Port of Tauranga Stella Passage development remains critical to providing the

resilience the New Zealand supply chain so desperately needs.

Improving productivity, however, will never be at the expense of safety.

We encourage honest and full reporting of all incidents and concerns, supported by

regular inspections, audits, observations and verifications.

Our Total Recordable Injury Frequency Rate for combined Port of Tauranga staff and

contractors increased from 16 to 19.5 per million hours worked.

While we are not satisfied with that increase, over 95% of these relate to soft tissue
sprain and strain type injuries and there are some encouraging underlying indicators in

the data.

Our days lost per lost-time injury decreased 55%, along with our injury severity rate also

decreasing 49%.

Our focus remains on continuous improvement, learning from all incidents and

strengthening our critical controls.

I will now take a closer look at some of the cargo trends over the past year.

Total trade volumes were down 3% to 24.6 million tonnes. The biggest impact was from

lower log and coal volumes, resulting in export volumes decreasing 3.3% to 15.9 million

tonnes and imports decreasing 2.3% to 8.7 million tonnes.

Log exports decreased 8.1% to 5.8 million tonnes, affected by higher fuel prices that

prompted some exporters to reduce harvesting in the second half of the financial year.

Coal imports decreased 64.8% as stockpiles at Huntly Power Station stabilised, and South

Island hydro generation was sufficient to avoid coal-fired generation over winter.

Cargo volumes increased for dairy, up 3.9%, with kiwifruit growing 8.5% to a record

volume of 754,000 tonnes, with growth expected to continue.

Together, the strong dairy and kiwifruit volumes contributed to another record year for

refrigerated export containers.

Container volumes overall remained resilient, increasing just under half a percent to 1.21

million TEUs.

We had 79 cruise ship visits for the year and are expecting about the same number this

coming season. The first of which arrived on 13 October.

Air and stormwater quality remain a major focus.

Whilst we continue to meet all the conditions in our stormwater resource consents, we

take a continuous improvement approach to our environmental performance.

To that end, in April we opened a new stormwater treatment facility at our Mount

Maunganui wharves. The new system captures the “first flush” of a heavy rain event and

can hold up to one million litres for treatment before it is released.

As Julia mentioned, we are excited to be in possession of New Zealand’s first fully electric
straddle carrier, which we will be trialling over the next year.

It will give us the opportunity to test performance and charging infrastructure within our

unique operating environment.

The $3.5 million trial is being supported by the energy efficiency and conservation

authority (EECA), and if successful, we will be able to introduce additional electric

straddles to our fleet.

In the meantime, our six new hybrid straddles will bring our total hybrid fleet to 13,

representing a quarter of our total straddle fleet.

In another New Zealand first, our new hybrid tug is under construction in Turkey and due

for delivery mid-2027. The 32-metre rotortug will have at least 80 tonnes of bollard pull,

compared to the 50-tonne tug it is replacing.

This will give us greater capability for the larger vessels we expect to see in future.

The current capital dredging is also in preparation for larger vessels and will allow the

largest of the ships already calling here to transit at both low and high tide. This should

give us some more flexibility while we wait for the much-needed capacity provided by

the Stella Passage expansion.

We are deepening the shipping channel to allow for vessels of up to 15.5 metres in

draught.

Our investments to accommodate bigger ships are important for New Zealand’s

decarbonisation efforts. Larger ships are more efficient and produce fewer greenhouse

gas emissions per container.

We made good progress in reducing our own greenhouse gas emissions over the past

year, with overall Scope 1 and 2 emissions decreasing by 12% and emissions intensity

per cargo tonne reducing by 9%.

Before I finish, I will give you a quick update on trade in the first quarter of the 2027

financial year.

Total trade volumes for the three months ended 30 September were 6.25 million tonnes,

down 4.8% and reflecting the continued impact of elevated fuel costs on the export log

market.

Container volumes were 311,000 TEUs, down 2.6% on the previous year.

Based on the first quarter’s cargo volumes, and notwithstanding any significant changes
to trading conditions or events beyond our control, we expect full-year underlying Group

Net Profit After Tax to be in the range of $160 million to $175 million.

There are a number of uncertainties, including the ongoing conflict in the Middle East,

the impact of high fuel prices, particularly on log exports, as well as broader trade policy

settings.

Frustratingly, we also remain capacity-constrained at the container terminal until the

Stella Passage development can be completed.

We do, however, remain confident in our future, thanks to our operational strength,

quality infrastructure, diversity of cargo and revenue streams, as well as strong customer

relationships and a clear strategy for growth.

None of our achievements over the past year would be possible without the dedication

and effort of our people. I would like to thank the team for their hard work and

commitment throughout the year.

Thank you also to our customers, business partners and service providers for your

continued support, as well as to the communities we serve in the Bay of Plenty and

beyond.

Finally, I would like to acknowledge the continued trust and support from our

shareholders. Thank you for joining us today in person and online.

Together, we continue to connect New Zealand and the world.

Ngā mihi nui ki a koutou katoa.

Thank you.

---

Port of Tauranga provides first-quarter trading update
and earnings guidance

Port of Tauranga Limited (NZX:POT) today provided an update on trading for

the first three months of the 2027 financial year and confirmed its full-year

earnings guidance.

In the three months ended 30 September 2026, total trade volumes were

6.25 million tonnes, down 4.8% compared with the same period last year.

Much of the decrease is due to a drop in log export volumes as the forestry

industry is impacted by high fuel prices.

Container volumes were 311,000 TEUs

1

, down 2.6%.

Port of Tauranga Chief Executive Leonard Sampson told the company’s

Annual Meeting of Shareholders today that the Port continued to operate in

uncertain trading conditions and remained constrained by a lack of spare

berth capacity at the container terminal.

“Despite the lower overall trade volumes, we remain confident in Port of

Tauranga’s future prospects, supported by our operational strength, quality

infrastructure, diverse revenue streams, strong customer relationships and

clear strategy,” he said.

Based on first-quarter cargo volumes, and notwithstanding any significant

changes to trading conditions or events beyond the company’s control, Port

of Tauranga expects full-year underlying Group Net Profit After Tax

2

to be in

the range of $160 million to $175 million.

For more information, please contact:

Rochelle Lockley

GM Communications

021 865 884

Email rochelle.lockley@port-tauranga.co.nz

1

TEUs are twenty-foot equivalent units, the standard measure of shipping containers.

2

Underlying NPAT is a non-GAAP measure and differs from reported NZ IFRS profit. It excludes items considered to be one-off or

unrelated to the company’s core business, such as revaluations, impairments and gains or losses from the sale of major assets.

Media Release

29 OCTOBER 2026

---

Annual
Meeting

29 October 2026

Julia
Hoare

Chair

Board of Directors
Julia

Hoare

Chair

Independent Director

Alison

Andrew

Independent

Director

Dean

Bracewell

Independent

Director

Sir Robert

McLeodKNZM

Independent

Director

Brodie

Stevens

Independent

Director

Fraser Whineray

Director

Ken Shirley

Director

Senior management team
Leonard

Sampson

Chief Executive

Simon

Kebbell

Chief Financial

Officer

Blair

Hamill

GM Commercial

Rochelle

Lockley

GM

Communications

Pat

Kirk

GM Health and

Safety

Dan

Kneebone

GM Property and

Infrastructure

For the year ended 30 June 2026
Record underlying profit

$155.3m

Underlying Group Net Profit

After Tax, up 23%

$102.3m

FY24

$126.0m

FY25

$155.3m

FY26

For the year ended 30 June 2026
Revenue and operating

costs

$486.5m

Revenue, up 4.7%

$221.7m

Operating costs, down 6.2%

For the year ended 30 June 2026
Subsidiary and joint

ventur

e companies

$15.5m

Contribution to Gr

oup profit, up 42.1%

For the year ended 30 June 2026
Trade volumes

24.6m

Tonnes of total trade, down 3%

1.2m

Containers (TEUs), steady on last year

Total ordinary dividend, cents per share
Dividends

20.5c

Up 22.8%, about $139

million to shareholders

Final dividend 12.5 cents per

share

14.7

FY24

16.7

FY25

20.5

FY26

Within our current footprint
Stella Passage

development

385m

Longer container berth at Sulphur

Point, in two stages

315m

Longer Mount Maunganui wharves

Stella Passage
The consenting journey

2019

Formal

consultation

began

Dec 2024

Environment

Court approved

stage one. The

decision was

appealed

2025

First fast-track

application

challenged in the

High Court

Jan 2026

Fresh application

made

Jul 2026

Cultural effects

hearing at

Whar

eroa Marae

7 Sep 2026

Fast-track panel

approved the

development,

with conditions

For our customers and the economy
Why Stella Passage

matters

More competition and productivity

Terminal currently at capacity

Lower supply chain costs

More efficient for importers, exporters and consumers

Lower emissions

Electric cranes and larger, more efficient ships

Capacity, efficiency and lower emissions
Investing while we wait

Capital dredging

Stage two, done by mid-

2027

Automated cranes

Planning for two blocks of

nine, fully electric

Straddle carriers

Six hybrid and New

Zealand's first electric

Hybrid tug

New Zealand's first, due

mid-2027

Resource consent granted
Northport expansion

12ha

Reclamation

250m

Wharf extension

Timing depends on freight demand and the

proposed rail link to Marsden Point

Curr

ent

Future – now consented

Governance
Board changes

Doug Leeder

Retired, with our thanks

Ken Shirley

Joined the Board, standing for election today

Scott Campbell

Future Director, finished 31 March

Fraser Whineray

Standing for re-election today

Leonard
Sampson

Chief Executive

Productivity
Crane rate

+9.9%

Average container moves

per crane, per hour

30.1

FY24

28.0

FY25

30.8

FY26

Productivity
Ship rate

FY25

67.2

FY26

76.4

Container moves per hour, for each ship (+13.7%)

Productivity
On-time vessel arrivals

FY25

62%

FY26

71%

Container ships arriving on schedule (+9%). With no

spare berth, delays are still hard to recover from

Safety
Encouraging indicators

−55%

Days lost for each lost-time injury

−49%

Injury severity rate

Million tonnes
Total trade

15.9m

Tonnes exported, down 3.3%

8.7m

Tonnes imported, down 2.3%

23.6

FY24

25.3

FY25

24.6

FY26

Cargo trends
Logs down 8.1%

5.8m

Tonnes of log exports

Cargo trends
Kiwifruit and dairy

+8.5%

Kiwifruit, a record

volume

+3.9%

Dairy

Another record year for refrigerated

export containers

Million TEUs (twenty-foot equivalent units)
Container volumes

+0.4%

Just over 1.2 million TEUs,

held back by berth capacity

1.15

FY24

1.21

FY25

1.21

FY26

Cruise season began 13 October
79 cruise ship visits

Opened in April, Mount Maunganui wharves
Stormwater treatment

1m litres

Of heavy-rain "first flush" held for

treatment before release.

A $1.5 million system. We already meet all our

stormwater consent conditions.

A New Zealand first
Electric straddle carrier

trial

$3.5m

Year-long trial, with $447,000 from EECA

Plus six more hybrid straddles added –

a quarter of the fleet is now hybrid.

A Ne
w Zealand first, due mid-2027

Hybrid tug

80t

Bollard pull, up from

50 tonnes

32m

Rotortug

Mor

e capability for the larger ships we expect

in future. Under construction in Türkiye.

Shipping channel depth
Capital dr

edging

Inside the

harbour

14.5m16m

Outside the

harbour

15.8m17.4m

Befor

eAfter

The largest ships already calling can then come and

go at any tide.

Scope 1 and 2
Greenhouse gas

emissions

−12%

Total emissions

−9%

Emissions for each tonne of cargo

Three months to 30 September 2026
First quarter trading

Total trade

6.25m

Tonnes, down 4.8% on last year

Containers

311,000

TEUs, down 2.6% on last year

Year ending 30 June 2027
Earnings guidance

$160m–$175m

Expected underlying Group net profit after tax

Based on first quarter volumes, and subject to any significant change

in trading conditions or events beyond our control.

Thank you
To our people, customers, partners,

communities and shareholders

Integrated Annual Report
2026

To receive and consider the Integrated

Annual Report for the year ended 30 June

2026, including the audit report and

financial statements.

Annual
Meeting

29 October 2026

Ordinary resolution
Resolution 1

Election of Ken Shirley

That Mr Ken Shirley be elected as a Director

of the company.

Ordinary resolution
Resolution 2

Re-election of Fraser

Whineray

That Mr Fraser Whineray, having retired

from office and being eligible for re-election,

be re-elected as a Director of the company.

Ordinary resolution
Resolution 3

Auditor

That the Auditor-General be reappointed as

Auditor of the company pursuant to section 19 of

the Port Companies Act 1988 and that the

Directors are authorised to fix the Auditor's

remuneration for the ensuing year.

Annual
Meeting

29 October 2026

Data sourced from publicly available filings. Our datasets may not be complete. Automated analysis can produce errors. If you believe any data on this page is incorrect, please contact us at hello@nzxplorer.co.nz. For informational purposes only. Not investment advice.

Other issuers discussed similar conditions around this time

Matched by meaning across NZX announcement text, not keywords — based on our semantic index of announcement bodies.