What did Santana Minerals Ltd announce?
Santana Minerals Ltd (NZX: SMI) filed “Noosa Mining Conference Presentation” with NZX on 11 November 2026, as an operational update announcement.
- Which company?
- Santana Minerals Ltd (NZX: SMI)
- When was it filed?
- 11 November 2026
- Where is the original?
- NZX announcement
Noosa Mining Conference Presentation
ASX / NZX: SMI
NOOSA, QUEENSLAND NOVEMBER 2026
Fast-track Approval
Imminent for NZ’s
Newest Major
Gold Project
Bendigo–Ophir
Gold Project
Disclaimer
Allinformationcontainedinthispresentationisofageneralnature.Potentialinvestorsarecautionedagainst
usingthecontentofthispresentation,inisolation,formakinginvestmentdecisionsandshouldalsoreferto
SantanaMineralsLimited(‘Santana’)AnnualReportsandASX/NZX:SMIreleases.Forfurtherinformationabout
Santanavisitourwebsiteatwww.santanaminerals.com.
Besteffortshavebeenmadetoensuretheaccuracyofinformationcontained(atthetimeofpreparation).Where
forwardtargetsand/orassumptionshavebeenincluded–allsuchinstancesareindicativeonlyandsubjectto
alterationand/orcancellationasandwhenthemanagementofSantanadetermines.
Researchandadviceofaqualifiedfinancialadvisororaccountantarestronglyrecommendedtoanyone
consideringinvestinginlistedcompanysecurities,includingthoseofSantana.
ThePrefeasibilityStudy,includingtheproductiontargetandtheforecastfinancialinformationderivedfromthe
productiontarget,referredtointhisPresentation(PFS)wasreleasedtotheASXon1July2025.ThisPresentation
includessummaryexcerptsfromthePFSanddoesnotpurporttobeall-inclusiveorcomplete.
FORWARD-LOOKING STATEMENTS
ThisPresentationcontainsvariousforwardlookingstatements.Forward-lookingstatementsinthispresentation
include,butarenotlimitedto,statementsregardingtheproductiontarget,financialinformationbasedonthat
productiontargetandstatementswithrespecttoSantana’sfutureplans,strategy,activities,eventsor
developmentstheCompanybelieves,expectsoranticipateswillormayoccur.Bytheirverynature,forward-
lookingstatementsrequireSantanatomakeassumptionsthatmaynotmaterializeorthatmaynotbeaccurate.
TheCompanyhasconcludedthatithasareasonablebasisforprovidingtheseforward-lookingstatements,
includingtheproductiontargetandtheforecastfinancialinformationincludedinthisPresentation.Thedetailed
reasonsfortheseconclusionsareoutlinedthroughouttheASXreleasesdated1July2025.However,no
assurancecanbegiventhattheseexpectationswillprovetohavebeencorrect,asactualresultsandfuture
eventscoulddiffermateriallyfromthoseanticipatedintheforward-lookingstatements.Accordingly,viewersare
cautionednottoplaceunduerelianceonforward-lookingstatements.Santanadoesnotundertaketoupdate
publiclyortoreviseanyoftheincludedforward-lookingstatements,exceptasmayberequiredunderapplicable
securitieslaws.
ToachievetherangeofoutcomesanticipatedinthePFS,thePFSestimatesthatfinancingintheorderofA$277
millionwillberequired.Santanabelievesthattherearereasonablegroundsfortheassumptionsithasmadein
satisfyingitselfthattherequisitefundingforthedevelopmentoftheProjectwillbeavailablewhenrequired.
However,ShareholdersandprospectiveinvestorsshouldbeawarethatthereisnoguaranteeSantanawillbeable
tosecurethisfundingasrequired,anditispossiblethatthetermsavailablemaybedilutiveorotherwise
adverselyimpactthevalueofSantana’scurrentshares.Additionally,Santanamayexplorealternativevalue-
creatingstrategies,suchasdivestingsomeorallpotentialrevenuestreamsfrompreciousmetalsorafullor
partialsaleofitsinterestintheBendigo-Ophirproject.
Of the Mineral Resources planned for extraction under the PFS production model approximately 93% is
within the IndicatedResources category, with the balance (7%) being classified within the Inferred
Resources category. There is a low level of geological confidence associated with Inferred Mineral
Resources and there is no certainty that further exploration work will result in the determination of
Indicated Mineral Resources or that the production target itself will be realised.
CAUTIONARY STATEMENT —INFERRED RESOURCESIncluded in Production Target
COMPETENT PERSONS STATEMENT
Theproductiontargetandtheforecastfinancialinformationderivedfromtheproductiontargetsetoutin
thispresentationwerefirstcontainedinapublicannouncementreleasedtotheASXon1July2025.The
Companyconfirmsthatallmaterialassumptionsunderpinningtheproductiontargetandtheforecast
financialinformationderivedfromitcontinuetoapplyandhavenotmateriallychanged.
TheinformationinthisreportthatrelatestoMineralResourcesisbasedoninformationcontainedinthe
followingpublicannouncements:
4March2025–ASXAnnouncementtitled“RASMineralResourceEstimateReview”
15November2024–ASXAnnouncementtitled“Bendigo-OphirPre-FeasibilityStudy”
28September2021–ASXAnnouncementtitled“Bendigo-OphirGoldResourcesIncreased155%
to643kOz”
TheinformationinthisreportthatrelatestoOreReservesisbasedoninformationcontainedinthe
publicannouncementmadetotheASXon1July2025.
AcopyoftheseannouncementsareavailabletoviewontheSantanaMineralsLimitedwebsite
www.santanaminerals.comorontheASXplatformwww.asx.com.au.
Thereportswereissuedinaccordancewiththe2012EditionoftheJORCAustralasianCodefor
ReportingofExplorationResults,MineralResourcesandOreReserves.TheCompanyconfirmsthatitis
notawareofanynewinformationordatathatmateriallyaffectstheinformationincludedintheoriginal
marketannouncementsreferencedaboveand,inthecaseoftheMineralResourceestimates,thatall
materialassumptionsandtechnicalparametersunderpinningtheMineralResourceestimatesinthe
relevantannouncementscontinuetoapplyandhavenotmateriallychanged.TheCompanyconfirms
thattheformandcontextinwhichtheCompetentPerson’sfindingsarepresentedhavenotbeen
materiallymodifiedfromtheoriginalmarketannouncements.
New day dawning in NZ
A substantial gold discovery Reserve of 1.2 M oz @ 2.6g/t Gold
*
Located on freehold, private land -Overseas Investment
consent granted May 2026
Emerging high-margin gold producer. All-in-cost
A$2,200/oz
Draft FTA decision week of 30 Nov 2026
Final decision 20 Jan 2027
First gold 2028
Loads of exploration upside.
Well funded and project finance advanced
Substantial re-rate potential
* Refer Appendix 1
3
Location –naturally blessed
Hydro electric
power -440MW
Cromwell -pop.
8,000
International
airport –1 hour
RAS
Fresh water -6km
66kV substation -8km
State Highway 8 –
7km
4
PATH TO APPROVAL AND PRODUCTION
Advanced permitting process & runway to first gold
First gold 2028
OCT 25
Substantive
application
lodged
FEB ‘26
Expert
Panel
Appointed
APR ‘26
s53 Response
filed
27 AUG '26
RFI 11
Response due
20 JAN ‘27
Final FTA Decision
Final Investment
Decision
JUN ‘26
Expert
Hearings
Concluded
NOV 2026
Draft decision
26 JUN ‘26
Application
paused for
workshops and
RFI 11
17 AUG ‘26
Processing of
Application
resumes
FEB 2027
Management
Plans Certified
MAR ‘27
Earthworks
commence
JUL ‘27
Bulk pre-strip
commences
5
NZ GOVT TAX+ROYALTY
A$125 M
per year
PERMITTING SPEND
A$16 M
to date
Fast-track Approval process
2,219 ha of land under covenant for conservation post-mining
89 ha of predator-proof eco-sanctuaries
Post-mining active and passive water treatment then decommissioning
Interactive new historic mining features with public walking and riding trails
4WD access to start of trails
Intergenerational funding to maintain all of the above
448 calendar days from submission to final decision
9,426 page application + 11 sets of proposed conditions
1 iwi hearing at Ōtākou Marae
2 public hearings and 55 submitters
9 expert hearings
Dozens of expert workshops
749 conditions over 530 pages
APPROVED
CONSTRUCT
ON TIME AND ON BUDGET
COMPLIANT
OPERATE
DELIVERING VALUE
PLANNED
CLOSE
MEETING OBLIGATIONS
SUSTAINABLE
POST CLOSURE
FUTURE GENERATIONS
6
A blind discovery
110,000m+ of Diamond Drilling
2.3 km down-plunge and open
Up to 450m wide
High-grade core
(150-200m wide, 30-40m thick)
Bulk barren waste pre-strip
The Rise & Shine (RAS)
7
RAS
LG1
HG1
AA’
OPEN
B
B’
8
5
Battery Hill
Rise & Shine Valley
Shepherds Creek
Thomson Gorge
Fault/Unconformity
TZ4 Schist
TZ3 Schist
View –Looking South East
A
RDGOUR
S
TATION
B
ENDIGO
S
TATION
9
Freehold land –sheep stations
Corporate Snapshot
technical & financial capacity
NET CASH AT
BANK
~A$175m
BOARD & MANAGEMENT
Proven leadership across finance, legal & operations.
Peter Cook
NON-EXEC CHAIR
Geologist, Mineral Economist
Damian Spring
CEO & EXEC DIRECTOR
Mining Engineer, project delivery
Emma Scotney
NON-EXEC DIRECTOR
Lawyer, experienced director
Sam Smith
CDO & EXEC DIRECTOR
Mining Engineer, IR
Craig McPherson
CFO & CO-SEC
Finance, compliance
LIQUIDITY
2.6 m
shares
per day
990m FPO shares @ A$0.495
1.2m Options & Incentives
MARKET CAPITALISATION
~A$490 m
ENTERPRISE VALUE
~A$315m
10
March 2026
GDXJ300
September 2026
Ounce Profile at 1.2Mtpa
-
20
40
60
80
100
120
140
Year
1
Year
2
Year
3
Year
4
Year
5
Year
6
Year
7
Year
8
Year
9
Year
10
Year
11
Year
12
Year
13
Year
14
Production (kOz)
Open PitUnderground
CAPEX
A$277
million
BASE CASE
A$3,500/oz
11
Study basis for open pit then underground to feed
1.2 Mtpa plant
A$94m
17.5Mt pre-strip and establishment
A$119m
Process plant and TSF
A$64m
Infrastructure
Initial Mine Plan
NPV AFTER TAX
A$770 M
6.5% DISCOUNT RATE
SPOT GOLD
A$6,000/oz
NPV AFTER TAX
A$2,100 M
6.5% DISCOUNT RATE
AVERAGE ANNUAL
EBITDA
A$369 M
EV:EBITDA
~0.9x
Early mine development works
Paul Miles
GENERAL MANAGER
MiningEngineer
Cheryl Low
ENVIRONMENT MANAGER
Environment Scientist
Paul Matheson
MINING MANAGER
Mine Ops Specialist
David Thurstun
TECHNICAL SERVICES
Mining Engineer
Alex Nichol
GEOLOGY MANAGER
Mine Geologist
Dave Stretch
PROJECT MANAGER
Mining Engineer
Katie Barns
PROCESS DESIGN
Metallurgist
12
Mining fleet rolling off the production
line
New exploration base
New access road
Fresh water bore field and 5km of
pipeline
11kV power line
•Converting +1400 expressions of interest
for work into job offers
Vicki Blakeborough
PEOPLE & CULTURE
HR Specialist
30kmof strike
Strong soil anomalies at DNS
and ORK
Emerging new targets coming
from mapping and soil
sampling
New Prospecting Permit
61533 granted
426 km
2
under-explored
Explorationupside
13
OutstandingInvestment Opportunity
SCALE ESTABLISHED
Major NZ Gold Discovery
DECISION JAN 2027
Approval Pathway Set
LOW-COST LONG-LIFE
Up to 120koz p.a.
NEAR TERM BUILD
First Gold 2028
AFTER-TAX, 6.5% DISCOUNT RATE, A$6,000/oz
A$2.1 billion NPV
SIGNIFICANT UPSIDE
Set for a strong market re-rate
AI generated from design
14
09
CONTACT
CEO Damian Spring
dspring@santanaminerals.com
Telephone 0800 726 333
community@santanaminerals.com
NZX:ASX SMI
Santanaminerals.com
linkedin.com/company/santana-minerals-ltd
15
Mineral ResourcesOre Reserves
The information in this report that relates to this March 2025 RAS Mineral Resource Estimates (MRE) and to the November 2024 SRX
and SRE MRE, is based on work completed by Mr Kerrin Allwood, a Competent Person (CP) who is a Member of The Australasian
Institute of Mining and Metallurgy (AusIMM). Mr Allwood is a Principal Geologist of GeoModelling Limited, Petone, New Zealand and
has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity
which is being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves”. Mr Allwood consents to the inclusion in this report of the matters based on
his information in the form and context in which it appears. Mr Allwood and GeoModelling Limited are independent of Santana Minerals
Ltd.
The information in this report that relates to prior 2021 Mineral Resource Estimates (2021 MRE) for CIT deposit completed by Ms
Michelle Wild (CP) (ASX announcement on 28 September 2021) continue to apply and have not materially changed.
Note 1: RAS Open pit cut-off grade 0.5g/t at $US2,000/oz Au price
Note 2: RAS Underground cut-off grade 1.7g/t at $US1,650/oz Au price
Note 3: SRX Open pit cut-off grade 0.30 g/t at $US2,100/oz Au price
Note 4: Underground Reserves are from the quoted Open pit Resources area
Note 5: The effective date of the Mineral Reserve is 30 June 2025, estimated under the supervision of Damian Spring (FAusIMM).
Note 6: Approved consents and required permits are yet to be granted to enable mining of the RAS and SRX deposits.
Please see full PFS Summary and Reserve estimate modifying factors in the disclosures announced to ASX on 1 July 2025
16
MtAu g/t
koz
Total
275
Appendix 1 - Gold in the ground
Data sourced from publicly available filings. Our datasets may not be complete. Automated analysis can produce errors. If you believe any data on this page is incorrect, please contact us at hello@nzxplorer.co.nz. For informational purposes only. Not investment advice.
Other issuers discussed similar conditions around this time
Matched by meaning across NZX announcement text, not keywords — based on our semantic index of announcement bodies.
- MEX — Minerals Exploration Limited: Investor Presentation - Resource Rising Stars2026-10-13
“Minerals Exploration Limited ASX:MEX | NZX:MEX South Island Gold/Tungsten Portfolio 13 •Invincible: historic high-grade gold mine; newly identified scheelite mineralisation •Glenorchy: proven tungsten-gold field with multiple historic lodes, channel samples and historical dr…”
- MEX — Minerals Exploration Limited: Quarterly Activities and Cashflow Report2026-10-16
“Page 10 of 12 mineralsexploration.com.au About Minerals Exploration Ltd – NZ Gold Focused Explorer Minerals Exploration Limited (ASX/NZX: MEX) is implementing an aggressive brownfields exploration strategy at its portfolio of New Zealand gold assets. These ass…”