What did Santana Minerals Ltd announce?

Santana Minerals Ltd (NZX: SMI) filed “Noosa Mining Conference Presentation” with NZX on 11 November 2026, as an operational update announcement.

When was it filed?
11 November 2026
Where is the original?
NZX announcement
Santana Minerals Ltd logo

Noosa Mining Conference Presentation

Operational Update11 November 2026SMIMaterials

ASX / NZX: SMI
NOOSA, QUEENSLAND NOVEMBER 2026

Fast-track Approval

Imminent for NZ’s

Newest Major

Gold Project

Bendigo–Ophir

Gold Project

Disclaimer
Allinformationcontainedinthispresentationisofageneralnature.Potentialinvestorsarecautionedagainst

usingthecontentofthispresentation,inisolation,formakinginvestmentdecisionsandshouldalsoreferto

SantanaMineralsLimited(‘Santana’)AnnualReportsandASX/NZX:SMIreleases.Forfurtherinformationabout

Santanavisitourwebsiteatwww.santanaminerals.com.

Besteffortshavebeenmadetoensuretheaccuracyofinformationcontained(atthetimeofpreparation).Where

forwardtargetsand/orassumptionshavebeenincluded–allsuchinstancesareindicativeonlyandsubjectto

alterationand/orcancellationasandwhenthemanagementofSantanadetermines.

Researchandadviceofaqualifiedfinancialadvisororaccountantarestronglyrecommendedtoanyone

consideringinvestinginlistedcompanysecurities,includingthoseofSantana.

ThePrefeasibilityStudy,includingtheproductiontargetandtheforecastfinancialinformationderivedfromthe

productiontarget,referredtointhisPresentation(PFS)wasreleasedtotheASXon1July2025.ThisPresentation

includessummaryexcerptsfromthePFSanddoesnotpurporttobeall-inclusiveorcomplete.

FORWARD-LOOKING STATEMENTS

ThisPresentationcontainsvariousforwardlookingstatements.Forward-lookingstatementsinthispresentation

include,butarenotlimitedto,statementsregardingtheproductiontarget,financialinformationbasedonthat

productiontargetandstatementswithrespecttoSantana’sfutureplans,strategy,activities,eventsor

developmentstheCompanybelieves,expectsoranticipateswillormayoccur.Bytheirverynature,forward-

lookingstatementsrequireSantanatomakeassumptionsthatmaynotmaterializeorthatmaynotbeaccurate.

TheCompanyhasconcludedthatithasareasonablebasisforprovidingtheseforward-lookingstatements,

includingtheproductiontargetandtheforecastfinancialinformationincludedinthisPresentation.Thedetailed

reasonsfortheseconclusionsareoutlinedthroughouttheASXreleasesdated1July2025.However,no

assurancecanbegiventhattheseexpectationswillprovetohavebeencorrect,asactualresultsandfuture

eventscoulddiffermateriallyfromthoseanticipatedintheforward-lookingstatements.Accordingly,viewersare

cautionednottoplaceunduerelianceonforward-lookingstatements.Santanadoesnotundertaketoupdate

publiclyortoreviseanyoftheincludedforward-lookingstatements,exceptasmayberequiredunderapplicable

securitieslaws.

ToachievetherangeofoutcomesanticipatedinthePFS,thePFSestimatesthatfinancingintheorderofA$277

millionwillberequired.Santanabelievesthattherearereasonablegroundsfortheassumptionsithasmadein

satisfyingitselfthattherequisitefundingforthedevelopmentoftheProjectwillbeavailablewhenrequired.

However,ShareholdersandprospectiveinvestorsshouldbeawarethatthereisnoguaranteeSantanawillbeable

tosecurethisfundingasrequired,anditispossiblethatthetermsavailablemaybedilutiveorotherwise

adverselyimpactthevalueofSantana’scurrentshares.Additionally,Santanamayexplorealternativevalue-

creatingstrategies,suchasdivestingsomeorallpotentialrevenuestreamsfrompreciousmetalsorafullor

partialsaleofitsinterestintheBendigo-Ophirproject.

Of the Mineral Resources planned for extraction under the PFS production model approximately 93% is

within the IndicatedResources category, with the balance (7%) being classified within the Inferred

Resources category. There is a low level of geological confidence associated with Inferred Mineral

Resources and there is no certainty that further exploration work will result in the determination of

Indicated Mineral Resources or that the production target itself will be realised.

CAUTIONARY STATEMENT —INFERRED RESOURCESIncluded in Production Target

COMPETENT PERSONS STATEMENT

Theproductiontargetandtheforecastfinancialinformationderivedfromtheproductiontargetsetoutin

thispresentationwerefirstcontainedinapublicannouncementreleasedtotheASXon1July2025.The

Companyconfirmsthatallmaterialassumptionsunderpinningtheproductiontargetandtheforecast

financialinformationderivedfromitcontinuetoapplyandhavenotmateriallychanged.

TheinformationinthisreportthatrelatestoMineralResourcesisbasedoninformationcontainedinthe

followingpublicannouncements:

4March2025–ASXAnnouncementtitled“RASMineralResourceEstimateReview”

15November2024–ASXAnnouncementtitled“Bendigo-OphirPre-FeasibilityStudy”

28September2021–ASXAnnouncementtitled“Bendigo-OphirGoldResourcesIncreased155%

to643kOz”

TheinformationinthisreportthatrelatestoOreReservesisbasedoninformationcontainedinthe

publicannouncementmadetotheASXon1July2025.

AcopyoftheseannouncementsareavailabletoviewontheSantanaMineralsLimitedwebsite

www.santanaminerals.comorontheASXplatformwww.asx.com.au.

Thereportswereissuedinaccordancewiththe2012EditionoftheJORCAustralasianCodefor

ReportingofExplorationResults,MineralResourcesandOreReserves.TheCompanyconfirmsthatitis

notawareofanynewinformationordatathatmateriallyaffectstheinformationincludedintheoriginal

marketannouncementsreferencedaboveand,inthecaseoftheMineralResourceestimates,thatall

materialassumptionsandtechnicalparametersunderpinningtheMineralResourceestimatesinthe

relevantannouncementscontinuetoapplyandhavenotmateriallychanged.TheCompanyconfirms

thattheformandcontextinwhichtheCompetentPerson’sfindingsarepresentedhavenotbeen

materiallymodifiedfromtheoriginalmarketannouncements.

New day dawning in NZ
A substantial gold discovery Reserve of 1.2 M oz @ 2.6g/t Gold

*

Located on freehold, private land -Overseas Investment

consent granted May 2026

Emerging high-margin gold producer. All-in-cost

A$2,200/oz

Draft FTA decision week of 30 Nov 2026

Final decision 20 Jan 2027

First gold 2028

Loads of exploration upside.

Well funded and project finance advanced

Substantial re-rate potential

* Refer Appendix 1

3

Location –naturally blessed
Hydro electric

power -440MW

Cromwell -pop.

8,000

International

airport –1 hour

RAS

Fresh water -6km

66kV substation -8km

State Highway 8 –

7km

4

PATH TO APPROVAL AND PRODUCTION
Advanced permitting process & runway to first gold

First gold 2028

OCT 25

Substantive

application

lodged

FEB ‘26

Expert

Panel

Appointed

APR ‘26

s53 Response

filed

27 AUG '26

RFI 11

Response due

20 JAN ‘27

Final FTA Decision

Final Investment

Decision

JUN ‘26

Expert

Hearings

Concluded

NOV 2026

Draft decision

26 JUN ‘26

Application

paused for

workshops and

RFI 11

17 AUG ‘26

Processing of

Application

resumes

FEB 2027

Management

Plans Certified

MAR ‘27

Earthworks

commence

JUL ‘27

Bulk pre-strip

commences

5

NZ GOVT TAX+ROYALTY

A$125 M

per year

PERMITTING SPEND

A$16 M

to date

Fast-track Approval process
2,219 ha of land under covenant for conservation post-mining

89 ha of predator-proof eco-sanctuaries

Post-mining active and passive water treatment then decommissioning

Interactive new historic mining features with public walking and riding trails

4WD access to start of trails

Intergenerational funding to maintain all of the above

448 calendar days from submission to final decision

9,426 page application + 11 sets of proposed conditions

1 iwi hearing at Ōtākou Marae

2 public hearings and 55 submitters

9 expert hearings

Dozens of expert workshops

749 conditions over 530 pages

APPROVED

CONSTRUCT

ON TIME AND ON BUDGET

COMPLIANT

OPERATE

DELIVERING VALUE

PLANNED

CLOSE

MEETING OBLIGATIONS

SUSTAINABLE

POST CLOSURE

FUTURE GENERATIONS

6

A blind discovery
110,000m+ of Diamond Drilling

2.3 km down-plunge and open

Up to 450m wide

High-grade core

(150-200m wide, 30-40m thick)

Bulk barren waste pre-strip

The Rise & Shine (RAS)

7

RAS

LG1

HG1

AA’

OPEN

B

B’

8

5
Battery Hill

Rise & Shine Valley

Shepherds Creek

Thomson Gorge

Fault/Unconformity

TZ4 Schist

TZ3 Schist

View –Looking South East

A

RDGOUR

S

TATION

B

ENDIGO

S

TATION

9

Freehold land –sheep stations

Corporate Snapshot
technical & financial capacity

NET CASH AT

BANK

~A$175m

BOARD & MANAGEMENT

Proven leadership across finance, legal & operations.

Peter Cook

NON-EXEC CHAIR

Geologist, Mineral Economist

Damian Spring

CEO & EXEC DIRECTOR

Mining Engineer, project delivery

Emma Scotney

NON-EXEC DIRECTOR

Lawyer, experienced director

Sam Smith

CDO & EXEC DIRECTOR

Mining Engineer, IR

Craig McPherson

CFO & CO-SEC

Finance, compliance

LIQUIDITY

2.6 m

shares

per day

990m FPO shares @ A$0.495

1.2m Options & Incentives

MARKET CAPITALISATION

~A$490 m

ENTERPRISE VALUE

~A$315m

10

March 2026

GDXJ300

September 2026

Ounce Profile at 1.2Mtpa
-

20

40

60

80

100

120

140

Year

1

Year

2

Year

3

Year

4

Year

5

Year

6

Year

7

Year

8

Year

9

Year

10

Year

11

Year

12

Year

13

Year

14

Production (kOz)

Open PitUnderground

CAPEX

A$277

million

BASE CASE

A$3,500/oz

11

Study basis for open pit then underground to feed

1.2 Mtpa plant

A$94m

17.5Mt pre-strip and establishment

A$119m

Process plant and TSF

A$64m

Infrastructure

Initial Mine Plan

NPV AFTER TAX

A$770 M

6.5% DISCOUNT RATE

SPOT GOLD

A$6,000/oz

NPV AFTER TAX

A$2,100 M

6.5% DISCOUNT RATE

AVERAGE ANNUAL

EBITDA

A$369 M

EV:EBITDA

~0.9x

Early mine development works
Paul Miles

GENERAL MANAGER

MiningEngineer

Cheryl Low

ENVIRONMENT MANAGER

Environment Scientist

Paul Matheson

MINING MANAGER

Mine Ops Specialist

David Thurstun

TECHNICAL SERVICES

Mining Engineer

Alex Nichol

GEOLOGY MANAGER

Mine Geologist

Dave Stretch

PROJECT MANAGER

Mining Engineer

Katie Barns

PROCESS DESIGN

Metallurgist

12

Mining fleet rolling off the production

line

New exploration base

New access road

Fresh water bore field and 5km of

pipeline

11kV power line

•Converting +1400 expressions of interest

for work into job offers

Vicki Blakeborough

PEOPLE & CULTURE

HR Specialist

30kmof strike
Strong soil anomalies at DNS

and ORK

Emerging new targets coming

from mapping and soil

sampling

New Prospecting Permit

61533 granted

426 km

2

under-explored

Explorationupside

13

OutstandingInvestment Opportunity
SCALE ESTABLISHED

Major NZ Gold Discovery

DECISION JAN 2027

Approval Pathway Set

LOW-COST LONG-LIFE

Up to 120koz p.a.

NEAR TERM BUILD

First Gold 2028

AFTER-TAX, 6.5% DISCOUNT RATE, A$6,000/oz

A$2.1 billion NPV

SIGNIFICANT UPSIDE

Set for a strong market re-rate

AI generated from design

14

09
CONTACT

CEO Damian Spring

dspring@santanaminerals.com

Telephone 0800 726 333

community@santanaminerals.com

NZX:ASX SMI

Santanaminerals.com

linkedin.com/company/santana-minerals-ltd

15

Mineral ResourcesOre Reserves
The information in this report that relates to this March 2025 RAS Mineral Resource Estimates (MRE) and to the November 2024 SRX

and SRE MRE, is based on work completed by Mr Kerrin Allwood, a Competent Person (CP) who is a Member of The Australasian

Institute of Mining and Metallurgy (AusIMM). Mr Allwood is a Principal Geologist of GeoModelling Limited, Petone, New Zealand and

has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity

which is being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of

Exploration Results, Mineral Resources and Ore Reserves”. Mr Allwood consents to the inclusion in this report of the matters based on

his information in the form and context in which it appears. Mr Allwood and GeoModelling Limited are independent of Santana Minerals

Ltd.

The information in this report that relates to prior 2021 Mineral Resource Estimates (2021 MRE) for CIT deposit completed by Ms

Michelle Wild (CP) (ASX announcement on 28 September 2021) continue to apply and have not materially changed.

Note 1: RAS Open pit cut-off grade 0.5g/t at $US2,000/oz Au price

Note 2: RAS Underground cut-off grade 1.7g/t at $US1,650/oz Au price

Note 3: SRX Open pit cut-off grade 0.30 g/t at $US2,100/oz Au price

Note 4: Underground Reserves are from the quoted Open pit Resources area

Note 5: The effective date of the Mineral Reserve is 30 June 2025, estimated under the supervision of Damian Spring (FAusIMM).

Note 6: Approved consents and required permits are yet to be granted to enable mining of the RAS and SRX deposits.

Please see full PFS Summary and Reserve estimate modifying factors in the disclosures announced to ASX on 1 July 2025

16

MtAu g/t

koz

Total

275

Appendix 1 - Gold in the ground

Data sourced from publicly available filings. Our datasets may not be complete. Automated analysis can produce errors. If you believe any data on this page is incorrect, please contact us at hello@nzxplorer.co.nz. For informational purposes only. Not investment advice.

Other issuers discussed similar conditions around this time

Matched by meaning across NZX announcement text, not keywords — based on our semantic index of announcement bodies.