What did Taiko Critical Minerals Limited announce?

Taiko Critical Minerals Limited (NZX: TCM) filed “Updated Mineral Resource Estimate” with NZX on 11 October 2026, as an operational update announcement.

From the announcement:“Together with the previously reported MRE’s for Coates South, Canoe Creek and Barrytown Farms blocks, it establishes a resource base at its Barrytown, West Coast Project of 35Mt of which 21% is Total Heavy Mineral (THM).”
When was it filed?
11 October 2026
Where is the original?
NZX announcement
Taiko Critical Minerals Limited logo

Updated Mineral Resource Estimate

Operational Update11 October 2026TCMMaterials

NZX and Media Release
12 October 2026





Barrytown critical minerals project resource base increases to 35 million

tonnes at an exceptional high-grade 21% total heavy mineral.



Taiko Critical Minerals Limited (NZCN: 5824110)

c/o PriceWaterhouseCoopers, Level 26 PwC Tower, 15 Customs Street West,

Auckland Central, Auckland 1010, New Zealand

www.taikocm.co.nz

Tāiko Critical Minerals Limited (NZX: TCM) (Tāiko or the Company) has completed the

Mineral Resource Estimate (MRE) for the Cargill South block.

Together with the previously reported MRE’s for Coates South, Canoe Creek and Barrytown

Farms blocks, it establishes a resource base at its Barrytown, West Coast Project of 35Mt of

which 21% is Total Heavy Mineral (THM).

Key Points

 11,632 metres of drilling completed, and 11,133 samples tested

 JORC Code (2012) Competent Person sign off for,

o 34.1Mt @ 21% Measured & Indicated (M&I) THM for 2.2Mt ilmenite, 3.1Mt

garnet, 48kt zircon

o 0.9Mt @ 23% Inferred THM for 80kt ilmenite, 90kt garnet, 2kt zircon

 More than 5km of mineralised strandline

 This is significant as the M&I Resource underpins the project economic studies

The attached report covers Cargill South, the last of the four blocks to be assessed.

Tāiko already holds resource consents for the Coates South block, a Wet Concentrator Plant

at Barrytown and a Mineral Separation Plant at Rapahoe, which secure its “Mine to Market”

development strategy.

An application for consents to enable Taiko to extend the project, developing Canoe Creek,

Barrytown Farms and the Cargill South blocks is being assessed by the Fast Track expert panel,

with a decision due by 8 December 2026, subject to any delays.

Chief Executive Robert Brand said: “The extensive exploration and testing conducted by

independent experts and reported by a Competent Person in compliance with the JORC Code

(2012) provides Taiko with a high level of confidence on what is in the ground at Barrytown.

That, and the imminent Fast-track decision provides the key foundation for our feasibility

study.”

ENDS

For further information please contact:

Robert Brand

Chief Executive Officer

Mobile: +61 421 388 222

Email: robert.brand@taikocm.co.nz

Website: www.taikocm.co.nz



Page 2 of 3

ABOUT TĀIKO CRITICAL MINERALS

Tāiko is a New Zealand incorporated company preparing to extract, refine and export critical minerals

from privately owned farmland on the West Coast of the South Island of New Zealand, near

Greymouth. The Company has strong mana whenua support, with resource consents through to

implementation.

Tāiko plans to develop and produce ilmenite, zircon, garnet, and other critical minerals. The company’s

“mine to market” strategy involves refining these critical minerals at a planned Mineral Separation

Plant on the West Coast and exporting them to global customers. The Company’s operations are in

start-up phase and are therefore pre-revenue.

BARRYTOWN CRITICAL MINERALS PROJECT

The Company’s core asset is the Barrytown Critical Minerals Project, contained on Mining Permit ML

60785 covering 1250ha of coastal heavy mineral sands located ~30 km north of Greymouth.

Tāiko has been granted resource consents to mine the mineral resource from the Coates South Block

property near Greymouth.

The Company has entered into a conditional Sale and Purchase Agreement with Barrytown Farms

Limited to acquire approximately 304 hectares of farmland on the Barrytown Flats, securing access

rights for the core mining blocks of the project.

The Company has also been granted resource consents to construct and operate a mineral separation

plant at nearby Rapahoe, which will produce high value critical minerals from the mineral resource.

In addition, Tāiko will transport refined minerals via established rail infrastructure to South Island

ports for export to global customers.

MINERAL RESOURCE

Tāiko has reported a JORC Code (2012) compliant Mineral Resource for the Barrytown Critical Minerals

Project comprising 34.1Mt @ 21% Measured & Indicated Total Heavy Mineral and 0.9Mt @ 23%

Inferred Total Heavy Mineral

PROJECT DEVELOPMENT

The Company lodged its substantive application for resource consent under the Fast Track Approvals

Act 2024 on 8 June 2026. The application covers mining of the mineral resource extension of the

Coates South Block contained in the Canoe Creek, Barrytown Farms and Cargill South Blocks.

Tāiko has received strong support from Mana Whenua Te Rūnanga o Ngāti Waewae, whose vital input

is helping to shape the project from resource consents through to implementation.

COMPETENT PERSONS STATEMENT

The Mineral Resource information in this announcement is based on information compiled under the

supervision of Mathijs van de Ven (MAusIMM) and Michael Gazley (MAusIMM, MAIG) of RSC, who are

Competent Persons as defined in the JORC Code (2012). Both have sufficient experience relevant to

this style of mineralisation and consent to the inclusion of this information in the form and context in

which it appears.



Page 3 of 3

MINERAL RESOURCE ESTIMATES

All references to mineral resource estimates should be read in conjunction with the reports listed in

the table below.

Location Title of Document Competent person Report & (NZX

release) date

Barrytown

Farms and

Coates South

Initial Mineral Resource Estimate

for the Barrytown Critical Minerals

Project

Mr Rene Sterk MSc FAusIMM

(CP(Geo) MAIG (RPGeo) MSEG

20 Jan 2026

(pre NZX listing)

Barrytown

Farms and

Coates South

Listing Profile – Taiko Critical

Minerals Limited

Mr Rene Sterk MSc FAusIMM

(CP(Geo) MAIG (RPGeo) MSEG

5 Mar 2026

(NZX: 5 Mar 26)

Canoe Creek Canoe Creek Mineral Resource

Estimate

Mathijs van de Ven (MAusIMM)

Michael Gazley (MAusIMM,

MAIG)

4 May 2026

(NZX: 13 May 26)

Canoe Creek Initial Mineral Resource Estimate

for the Canoe Creek Block at the

Barrytown Critical Minerals Project

Mathijs van de Ven (MAusIMM) 6 May 2026

(NZX: 13 May 26)

Cargill South Initial Mineral Resource Estimate

for the Cargill South Block at the

Barrytown Critical Minerals Project

Mathijs van de Ven (MAusIMM)

Michael Gazley (MAusIMM,

MAIG)

11 Oct 2026

(NZX: 12 Oct 26)

The above reports were prepared by RSC and can be found at www.taikocm.co.nz/mineral-resource-

information.

All disclosures made in this document with reference to mineral resources estimates are quoted as

per those documents. Taiko confirms that it is not aware of any new information or data that will or

may materially affect the information included in this market announcement. In the case of mineral

resource estimates, all material assumptions and technical parameters underpinning the estimates

continue to apply and have not materially changed since the date of the above reports.

FORWARD LOOKING STATEMENTS

This announcement may contain forward-looking statements based on management’s expectations.

Actual results may differ materially from those expressed or implied in such statements.

Forward-looking statements, opinions, and estimates included in this document are based on

assumptions and contingencies which are subject to change without notice. These statements are

provided as a general guide only and should not be relied upon as a guarantee of future performance.

Project development pathways, timelines, production targets, and commercial outcomes are

indicative only and are based on current expectations. Actual timing and outcomes may vary

depending on technical, regulatory, funding, and market conditions. Tāiko does not undertake to

update forward-looking statements except as required by applicable law.

PUBLIC DISCLOSURES

This announcement should be read in conjunction with Taiko’s NZX announcements. It is not intended

to provide a comprehensive overview of all material information relating to the Company and should

not be relied upon as a substitute for those disclosures.


Page 1 of 25



11 OCTOBER 2026


Initial Mineral Resource Estimate for the Cargill South Block

at the Barrytown Critical Minerals Project


Highlights:

 Initial Mineral Resource estimate for the Cargill South Block classified in accordance with

the JORC Code (2012).

 Measured and Indicated Mineral Resources of 9.3 Mt @ 11.5% valuable heavy minerals

(VHM) at Cargill South, within a total Mineral Resource of 9.7 Mt @ 11.2% VHM.

 Total Mineral Resources for the Barrytown Project now stand at 35.0 Mt @ 15.9% VHM,

including Measured and Indicated Mineral Resources of 34.1 Mt @ 15.8% VHM.

Tāiko Critical Minerals Limited (Tāiko) is pleased to announce an initial mineral resource

estimate (MRE) for the Barrytown Project’s Cargill South Block, West Coast, South Island, New

Zealand, reported in accordance with the JORC Code (2012). The MRE was completed based on

the results of aircore (AC) and sonic drilling undertaken in 2025. The Cargill South Block covers

an area of 92 ha at the southernmost extent of Tāiko’s 1,250 ha mining permit (MP 60785) at

the Barrytown Project.

The Competent Person (Mathijs van de Ven) has classified a Measured Mineral Resource of 4.3

Mt at 4.8% ilmenite, 8.2% garnet and 0.1% zircon; an Indicated Mineral Resource of 5.0 Mt at

3.7% ilmenite, 6.3% garnet and 0.1% zircon, and an Inferred Mineral Resource of approximately

0.4 Mt at 2.1% ilmenite, 3.2% garnet and 0.1% zircon. The Mineral Resource is reported at a cut-

off grade of 1% ilmenite (in situ) and within a particle size range of 45 μm to 2 mm (‘sand

fraction’, Table 1, Table 2). The specified products are individual concentrates rich in ilmenite,

garnet and zircon recovered from the 45 μm to 2 mm size fraction. The Competent Person

(Mathijs van de Ven) considers the product specifications and marketability acceptable.

Table 1: Cargill South Block in-situ Mineral Resource, reported at a 1% ilmenite (in situ) cut-off.

Category

Density

(g/cm

3

)

In-Situ

Mass (Mt)

In-Situ Grade (%) Material Content (kt)

Ilm Gar Zir VHM THM Ilm Gar Zir VHM THM

Measured 2.0 4.3 4.8 8.2 0.1 13.2 16 210 350 5 560 670

Indicated 2.0 5.0 3.7 6.3 0.1 10.1 13 180 320 4 510 660

Measured +

Indicated

2.0 9.3 4.2 7.2 0.1 11.5 14 390 670 9 1,070 1,330

Inferred 2.0 0.4 2.1 3.2 0.1 5.3 7 10 10 0 20 30

Total 2.0 9.7 4.1 7.0 0.1 11.2 14 400 680 9 1,090 1,360

Notes:

1. The Mineral Resource is classified in accordance with the JORC Code (2012).

2. The Mineral Resource is reported at a 1% in-situ ilmenite grade cut-off.

3. Zircon material content is the tonnes of zircon within a particle size range of 45 μm to 2 mm.

4. Garnet material content is the tonnes of garnet within a particle size range of 45 μm to 2 mm.

5. Ilmenite material content is the tonnes of ilmenite within a particle size range of 45 μm to 2 mm.

6. VHM % is the summed grade of ilmenite, garnet, and zircon.

7. Total heavy minerals (THM)% is calculated for each interval as the sum of ilmenite, garnet, zircon, allanite, Fe-oxide, epidote,

rutile, titanite and monazite contained within the particle size range of 45 μm to 2 mm and estimated by OK.

8. The material content is reported within the sand fraction and rounded to the nearest 10 kt except zircon.


Page 2 of 22

9. The Mineral Resource is reported on a dry tonnes basis.

10. The effective date of the Mineral Resource is 11 October 2026.

11. The Mineral Resource is rounded to reflect the level of confidence in the estimate at the time of reporting.

12. Totals may vary due to rounding.

Table 2: Cargill South Block Mineral Resource products.

Category

In-Situ

Mass (Mt)

Sand

(%)

Sand

(kt)

Product Grade (%) Material Content (kt)

Ilm Gar Zir VHM THM Ilm Gar Zir VHM THM

Measured 4.3 50.9 2,180 9.5 16.1 0.2 25.8 30 210 350 5 560 670

Indicated 5.0 57.7 2,900 6.3 10.8 0.1 17.3 22 180 320 4 510 660

Measured +

Indicated

9.3 54.6 5,070 7.8 13.2 0.2 21.2 26 390 670 9 1,070 1,330

Inferred 0.4 47.8 200 4.0 6.2 0.1 10.3 14 10 10 0 20 30

Total 9.7 54.3 5,270 7.6 12.9 0.2 20.7 26 400 680 9 1,090 1,360

Notes:

1. The Mineral Resource is classified in accordance with the JORC Code (2012).

2. The Mineral Resource is reported at a 1% in-situ ilmenite grade cut-off.

3. Zircon material content is the tonnes of zircon within a particle size range of 45 μm to 2 mm.

4. Garnet material content is the tonnes of garnet within a particle size range of 45 μm to 2 mm.

5. Ilmenite material content is the tonnes of ilmenite within a particle size range of 45 μm to 2 mm.

6. VHM% is the summed grade of ilmenite, garnet, and zircon within a particle size range of 45 μm to 2 mm.

7. Total heavy minerals (THM)% is calculated for each interval as the sum of ilmenite, garnet, zircon, allanite, Fe-oxide, epidote,

rutile, titanite and monazite contained within the particle size range of 45 μm to 2 mm and estimated by OK.

8. The material content is reported within the sand fraction and rounded to the nearest 10 kt except zircon.

9. The Mineral Resource is reported on a dry tonnes basis.

10. The effective date of the Mineral Resource is 11 October 2026.

11. The Mineral Resource is rounded to reflect the level of confidence in the estimate at the time of reporting.

12. Totals may vary due to rounding.

PROJECT SUMMARY

The Barrytown Project is a coastal heavy mineral sands project located ~30 km north of

Greymouth, West Coast, New Zealand (Figure 1). The project covers a ~17 km long, ~2 km wide

flat-lying coastal plain (Barrytown Flats) adjacent to the Tasman Sea, with the Paparoa Ranges

to the east. The Cargill South Block is located at the southern end of the project and shares

similar geology, mineralisation style, and development context with the rest of the blocks in the

Barrytown Project. All blocks are accessible via State Highway 6 and are proximal to the ports

of Greymouth and Westport, providing logistical advantages for future development.

TENURE & OWNERSHIP

The Barrytown Project consists of one mineral mining permit (MP) 60785 and one exploration

permit (EP) 60917, granted by New Zealand Petroleum & Minerals (NZP&M; Table 3, Figure 1).

The Cargill South Block MRE is fully contained within MP 60785. NZP&M issues permits to

prospect, explore, and mine Crown-owned minerals in New Zealand. All gold (Au), silver (Ag),

uranium (U), and petroleum in New Zealand are statute minerals owned by the Crown.

Ownership of other minerals (e.g. ilmenite, garnet, and zircon) depends on the legislation in

place at the time the land was alienated from the Crown. Non-statute minerals of interest within

MP 60785 are primarily owned by the Crown, except for several road parcels and private land

parcels. Approximately 11% of the Cargill South Block consists of privately held minerals.


Page 3 of 22


Figure 1: Map of permitted areas and location of Cargill South block.

Table 3: Permit details for the Barrytown Project.

Permit Status Registered Holder Date Granted Expiry Date Area (ha)

MP

60785

Active

Tāiko Critical Minerals

Limited (100%)

21 July 2022 20 July 2042 1,250

EP

60917

Active

Tāiko Critical Minerals

Limited (100%)

19 April 2024 18 April 2029 245


Page 4 of 22

GEOLOGICAL SETTING & MINERALISATION

The Barrytown shoreline deposits are Pleistocene–Holocene immature beach placer sands that

occur along the West Coast, South Island, New Zealand. The shoreline beach deposits are quartz,

feldspar, lithic (mostly grey schist fragments) sands that contain elevated heavy mineral (HM)

abundances, predominantly garnet and ilmenite with minor zircon, rare-earth element (REE)

bearing minerals, and Au (Lee, 1991; Wells and Haverkamp, 2020). The HM have been

concentrated in a series of beach strandlines and are considered to have originated from the

Alpine Schist of the Southern Alps, transported to the coast by rivers, mostly to the south of the

Barrytown Project, and transported north by longshore drift (Bradley et al., 2002; Ritchie et al.,

2019).

The key controls on HM distribution across the Barrytown Project area are:

 the supply of HM through physical weathering;

 the downstream persistence of the HM and their availability in the fluvial or marine

environment; and

 a depositional sorting process to concentrate the HM.

The mineralisation process begins inland with the erosion of metamorphic and sedimentary

rocks, which supplies sand, silt, clay, and HM to stream drainages. Streams and rivers carry the

sediments to the coast, where they are deposited and redistributed in a variety of environments,

such as deltas, the beach face (foreshore), the shoreface, barrier islands, dunes, and tidal

lagoons (Van Gosen et al., 2014). Aeolian dune, foreshore, shoreface, and lagoonal environments

have been identified as the most significant sites of heavy mineral sands deposition (Force,

1991). The upper part of the beach face, the foreshore, is the principal zone of mineral

separation (Force, 1991). Breaking waves carry a charge of turbulent sediment-laden water from

the lower, submerged beach face onto the foreshore, where the backwash winnows lighter

minerals, thus concentrating HM.

DRILLING TECHNIQUES

OVERVIEW

Tāiko (formerly TiGa Minerals and Metals Limited) drilled a total of 882 drillholes at the

Barrytown Project in 2022–2025 over four different resource blocks using predominantly aircore

(AC) drilling and some sonic drilling (Figure 2).

CARGILL SOUTH

In the Cargill South Block, 198 AC holes (BAC264–461) were drilled for a total depth of 2,658 m,

with an average depth of 13.4 m (Table 4, Figure 3). Eight AC holes were twinned by a second

AC hole, giving an AC twinning rate of 4%. Samples were collected from all AC holes. A further

12 sonic holes were drilled in the Cargill South Block for a total of 165 m, each positioned as a

twin of an AC hole (Figure 3). All holes are short and vertical; no downhole surveys were

completed, which the Competent Persons consider to be a low risk. Data from these drillholes

form the basis of the Cargill South MRE.

All AC drilling was completed by Alton using an ADL multipurpose rig mounted on an MST-600VD

crawler, fitted with a three-inch hammer (~76 mm) and 200 psi (400 cfm) compressor. Sonic

drilling was carried out by Pro-Drill using a Fraste XL1 remote-tracked rig operating at 150 Hz,

with an inner drill bit diameter of 79 mm and outer bit diameter of 104 mm, producing 79-mm-

diameter core.

Planned drillhole collar locations were surveyed in advance of drilling by Davis Ogilvy & Partners

Ltd using a Trimble RTK GNSS with R10 rover and base units; drill points were set out to an


Page 5 of 22

accuracy of typically 0.1 m or better. Completed drillhole collars were surveyed by RSC during

the drill programme using a handheld Garmin GPSMAP 67i instrument (accuracy ~3 m). Some

drillholes had to be moved to more accessible locations due to poor ground conditions. All collars

were draped onto topography for estimation.

Table 4: Summary of drilling at Cargill South.

Drill type

Cargill South Block

No. Holes Metres (m)

Aircore 198 2,6580

Sonic 12 165

Programme Total 210 2,823


Figure 2: Overview map of the 2022–2025 resource drilling programme at the Barrytown Critical Minerals

Project.


Page 6 of 22


Figure 3: Overview map of the 2025 resource drilling programme at Cargill South Block.

MINERAL RESOURCE ESTIMATE SUMMARY

This section summarises the material information used to prepare the Cargill South MRE. Further

detail is given in the attached JORC Code (2012) Table 1, Sections 1 to 3.

GEOLOGICAL INTERPRETATION

Geological domains were interpreted from downhole pXRF geochemistry and geological logging.

Three geological domains were modelled using implicit techniques: clay-rich overburden, a

mixed sand–clay zone, and sand. A Rb/Sr ≈ 1.4 was used to define the boundary between clay-

rich material and clay-poor sand. Part of the Cargill South block was historically mined for gold

by dredging. This area was interpreted from aerial photography and grade data and modelled as

a separate dredge domain, which has little/no overburden and less-pronounced grade zonation.


Page 7 of 22

Grades in the sand and dredge domains have bimodal heavy mineral distributions and each

domain was split into high-grade and low-grade estimation domains using a nominal 8% garnet

threshold. The interpretation was refined spatially to ensure consistency between the domains

and interpreted geology. Given the strong geological continuity, high-data density, and

relatively simple geology, the Competent Person (Mathijs van de Ven) is of the opinion that

alternative interpretations are not likely to deviate materially from the current model and are

unlikely to have a material impact on the MRE. Mineralisation remains open to the north, south

and east.

Grain size fractions were estimated directly into the geological domains (clay-rich overburden,

mixed sand–clay zone, and sand) and the dredged domain, without further subdomaining. The

topography surface is a 1-m resolution LiDAR digital elevation model with vertical accuracy of

±0.2 m (95%).

SAMPLING & SUB-SAMPLING TECHNIQUES

AC samples were collected at 1-m intervals through the inner tube and cyclone, weighed in the

field, logged by RSC geologists, and bagged whole. Sonic core (79 mm diameter) was logged,

recovery measured, and core was sampled in 1-m intervals or as defined by lithological

boundaries. Sonic intervals shorter than 1 m were composited to 1 m for estimation. Samples

were dried, weighed, and screened to the 45 μm to 2 mm (sand) fraction at the New Zealand

Institute of Metals and Minerals Research (NZIMMR), Greymouth, then rotary split and pulverised

to produce a pulp for pXRF analysis. Further splits were retained for laboratory XRF, sink-float,

and SEM analysis. Duplicates from the first and fifth splits demonstrate no material bias for the

key elements.

Comparison of dry AC weight data with twin sonic drillholes indicates that AC sample recovery

was not consistently controlled in the saturated, unconsolidated ground, and that AC sample

mass increased with depth. Moreover, the sonic twin drillholes indicate that HM grades from AC

samples are biased low (AC < sonic) by approximately 6–16% in the high-grade sand domain and

6–7% in the high-grade dredged domain. By contrast, AC grades are biased high (AC > sonic) in

the low-grade domains, most likely due to downhole smearing. The Wilcoxon signed-rank test

demonstrates that these biases are statistically significant (p<0.1) across garnet, ilmenite and

zircon for all domains except for the high-grade sand domain. The analysis is hindered by the

paucity of AC-sonic sample pairs (N =12–48), but results are consistent with observations from

sonic twin holes at Canoe Creek (Gazley et al., 2026).

The Competent Persons (Michael Gazley and Mathijs van de Ven) consider the AC data sufficient

to support Inferred and Indicated Mineral Resources, but not sufficient on their own to support

Measured Mineral Resources, and consider the risk associated with the data quality moderate

with respect to the classification of an Indicated or Measured mineral resource. The grade biases

is taken into account in the estimation methodology and classification described in the following

sections.

SAMPLE ANALYSIS & QUALITY CONTROL

RSC analysed 2,842 pulverised samples by pXRF using an Evident Vanta VMR instrument in a test

stand, following the approach of Fisher et al. (2014) and Gazley and Fisher (2014). The data

were calibrated against seven certified reference materials analysed in each session, and pXRF

repeat analyses indicate a precision of 1–3% (RMSCV). A representative subset of 86 samples (72

AC and 14 sonic) was analysed by fused-bead XRF at ALS Geochemistry, Brisbane (ME-XRF30), as

a check on the pXRF data.

A further 112 samples were submitted for sink-float analysis (tetrabromoethane, SG 2.92–2.96)

at Diamantina Laboratories, Perth. Seventy samples (58 AC and 12 sonic), selected to span the

full chemical range, were analysed by SEM-based automated mineralogy (Bruker AMICS) at Middle

Earth Petrographics, Christchurch. Total heavy mineral (THM) grades from SEM and sink-float


Page 8 of 22

analyses demonstrate good agreement (slope 1.07, intercept -2.33%, R² = 0.988). The Competent

Persons (Michael Gazley and Mathijs van de Ven) consider the sample preparation and analytical

workflow fit for purpose.

MINERAL GRADE DETERMINATION

Ilmenite, garnet, and zircon grades were calculated for each sample from pXRF data (Ca, Fe, K,

Mn, Si, Ti, and Zr) using linear regression models trained on the 70 samples analysed by SEM.

Tested on samples withheld from training, the models have mean absolute errors of 0.8%

ilmenite and 1.7% garnet for samples above 1% ilmenite. Iron values are slightly low relative to

SEM-derived values at higher grades, which may contribute to a small conditional bias in

modelled ilmenite and garnet grades in high-grade domains; the Competent Persons (Michael

Gazley and Mathijs van de Ven) consider this effect small relative to the model errors, but note

that it acts preferentially in the high-grade sand and dredged domains, which carry the majority

of the reported material content. The valuable heavy mineral (VHM) grade is the sum of ilmenite,

garnet, and zircon grades. Total heavy minerals (THM)% is calculated for each interval as the

sum of ilmenite, garnet, zircon, allanite, Fe-oxide, epidote, rutile, titanite and monazite

contained within the particle size range of 45 μm to 2 mm (based on model grades calculated

from pXRF data).

ESTIMATION METHODOLOGY

Grades were estimated in a block model with parent blocks of 20 m × 60 m × 1 m (sub-blocked

to 5 m × 15 m × 0.5 m), based on a nominal drill spacing of 30 m × 120 m, using 1-m composites

and hard domain boundaries. In the high-grade sand and high-grade dredged domains, which

contain approximately 90% of the contained VHM, ilmenite, garnet, and zircon grades were

estimated by kriging with variance of measurement error (KVME) in Isatis Neo. The KVME method

was selected based on the observation that AC data are biased low compared to sonic data;

KVME gives more weight to the sonic samples than to the low-biased AC samples. The low-grade,

mixed and overburden domains were estimated by ordinary kriging (OK). The KVME estimation

method was tested for the low-grade domains at Canoe Creek and found to have minimal impact.

Variograms for the high-grade domains have low normalised nuggets (0.10), increasing to 0.20–

0.40 in the other domains, and ranges that typically exceed the drill spacing. Search

neighbourhoods (300 m × 130 m × 10 m, using a minimum of 4 and a maximum of 24 samples)

were based on a kriging neighbourhood analysis completed for the Canoe Creek Block, which has

the same drill spacing and similar geology. Top caps were applied in the overburden, mixed, and

low-grade domains.

Estimates were validated against the input composites using mean and median comparisons

(Figure 4), swath plots, and cross-sections. In the high-grade domains (representing ~90% of

contained VHM in the MRE), KVME mean grades are 2-11% higher than the mean of all composites

(sonic + AC), but 5–22% lower than the declustered sonic mean. Because sonic composites

represent only 6–7% of the data in these domains, the KVME estimated grades fall between the

sonic and sonic+AC sample grades (Figure 4). For the low-grade domains (representing ~10% of

contained VHM in the MRE), OK estimates reproduce input grades (sonic+AC) mostly within 10%

but are biased high compared to the sonic mean and median grades (Figure 4). The Competent

Persons recommend that additional twin drilling is completed at Cargill South to obtain a twin

proportion of at least 20% and achieve a more robust reweighting of the sample grades through

the KVME method.

The proportions of the three size fractions (<45 μm, 45 μm to 2 mm, and >2 mm) were estimated

by OK using the same variogram model for each domain to preserve the interdependent nature

of the variables (i.e. proportions summing to 100%). In-situ grades were determined based on

the grade of the product fraction and the proportion of the product size fraction.


Page 9 of 22


Figure 4: Waterfall chart for the heavy mineral grade estimate by domain.


Page 10 of 22

BULK DENSITY

Dry bulk density was determined on 182 sonic samples from dried weights and core volumes; no

independent check measurements were made. After comparison with densities calculated from

HM grade and porosity, 58 unreliable measurements were excluded (half-cored samples, dry

weight exceeding wet weight, or samples under 5,000 g), leaving 124 bulk density results. For

the sand domains, median bulk densities are within 3% of those at Canoe Creek. An equivalent

of the dredge domain does not exist at Canoe Creek for comparison.

Median values were assigned to the blockmodel by domain: 2.35 t/m³ for high-grade sand, 2.01

t/m³ for low-grade sand and mixed, 1.88 t/m³ for dredge, and 1.49 t/m³ for overburden. The

use of OK-estimated densities was tested and found to have minimal impact on the MRE. The

Competent Person (Mathijs van de Ven) considers the bulk density estimate a low-to-moderate

risk to the classification objectives.

CLASSIFICATION STATEMENT

The Competent Person (Mathijs van de Ven) has classified a Measured Mineral Resource of 4.3

Mt at 4.8% ilmenite, 8.2% garnet and 0.1% zircon; an Indicated Mineral Resource of 5.0 Mt at

3.7% ilmenite, 6.3% garnet and 0.1% zircon, and an Inferred Mineral Resource of ~0.4 Mt at

2.1% ilmenite, 3.2% garnet and 0.1% zircon. The Mineral Resource is reported at a cut-off grade

of 1% ilmenite (in situ) and within a particle size range of 45 μm to 2 mm (‘sand fraction’,

Table 1, Table 2). The Mineral Resource has been classified in accordance with the JORC Code

(2012) and is presented graphically in Error! Reference source not found.. Table 1

summarises tonnes and in-situ grades, determined on the basis of the grade of the product

fraction and the proportion of the product size fraction to the whole. Table 2 details the

proportion of the product size fraction for each resource category and the HM grade inside the

product size fraction, which is higher than the in-situ HM grade.

In accordance with Clause 49 of the JORC Code (2012), the Competent Person (Mathijs van de

Ven) has considered the likely product and its specifications. The specified products are

individual concentrates rich in ilmenite, garnet and zircon recovered from the 45 μm to 2 mm

size fraction. The Mineral Resource is reported in terms of the minerals on which the project is

based and includes the specification of these minerals.

The Measured portion of the Mineral Resource has been determined from an assessment of

geological and grade continuity, drill spacing, kriging statistics and availability of sonic twin

drilling. Blocks that are in the high-grade sand or high-grade dredge domains and less than 100

m from a sonic drillhole were classified in the Measured category. Geological evidence is derived

from adequately detailed and reliable exploration, sampling and testing gathered through

appropriate techniques from drillholes, including SEM-based automated mineralogy, and is

sufficient to confirm geological and grade continuity between points of observation where data

and samples are gathered. The Competent Person (Mathijs van de Ven) acknowledges the

presence of a demonstrated low bias in the AC data for the key mineralised domains (high-grade

sand and high-grade dredge) and notes that the AC data alone would not be sufficient to support

a Measured classification. However, the Competent Person deems it appropriate to classify parts

of the resource as Measured for these two domains given that: the tenor of bias is constrained

by 12 twin sonic drillholes to be a low bias; the likely impact of the bias is a conservative

estimate for these domains; and a grade correction has been applied through the estimation

methodology to mitigate the impact of the bias. The Competent Person acknowledges that

blocks classified as Measured may still be subject to a HM grade low bias of up to 4 percentage

points (median block grade < median sonic grade) resulting in a conservative estimate for the

blocks classified as Measured. A larger number of sonic twin holes (>20%) is required for a robust

re-weighting of the AC data in the estimate).

Blocks within a perimeter representing half the average drillhole spacing, but not meeting the

Measured criteria were classified in the Indicated category. For this portion of the MRE, evidence


Page 11 of 22

is sufficient to assume, but not confirm, geological and grade continuity due to the quantified

low bias in the AC data away from sonic control. The Competent Person (Mathijs van de Ven)

acknowledges that Indicated blocks in the low-grade domains may be subject to a high bias in

HM grade of up to 3 percentage points (median block grade > median sonic grade). These domains

contribute <20% of the total contained VHM in the Indicated category.

Blocks that are outside the half drillhole spacing perimeter, but within a perimeter representing

~1 times the drillhole spacing were classified in the Inferred category. For this portion of the

MRE, geological evidence is sufficient to imply but not verify geological and grade continuity.

The Mineral Resource is a global estimate. The confidence in the Mineral Resource is reflected

in the Measured, Indicated, and Inferred classifications, which have been assigned based on the

drill spacing, data quality and geological and grade continuity.


Figure 5: Classified Mineral Resource for Cargill South at a 1.0% in-situ ilmenite cut-off. Perspective view

looking northeast. Portions to the west are too close to the shoreline to meet RPEEE requirements.

CUT-OFF GRADE

The Mineral Resource is reported above a cut-off grade of 1% ilmenite (in situ), the cut-off

adopted in the “Draft Barrytown Sands Feasibility Study” (London, 2023) for the nearby Coates

South Block and used for the Canoe Creek MRE (Gazley et al., 2026). The tonnage is sensitive to

the cut-off grade, but the contained VHM is less so. At a 2% ilmenite cut-off, the Mineral Resource

would be 6.8 Mt at 14.3% VHM (980 kt VHM), compared with 9.7 Mt at 11.2% VHM (1,090 kt VHM)

at 1%.

MINING AND METALLURGICAL METHODS AND PARAMETERS

The Mineral Resource assumes bulk, low-selectivity mining by dredge or excavator, with more

than 95% recovery of the sand unit. These are the assumptions of the draft feasibility study for

Coates South (London, 2023), in which engineering and design were completed to 20–30%

precision, and of earlier studies (Banaszak et al., 2018). Metallurgical assumptions are based on

test work on bulk samples from Coates South and earlier programmes. The Competent Person

(Mathijs van de Ven) considers these applicable to Cargill South because the Coates South and

Canoe Creek blocks, ~5 km and ~3 km to the north, are geologically very similar. This work

demonstrates reasonable pathways to produce marketable concentrates containing ilmenite,


Page 12 of 22

garnet, and zircon.


Figure 6: Limit of RPEEE for the Cargill South Block based on a dredge-mining operation, black line.

REASONABLE PROSPECTS FOR EVENTUAL ECONOMIC EXTRACTION

Mining of the Cargill South Block requires resource consents, which had not been granted as at

the effective date of the MRE. A substantive application under the Fast-track Approvals Act 2024

is being considered (see Environmental Factors and Risks). The Competent Person (Mathijs van

de Ven) considers it likely that the required consents will be granted under the current legislative

framework. However, the reasonable prospects for eventual economic extraction (RPEEE)

depend on that outcome. On this basis, and taking into account the mining, metallurgical and

economic parameters described above, the Competent Person (Mathijs van de Ven) considers

the Mineral Resource a realistic inventory of mineralisation that, under assumed and justifiable

technical, economic and development conditions, might in whole or in part become

economically extractable.


Page 13 of 22

A pit optimisation has not been completed for Cargill South. The RPEEE limits were instead

defined using criteria from a preliminary optimisation by AMC Consultants for a dredge-mining

operation at Canoe Creek (Error! Reference source not found.). Blocks are included in the

Mineral Resource only if they are:

 within 12 m of the surface;

 outside a 50 m standoff from protected natural reserves and the shoreline; and

 below the uppermost 0.4 m (topsoil).

The Competent Person (Mathijs van de Ven) considers this approach appropriate at the current

stage of study, and notes that a Cargill South-specific optimisation would be required to support

Ore Reserve estimation.

PRODUCT SPECIFICATION & MARKETABILITY

The specified products are individual concentrates rich in ilmenite, garnet and zircon recovered

from the 45 μm to 2 mm size fraction. Impurities and deleterious characteristics were assessed

using SEM data. Based on experience with similar projects and products in New Zealand, the

Competent Person (Mathijs van de Ven) considers that reasonable markets exist for these

concentrates, most likely in China, North America, and/or Europe.

KEY RISKS & RECOMMENDATIONS

The main risks to the MRE identified by the Competent Persons (Michael Gazley and Mathijs van

de Ven) are as follows:

 AC sampling bias: HM grades from AC samples are biased low in high-grade domains and

high in low-grade domains. Sonic data make up about 6–7% of the composites and are

insufficient to fully correct the bias.

 Bulk density: No independent check measurements were made, and density is assigned

by domain rather than estimated.

 Study basis: The cut-off grade, RPEEE limits, and mining and metallurgical assumptions

are based on studies of the neighbouring Coates South and Canoe Creek blocks, not

Cargill South.

 Consents: Mining requires resource consents that had not been granted as at the

effective date of the MRE.

The Competent Persons (Michael Gazley and Mathijs van de Ven) recommend a regular sonic

drilling programme (approximately 120 m × 90 m spacing) to resolve the residual grade bias,

improved quality control of density and sample-processing data at NZIMMR, and a Cargill South-

specific pit optimisation before Ore Reserve estimation.

ENVIRONMENTAL FACTORS AND RISKS

The Barrytown Project is located in an area of high average annual rainfall and high groundwater

levels. As at the effective date of the MRE, Tāiko holds resource consents to mine the Coates

South Block and to construct and operate a mineral separation plant at Rapahoe. The Barrytown

Mineral Sands Project is a listed project under Schedule 2 of the Fast-track Approvals Act 2024.

A substantive application under the Fast-track Approvals Act 2024, covering the Canoe Creek,

Barrytown Farms, and Cargill South blocks, was lodged with the Environmental Protection

Authority on 8 June 2026 and accepted as complete on 29 June 2026. The application was at the

written comments stage, and no decision had been issued as at the effective date of the MRE.

The Competent Persons (Michael Gazley and Mathijs van de Ven) consider that Tāiko is working

towards an outcome where it is likely that resource consents will be granted for mining the


Page 14 of 22

Cargill South Block, and note that if resource consents are not granted, this could have a negative

effect on the MRE’s prospects of eventual economic extraction.

The Competent Persons (Michael Gazley and Mathijs van de Ven) note that Tāiko and its

consultants regularly engage with iwi (indigenous Māori tribes) and hapū (Māori sub-tribes),

whose rohe (territory) includes some or all of the Barrytown Project area, or who may be directly

affected by the Barrytown Project, namely Ngāti Waewae. Ngāti Waewae gave its support to

Tāiko’s Coates South resource consent application to mine. The consent has since been granted,

subject to several mitigating measures. It is likely that the same expectations would apply to

any future mining of the Cargill South Block.

On balance, the Competent Persons (Michael Gazley and Mathijs van de Ven) consider that the

environmental, social and governance factors are sufficiently well understood and proactively

managed to support the MRE’s reasonable prospects for eventual economic extraction at the

effective date of the MRE.

SUMMARY OF MINERAL RESOURCE ESTIMATES AT THE BARRYTOWN PROJECT

There are three other current mineral resource estimates for the Barrytown Project, namely for

the Barrytown Farms, Coates South, and Canoe Creek Blocks. Barrytown Farms and Coates South

were completed in 2023 by RSC, and Canoe Creek was completed in 2026 by RSC. These are

summarised, along with the Cargill South MRE reported here, in Table 5.


Page 15 of 22

Table 5: In-situ Mineral Resource for the Barrytown Project, reported at a 1% ilmenite (in situ) grade cut-

off.

Deposit Category

In-Situ

Mass (Mt)

Sand

4


(%)

In-Situ Grade (%)

5

Material Content (kt)

10


Ilmenite Garnet Zircon VHM

6

THM

7,8,9

Ilmenite Garnet Zircon VHM THM

Cargill

South

Measured 4.3 50.9 4.8 8.2 0.1 13.2 16 210 350 5 560 670

Indicated 5.0 57.7 3.7 6.3 0.1 10.1 13 180 320 4 510 660

Inferred 0.4 47.8 2.1 3.2 0.1 5.3 7 10 10 0 20 30

Total 9.7 54.3 4.1 7.0 0.1 11.2 14 400 680 9 1,090 1,360

Canoe

Creek

Measured 1.15 64.4 11.7 13.8 0.24 26 32 130 160 3 300 370

Indicated 1.7 64.2 6.8 9 0.16 16 21 120 150 3 270 360

Inferred 0.5 67 12 14 0.3 26 33 70 80 2 140 180

Total 3.4 64.7 9.3 11.5 0.2 21 27 320 390 7 710 910

Barrytown

Farms

Measured 7.7 80 7.8 10.6 0.2 18.7 24.9 610 820 14 1,440 1,920

Indicated 5.8 76 9.2 12.2 0.2 21.6 28.5 530 710 11 1,250 1,650

Inferred - - - - - - - - - - - -

Total 13.5 78 8.4 11.3 0.2 19.9 26.4 1,140 1,530 25 2,690 3,570

Coates

South

Measured 4.6 68.3 5.2 7.8 0.1 13.2 21 240 360 4 610 950

Indicated 3.8 66.4 5 6.4 0.1 11.5 19 190 240 4 440 710

Inferred - - - - - - - - - - - -

Total 8.4 67.4 5.1 7.2 0.1 12.4 20 430 610 8 1,040 1,660

Total

Measured 17.8 69.2 6.7 9.5 0.1 16.4 22 1,190 1,690 26 2,910 3,910

Indicated 16.3 66.8 6.3 8.7 0.1 15.2 21 1,020 1,420 22 2,470 3,380

M+I 34.1 68.0 6.5 9.1 0.1 15.8 21 2,210 3,110 48 5,380 7,290

Inferred 0.9 61.8 8.9 10.0 0.2 17.8 23 80 90 2 160 210

Total 35.0 67.9 6.6 9.2 0.1 15.9 21 2,290 3,200 50 5,540 7,500

Notes:

1. Estimates are rounded to reflect the level of confidence at the time of reporting.

2. The Mineral Resources are classified in accordance with the JORC Code (2012).

3. The Mineral Resources are reported at a 1% ilmenite grade cut-off.

4. Sand is defined as the particle size range of 45 μm to 2 mm.

5. In-situ grades are grades estimated for the particle size range 45 μm to 2 mm factored by the proportion of sand.

6. Valuable Heavy Minerals (VHM) % is the sum of ilmenite, garnet, and zircon.

7. Total heavy minerals (THM)% is calculated for each interval as sum of ilmenite, garnet, zircon, allanite, Fe-oxide, epidote,

rutile, titanite and monazite contained within the particle size range of 45 μm to 2 mm and estimated by OK.

8. For Canoe Creek, Barrytown Farms and Coates South, THM% was calculated from VHM grade for each block using a linear

regression based on the SEM data: -0.0043 × [VHM]² + 1.3811 × [VHM] + 2.2234.

9. For Coates South, Total Heavy Minerals (THM) % is calculated for each interval as [VHM] / 0.66 and estimated by OK.

10. The Material Content is reported within the sand fraction and rounded to the nearest 10 kt except zircon.

11. The Mineral Resource is reported on a dry tonnes basis.

12. The effective date of the Cargill South MRE is 11 October 2026.

13. The effective date of the Canoe Creek MRE is 4 May 2026.

14. The effective date of the Barrytown Farms MRE is 6 October 2023.

15. The effective date of the Coates South MRE is 10 February 2023.

16. Totals may vary due to rounding.


Page 16 of 22

The Mineral Resource Estimates for the Barrytown Farms and Coates South Blocks were

previously reported by Tāiko Critical Minerals Limited (formerly TiGa Minerals and Metals

Limited) in the public announcement entitled “Initial Mineral Resource Estimate for the

Barrytown Critical Minerals Project” dated 20 January 2026 (Competent Person: René Sterk),

and the Mineral Resource Estimate for the Canoe Creek Block in the public announcement

entitled “Initial Mineral Resource Estimate for the Canoe Creek Block at the Barrytown Critical

Minerals Project” dated 6 May 2026 (Competent Persons: Michael Gazley and Mathijs van de

Ven). The form and context of the Competent Person's findings have not been materially

modified. Tāiko confirms that it is not aware of any new information or data that materially

affects the information included in those announcements, and that all material assumptions and

technical parameters underpinning the Mineral Resource Estimates continue to apply and have

not materially changed.

COMPETENT PERSON’S STATEMENT

The information in this announcement that relates to Mineral Resources is based on and fairly

represents information and supporting documentation compiled under the supervision of the

Competent Persons, Michael Gazley (sampling and data quality) and Mathijs van de Ven

(domaining and resource estimation). Michael Gazley and Mathijs van de Ven consent to the

inclusion in the announcement of the matters based on this information in the form and context

in which it appears. The Competent Persons are employees of RSC Consulting and are

independent of Tāiko.

Michael Gazley is a Member of the AusIMM and a Member of the Australian Institute of

Geoscientists. Michael is the General Manager Geoscience and Exploration at RSC and holds a

PhD in Geology from Victoria University of Wellington, New Zealand. He is an expert in pXRF

data collection and interpretation, and in collecting, integrating, and interpreting diverse

chemical and mineralogical datasets using multivariate techniques in exploration and mining

settings. He has almost 20 years of experience working in a range of commodities globally,

including orogenic Au, epithermal Au, placer Au, shear-hosted Cu, IOCG, Cu-Au porphyry, Pb-

Zn-Ag deposits, Li and REE pegmatites, and HMS. Michael has sufficient experience that is

relevant to the style of mineralisation and type of deposit under consideration, and to the

activity being undertaken, to qualify as a Competent Person as defined in the 2012 Edition of

the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore

Reserves’.

Mathijs van de Ven is a Member of The Australasian Institute of Mining and Metallurgy (AusIMM).

Mathijs is a Senior Resource Geologist for RSC, a global resource development consultancy, and

holds an MSc in Geology and Geochemistry from the Vrije Universiteit in Amsterdam. He has

eight years of experience working in Au, base metal, and high-tech metal exploration projects

in Australia, New Zealand, Indonesia, and Papua New Guinea and has authored and co-authored

several peer-reviewed research papers. Mathijs has experience in geological modelling, mineral

resource estimation, code-compliant reporting and QA/QC reviews, and has worked on resource

estimates of orogenic, epithermal and porphyry Au, VHMS Cu-Pb-Zn, skarn W, and HMS deposits.

Mathijs has sufficient experience that is relevant to the style of mineralisation and type of

deposit under consideration, and to the activity being undertaken, to qualify as a Competent

Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration

Results, Mineral Resources and Ore Reserves’.

In addition to preparing the Mineral Resource estimate, Tāiko has also contracted RSC to provide

limited contracting and other advisory services. The full nature of the relationship between RSC

and Tāiko, including any issue that could be perceived by investors as a conflict of interest, has

been disclosed.


Page 17 of 22

REFERENCES

Banaszak, P., Mann, S., Pearce, R. & Straface, D., 2018. Prefeasibility Study, Barrytown Mineral

Sands Project, New Zealand EP51803. Barrytown JV Limited.

Bradley, J., Chew, P. & Wilkins, C., 2002. Transport and distribution of magnetite and ilmenite

on Westland beaches of New Zealand; with comment on the accumulation of other high-

density minerals. Journal of the Royal Society of New Zealand, 32, 169–181.

Fisher, L., Gazley, M. F., Baensch, A., Barnes, S. J., Cleverley, J. & Duclaux, G., 2014. Resolution

of geochemical and lithostratigraphic complexity: a workflow for application of portable

X-ray fluorescence to mineral exploration. Geochemistry: Exploration, Environment,

Analysis, 14, 149–159.

Force, E. R., 1991. Geology of titanium-mineral deposits, Geological Society of America.

Gallagher, E., Wadman, H., McNinch, J., Reniers, A. & Koktas, M., 2016. A conceptual model for

spatial grain size variability on the surface of and within beaches. Journal of Marine

Science and Engineering, 4, 38.

Gazley, M. & Fisher, L., 2014. A review of the reliability and validity of portable X-ray

fluorescence spectrometry (pXRF) data. Mineral resource and ore reserve estimation–The

AusIMM guide to good practice, 69, 82.

Gazley, M., Van de Ven, M., Pocock, A., McKellar, Z., Doyle, S., Lilly, K. & Bertoli, O., 2026.

Canoe Creek Mineral Resource Estimate. RSC, Competent Person: M. Gazley, M. van de

Ven.

Lee, G., 1991. Statement of Ilmenite Sand Resources at Barrytown, MR4287. Westland Ilmenite

Ltd, Competent Person: Ministry of Economic Development New Zealand, Unpublished

Mineral Report, p. 401.

London, J., 2023. Draft Barrytown Sands Feasibility Study. Prepared by Palaris for TiGa Minerals

and Metals Ltd. Document No. BJL5790-001, p. 327.

Ritchie, T. W., Scott, J. M. & Craw, D., 2019. Garnet compositions track longshore migration of

beach placers in western New Zealand. Economic Geology, 114, 513–540.

Suggate, R., 1989. The postglacial shorelines and tectonic development of the Barrytown coastal

lowland, North Westland, New Zealand. New Zealand Journal of Geology and Geophysics,

32, 443–450.

Van Gosen, B. S., Fey, D. L., Shah, A. K., Verplanck, P. L. & Hoefen, T. M., 2014. Deposit model

for heavy-mineral sands in coastal environments. US Geological Survey, 2328-0328.

Wells, H. C. & Haverkamp, R. G., 2020. Characterization of the heavy mineral suite in a holocene

beach placer, Barrytown, New Zealand. Minerals, 10, 86.


Page 18 of 22

APPENDIX 1: DRILLHOLE COLLARS

Hole ID GPS_Easting GPS_Northing

Actual

Depth (m)

Date

Started

Date

Completed

Drill Type Hole type

BAC264 1460630 5321573 12

23/05/2025 23/05/2025

AC Primary

BAC265 1460601 5321579 12

23/05/2025 23/05/2025

AC Primary

BAC266 1460571 5321579 12

23/05/2025 23/05/2025

AC Primary

BAC267 1460545 5321577 12

23/05/2025 23/05/2025

AC Primary

BAC268 1460554 5321486 12

23/05/2025 23/05/2025

AC Primary

BAC269 1460581 5321488 12

23/05/2025 23/05/2025

AC Primary

BAC270 1460612 5321487 12

24/05/2025 24/05/2025

AC Primary

BAC271 1460643 5321484 12

24/05/2025 24/05/2025

AC Primary

BAC272 1460659 5321369 12

24/05/2025 24/05/2025

AC Primary

BAC273 1460631 5321369 12

24/05/2025 24/05/2025

AC Primary

BAC274 1460600 5321368 12

24/05/2025 24/05/2025

AC Primary

BAC275 1460570 5321368 12

24/05/2025 24/05/2025

AC Primary

BAC276 1460538 5321369 12

24/05/2025 24/05/2025

AC Primary

BAC277 1460530 5321248 12

24/05/2025 24/05/2025

AC Primary

BAC278 1460554 5321248 12

24/05/2025 24/05/2025

AC Primary

BAC279 1460583 5321247 12

25/05/2025 25/05/2025

AC Primary

BAC280 1460613 5321248 12

25/05/2025 25/05/2025

AC Primary

BAC281 1460599 5321126 12

25/05/2025 25/05/2025

AC Primary

BAC282 1460571 5321129 12

25/05/2025 25/05/2025

AC Primary

BAC283 1460540 5321128 12

25/05/2025 25/05/2025

AC Primary

BAC284 1460524 5321010 12

25/05/2025 25/05/2025

AC Primary

BAC285 1460553 5321009 12

25/05/2025 25/05/2025

AC Primary

BAC286 1460583 5321008 12

25/05/2025 25/05/2025

AC Primary

BAC287 1460675 5321489 12

25/05/2025 25/05/2025

AC Primary

BAC288 1460706 5321489 15

26/05/2025 26/05/2025

AC Primary

BAC289 1460736 5321488 12

26/05/2025 26/05/2025

AC Primary

BAC290 1460765 5321489 14

26/05/2025 26/05/2025

AC Primary

BAC291 1460661 5321577 12

26/05/2025 26/05/2025

AC Primary

BAC292 1460690 5321369 12

26/05/2025 26/05/2025

AC Primary

BAC293 1460720 5321367 12

26/05/2025 26/05/2025

AC Primary

BAC294 1460748 5321368 12

26/05/2025 26/05/2025

AC Primary

BAC295 1460778 5321368 12

26/05/2025 26/05/2025

AC Primary

BAC296 1460793 5321350 15

26/05/2025 26/05/2025

AC Primary

BAC297 1460766 5321250 12

27/05/2025 27/05/2025

AC Primary

BAC298 1460736 5321249 12

27/05/2025 27/05/2025

AC Primary

BAC299 1460707 5321248 12

27/05/2025 27/05/2025

AC Primary

BAC300 1460676 5321249 12

27/05/2025 27/05/2025

AC Primary

BAC301 1460651 5321248 12

27/05/2025 27/05/2025

AC Primary

BAC302 1460824 5321248 12

27/05/2025 27/05/2025

AC Primary

BAC303 1460805 5321247 12

27/05/2025 27/05/2025

AC Primary

BAC304 1460852 5321247 12

27/05/2025 27/05/2025

AC Primary

BAC305 1460887 5321248 12

27/05/2025 27/05/2025

AC Primary

BAC306 1460902 5321247 15

28/05/2025 28/05/2025

AC Primary

BAC307 1460929 5321366 14

28/05/2025 28/05/2025

AC Primary

BAC308 1460900 5321367 12

28/05/2025 28/05/2025

AC Primary

BAC309 1460869 5321367 12

28/05/2025 28/05/2025

AC Primary

BAC310 1460839 5321366 12

29/05/2025 29/05/2025

AC Primary

BAC311 1460943 5321486 12

29/05/2025 29/05/2025

AC Primary

BAC312 1460915 5321487 12

29/05/2025 29/05/2025

AC Primary

BAC313 1460885 5321488 12

29/05/2025 29/05/2025

AC Primary

BAC314 1460856 5321488 12

29/05/2025 29/05/2025

AC Primary

BAC315 1460826 5321487 12

29/05/2025 29/05/2025

AC Primary

BAC316 1460842 5321129 15

30/05/2025 30/05/2025

AC Primary

BAC317 1460810 5321129 12

30/05/2025 30/05/2025

AC Primary

BAC318 1460781 5321128 12

30/05/2025 30/05/2025

AC Primary


Page 19 of 22

Hole ID GPS_Easting GPS_Northing

Actual

Depth (m)

Date

Started

Date

Completed

Drill Type Hole type

BAC319 1460749 5321130 12

30/05/2025 30/05/2025

AC Primary

BAC320 1460722 5321126 15

30/05/2025 30/05/2025

AC Primary

BAC321 1460719 5321122 12

30/05/2025 30/05/2025

AC Twin

BAC322 1460691 5321127 12

30/05/2025 30/05/2025

AC Primary

BAC323 1460662 5321128 12

30/05/2025 30/05/2025

AC Primary

BAC324 1460632 5321128 12

30/05/2025 30/05/2025

AC Primary

BAC325 1460615 5321010 12

31/05/2025 31/05/2025

AC Primary

BAC326 1460645 5321009 12

31/05/2025 31/05/2025

AC Primary

BAC327 1460674 5321010 12

31/05/2025 31/05/2025

AC Primary

BAC328 1460704 5321010 12

31/05/2025 31/05/2025

AC Primary

BAC329 1460829 5321008 12

31/05/2025 31/05/2025

AC Primary

BAC330 1460852 5321007 12

31/05/2025 31/05/2025

AC Primary

BAC331 1460899 5321128 12

31/05/2025 31/05/2025

AC Primary

BAC332 1460871 5321127 12

31/05/2025 31/05/2025

AC Primary

BAC333 1460795 5321003 12

1/06/2025 1/06/2025

AC Primary

BAC334 1460764 5321008 12

1/06/2025 1/06/2025

AC Primary

BAC335 1460736 5321006 15

1/06/2025 1/06/2025

AC Primary

BAC336 1460888 5321010 15

1/06/2025 1/06/2025

AC Primary

BAC337 1460911 5321009 15

1/06/2025 1/06/2025

AC Primary

BAC338 1460944 5321007 12

1/06/2025 1/06/2025

AC Primary

BAC339 1460972 5321007 15

1/06/2025 1/06/2025

AC Primary

BAC340 1461004 5321008 18

2/06/2025 2/06/2025

AC Primary

BAC341 1460989 5321128 12

2/06/2025 2/06/2025

AC Primary

BAC342 1460961 5321127 18

2/06/2025 2/06/2025

AC Primary

BAC343 1460940 5321108 15

2/06/2025 2/06/2025

AC Primary

BAC344 1461017 5320889 12

2/06/2025 2/06/2025

AC Primary

BAC345 1460991 5320889 12

2/06/2025 2/06/2025

AC Primary

BAC346 1460963 5320873 18

3/06/2025 3/06/2025

AC Primary

BAC347 1460928 5320888 12

3/06/2025 3/06/2025

AC Primary

BAC348 1460898 5320901 15

3/06/2025 3/06/2025

AC Primary

BAC349 1460866 5320882 15

3/06/2025 3/06/2025

AC Primary

BAC350 1460867 5320879 15

3/06/2025 3/06/2025

AC Twin

BAC351 1460840 5320887 15

3/06/2025 3/06/2025

AC Primary

BAC352 1460809 5320888 12

4/06/2025 4/06/2025

AC Primary

BAC353 1460781 5320888 9

4/06/2025 4/06/2025

AC Primary

BAC354 1460748 5320889 12

4/06/2025 4/06/2025

AC Primary

BAC355 1460716 5320889 12

5/06/2025 5/06/2025

AC Primary

BAC356 1460700 5320887 12

5/06/2025 5/06/2025

AC Primary

BAC357 1460704 5320767 15

5/06/2025 5/06/2025

AC Primary

BAC358 1460735 5320766 12

6/06/2025 6/06/2025

AC Primary

BAC359 1460759 5320769 12

6/06/2025 6/06/2025

AC Primary

BAC360 1460749 5320646 12

6/06/2025 6/06/2025

AC Primary

BAC361 1460717 5320648 12

6/06/2025 6/06/2025

AC Primary

BAC362 1460688 5320648 12

6/06/2025 6/06/2025

AC Primary

BAC363 1460675 5320526 12

6/06/2025 6/06/2025

AC Primary

BAC364 1460704 5320526 12

6/06/2025 6/06/2025

AC Primary

BAC365 1460734 5320525 12

6/06/2025 6/06/2025

AC Primary

BAC366 1460760 5320526 15

7/06/2025 7/06/2025

AC Primary

BAC367 1460779 5320417 12

7/06/2025 7/06/2025

AC Primary

BAC368 1460754 5320418 12

7/06/2025 7/06/2025

AC Primary

BAC369 1460644 5320528 12

7/06/2025 7/06/2025

AC Primary

BAC370 1460614 5320527 12

7/06/2025 7/06/2025

AC Primary

BAC371 1460584 5320529 12

7/06/2025 7/06/2025

AC Primary

BAC372 1460549 5320525 12

7/06/2025 7/06/2025

AC Primary

BAC373 1460532 5320526 12

7/06/2025 7/06/2025

AC Primary

BAC374 1460508 5320407 12

8/06/2025 8/06/2025

AC Primary


Page 20 of 22

Hole ID GPS_Easting GPS_Northing

Actual

Depth (m)

Date

Started

Date

Completed

Drill Type Hole type

BAC375 1460538 5320406 12

8/06/2025 8/06/2025

AC Primary

BAC376 1460570 5320416 12

8/06/2025 8/06/2025

AC Primary

BAC377 1460598 5320409 12

8/06/2025 8/06/2025

AC Primary

BAC378 1460718 5320405 12

8/06/2025 8/06/2025

AC Primary

BAC379 1460689 5320408 12

8/06/2025 8/06/2025

AC Primary

BAC380 1460660 5320409 12

8/06/2025 8/06/2025

AC Primary

BAC381 1460630 5320409 12

8/06/2025 8/06/2025

AC Primary

BAC382 1460493 5320289 12

9/06/2025 9/06/2025

AC Primary

BAC383 1460524 5320286 12

9/06/2025 9/06/2025

AC Primary

BAC384 1460553 5320286 12

9/06/2025 9/06/2025

AC Primary

BAC385 1460582 5320286 12

9/06/2025 9/06/2025

AC Primary

BAC386 1460613 5320288 12

9/06/2025 9/06/2025

AC Primary

BAC387 1460640 5320280 12

9/06/2025 9/06/2025

AC Primary

BAC388 1460943 5320289 15

10/06/2025 10/06/2025

AC Primary

BAC389 1460909 5320289 15

10/06/2025 10/06/2025

AC Primary

BAC390 1460877 5320288 15

10/06/2025 10/06/2025

AC Primary

BAC391 1460850 5320287 15

10/06/2025 10/06/2025

AC Primary

BAC392 1460875 5320405 15

11/06/2025 11/06/2025

AC Primary

BAC393 1460819 5320288 14

11/06/2025 11/06/2025

AC Primary

BAC394 1460844 5320407 15

11/06/2025 11/06/2025

AC Primary

BAC395 1460793 5320289 15

11/06/2025 11/06/2025

AC Primary

BAC396 1460811 5320403 15

11/06/2025 11/06/2025

AC Primary

BAC397 1460757 5320287 15

11/06/2025 11/06/2025

AC Primary

BAC398 1460726 5320288 12

12/06/2025 12/06/2025

AC Primary

BAC399 1460700 5320294 15

13/06/2025 13/06/2025

AC Primary

BAC400 1460673 5320285 12

13/06/2025 13/06/2025

AC Primary

BAC401 1460900 5320399 15

13/06/2025 13/06/2025

AC Primary

BAC402 1460935 5320400 15

13/06/2025 13/06/2025

AC Primary

BAC403 1460968 5320412 15

13/06/2025 13/06/2025

AC Primary

BAC404 1460971 5320410 18

14/06/2025 14/06/2025

AC Twin

BAC405 1460992 5320402 15

14/06/2025 14/06/2025

AC Primary

BAC406 1460854 5320536 15

14/06/2025 14/06/2025

AC Primary

BAC407 1460886 5320531 15

14/06/2025 14/06/2025

AC Primary

BAC408 1460915 5320528 15

14/06/2025 14/06/2025

AC Primary

BAC409 1460942 5320529 18

14/06/2025 14/06/2025

AC Primary

BAC410 1460973 5320525 17

15/06/2025 15/06/2025

AC Primary

BAC411 1461002 5320523 18

15/06/2025 15/06/2025

AC Primary

BAC412 1460978 5320524 21

15/06/2025 15/06/2025

AC Twin

BAC413 1461037 5320517 18

15/06/2025 15/06/2025

AC Primary

BAC414 1460805 5320514 15

15/06/2025 15/06/2025

AC Primary

BAC415 1460834 5320520 18

15/06/2025 15/06/2025

AC Primary

BAC416 1461019 5320648 18

16/06/2025 16/06/2025

AC Primary

BAC417 1460988 5320653 21

16/06/2025 16/06/2025

AC Primary

BAC418 1460960 5320655 21

16/06/2025 16/06/2025

AC Primary

BAC419 1460930 5320657 18

16/06/2025 16/06/2025

AC Primary

BAC420 1460898 5320656 18

16/06/2025 16/06/2025

AC Primary

BAC421 1460869 5320657 18

17/06/2025 17/06/2025

AC Primary

BAC422 1460841 5320657 15

17/06/2025 17/06/2025

AC Primary

BAC423 1460811 5320665 15

17/06/2025 17/06/2025

AC Primary

BAC424 1460798 5320641 15

17/06/2025 17/06/2025

AC Primary

BAC425 1461033 5320769 21

17/06/2025 17/06/2025

AC Primary

BAC426 1461004 5320767 21

17/06/2025 17/06/2025

AC Primary

BAC427 1460971 5320766 18

18/06/2025 18/06/2025

AC Primary

BAC428 1460941 5320774 18

18/06/2025 18/06/2025

AC Primary

BAC429 1460910 5320779 18

18/06/2025 18/06/2025

AC Primary

BAC430 1460884 5320777 18

18/06/2025 18/06/2025

AC Primary


Page 21 of 22

Hole ID GPS_Easting GPS_Northing

Actual

Depth (m)

Date

Started

Date

Completed

Drill Type Hole type

BAC431 1460856 5320779 15

18/06/2025 18/06/2025

AC Primary

BAC432 1460827 5320780 15

18/06/2025 18/06/2025

AC Primary

BAC433 1460791 5320778 12

19/06/2025 19/06/2025

AC Primary

BAC434 1461001 5320763 21

19/06/2025 19/06/2025

AC Twin

BAC435 1460658 5320890 15

19/06/2025 19/06/2025

AC Primary

BAC436 1460633 5320889 12

19/06/2025 19/06/2025

AC Primary

BAC437 1460601 5320890 12

19/06/2025 19/06/2025

AC Primary

BAC438 1460586 5320765 12

19/06/2025 19/06/2025

AC Primary

BAC439 1460613 5320765 12

19/06/2025 19/06/2025

AC Primary

BAC440 1460643 5320769 12

20/06/2025 20/06/2025

AC Primary

BAC441 1460663 5320771 12

20/06/2025 20/06/2025

AC Primary

BAC442 1460657 5320648 12

20/06/2025 20/06/2025

AC Primary

BAC443 1460630 5320649 12

20/06/2025 20/06/2025

AC Primary

BAC444 1460605 5320639 12

20/06/2025 20/06/2025

AC Primary

BAC445 1460604 5320637 12

20/06/2025 20/06/2025

AC Primary

BAC446 1460572 5320639 12

20/06/2025 20/06/2025

AC Primary

BAC447 1460538 5320643 12

20/06/2025 20/06/2025

AC Primary

BAC448 1460482 5320407 12

21/06/2025 21/06/2025

AC Primary

BAC449 1460483 5320528 12

21/06/2025 21/06/2025

AC Primary

BAC450 1460458 5320533 12

21/06/2025 21/06/2025

AC Primary

BAC451 1460481 5320646 12

21/06/2025 21/06/2025

AC Primary

BAC452 1460491 5320764 12

21/06/2025 21/06/2025

AC Primary

BAC453 1460514 5320769 12

21/06/2025 21/06/2025

AC Primary

BAC454 1460499 5320888 12

22/06/2025 22/06/2025

AC Primary

BAC455 1460533 5320884 12

22/06/2025 22/06/2025

AC Primary

BAC456 1460562 5320889 12

22/06/2025 22/06/2025

AC Primary

BAC457 1460542 5320770 12

22/06/2025 22/06/2025

AC Primary

BAC458 1460538 5320768 12

22/06/2025 22/06/2025

AC Twin

BAC459 1460510 5320646 13

22/06/2025 22/06/2025

AC Primary

BAC460 1460984 5321489 15

23/06/2025 23/06/2025

AC Primary

BAC461 1460630 5321579 12

23/06/2025 23/06/2025

AC Primary

BSN01 1460929 5321368 15

7/07/2025 7/07/2025

Sonic Twin

BSN02 1460653 5321245 12

8/07/2025 8/07/2025

Sonic Twin

BSN03 1460872 5321131 12

8/07/2025 8/07/2025

Sonic Twin

BSN04 1460678 5321009 12

9/07/2025 9/07/2025

Sonic Twin

BSN05 1460533 5320768 12

9/07/2025 9/07/2025

Sonic Twin

BSN06 1460842 5320883 15

10/07/2025 10/07/2025

Sonic Twin

BSN07 1460980 5321008 15

10/07/2025 10/07/2025

Sonic Twin

BSN08 1460840 5320663 15

11/07/2025 11/07/2025

Sonic Twin

BSN09 1460972 5320410 18

14/07/2025 14/07/2025

Sonic Twin

BSN10 1460857 5321488 12

15/07/2025 15/07/2025

Sonic Twin

BSN11 1460702 5321489 15

15/07/2025 15/07/2025

Sonic Twin

BSN12 1460552 5321490 12

15/07/2025 15/07/2025

Sonic Twin





Bradley, J., Chew, P. & Wilkins, C., 2002. Transport and distribution of magnetite and ilmenite on Westland

beaches of New Zealand; with comment on the accumulation of other high‐density minerals. Journal of

the Royal Society of New Zealand, 32, 169–181.

Force, E. R., 1991. Geology of titanium-mineral deposits, Geological Society of America.

Gazley, M., Van de Ven, M., Pocock, A., McKellar, Z., Doyle, S., Lilly, K. & Bertoli, O., 2026. Canoe Creek Mineral

Resource Estimate. RSC, Competent Person: M. Gazley, M. van de Ven.

Lee, G., 1991. Statement of Ilmenite Sand Resources at Barrytown, MR4287. Westland Ilmenite Ltd, p. 401.


Page 22 of 22

Ritchie, T. W., Scott, J. M. & Craw, D., 2019. Garnet compositions track longshore migration of beach placers in

western New Zealand. Economic Geology, 114, 513–540.

Van Gosen, B. S., Fey, D. L., Shah, A. K., Verplanck, P. L. & Hoefen, T. M., 2014. Deposit model for heavy-mineral

sands in coastal environments. US Geological Survey, 2328-0328.

Wells, H. C. & Haverkamp, R. G., 2020. Characterization of the heavy mineral suite in a holocene beach placer,

Barrytown, New Zealand. Minerals, 10, 86.


1

JORC Code, 2012 Edition – Table 1

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary

Sampling

techniques

 Nature and quality of sampling (eg cut

channels, random chips, or specific

specialised industry standard measurement

tools appropriate to the minerals under

investigation, such as down hole gamma

sondes, or handheld XRF instruments, etc).

These examples should not be taken as

limiting the broad meaning of sampling.

 Include reference to measures taken to

ensure sample representivity and the

appropriate calibration of any measurement

tools or systems used.

 Aspects of the determination of

mineralisation that are Material to the Public

Report.

 In cases where ‘industry standard’ work has

been done this would be relatively simple (eg

‘reverse circulation drilling was used to obtain

1 m samples from which 3 kg was pulverised

to produce a 30 g charge for fire assay’). In

other cases more explanation may be

required, such as where there is coarse gold

that has inherent sampling problems.

Unusual commodities or mineralisation types

(eg submarine nodules) may warrant

disclosure of detailed information.

The Cargill South Heavy Mineral (HM) Mineral Resource was estimated based on mineral

grade data from 198 aircore (AC) and 12 sonic core drillholes drilled by Tāiko (then TiGa)

during the 2025 drill campaign.

 AC drilling was used to obtain 1-m samples, which were collected through a cyclone into

polyweave bags, geologically logged, and delivered to the sample preparation laboratory

at New Zealand Institute of Metals and Minerals Research (NZIMMR, Dunollie,

Greymouth).

 Sonic samples were collected in a plastic split and placed into a core box. The sonic

drilling samples were logged and sampled based on lithology with a maximum sample

length of 1 m; whole core was placed in a polyweave sample bag and delivered to

NZIMMR.

 All samples were dried, split using a rotary splitter to reduce sample size, then wet-

screened to derive a 45-μm to 2-mm fraction (sand fraction). This fraction was then dried

and split again into three sub-samples (P1–P3) for three analytical workflows: portable X-

ray fluorescence (pXRF)/XRF (P1), sink-float analyses (P2), and scanning electron

microscope (SEM)/Automated Mineralogy (AM) (P3).

 P1 samples were pulverised for pXRF and XRF analysis. All P1 samples were analysed

by pXRF and selected P1 samples were analysed by laboratory XRF to assess the quality

of the pXRF data.

 Selected P2 samples were split using a riffle splitter and submitted for sink-float analysis.

 Selected P3 samples were split using a riffle splitter mounted in epoxy, polished and

carbon-coated for SEM analysis.

 SEM-based AM data were used to train linear regression models to derive quantitative

mineralogy estimates (grades of ilmenite, garnet and zircon), from geochemical data. The

modal mineralogy data, derived from the pXRF geochemical data, provided the main input

for the mineral resource estimate (MRE).

 P2 samples were sent for float-sink analysis to quantify the total heavy mineral (THM)

content, which was used to cross-validate the mineralogy data (derived by SEM-AM and

derived from the linear-regression models) and valuable HM content.

 Mineralisation was determined visually through geological logging and observation of dark

minerals and garnet content. Overburden is easily recognisable from the grey to dark-grey

fine sand that contains ilmenite, garnet, and zircon. All samples below overburden were


2

Criteria JORC Code explanation Commentary

analysed.

 The Competent Persons (Mathijs van de Ven, Michael Gazley) consider the sample

preparation techniques to be appropriate for the classification of a high-confidence

resource in an HMS project.

Drilling

techniques

 Drill type (eg core, reverse circulation, open-

hole hammer, rotary air blast, auger, Bangka,

sonic, etc) and details (eg core diameter,

triple or standard tube, depth of diamond

tails, face-sampling bit or other type, whether

core is oriented and if so, by what method,

etc).

 Alton Drilling conducted AC drilling using an ADL multipurpose rig, mounted on an MST-

600VD crawler, using a 3-inch hammer (~76 mm) and a 200-psi (400 cfm) compressor.

 Pro-Drill conducted sonic drilling, using a Fraste XL1 remote-tracked rig, using 150-Hz

frequency, with an inner drill bit diameter of 79 mm and outer bit diameter of 104 mm,

producing 79-mm diameter core.

Drill sample

recovery

 Method of recording and assessing core and

chip sample recoveries and results assessed.

 Measures taken to maximise sample

recovery and ensure representative nature of

the samples.

 Whether a relationship exists between

sample recovery and grade and whether

sample bias may have occurred due to

preferential loss/gain of fine/coarse material.

 The wet weight of the 1-m AC samples was captured on site and compared against a

nominal expected sample mass of 6.2 kg/m, and the weight data were checked daily for

trends that could be indicative of problems affecting the sample quality. Since some

samples were wet and others dry, it sometimes proved difficult to spot trends.

 The sample recovery was approximated during the programme using wet weights,

moisture, a generic density, and drill-bit size.

 Alton Drilling actively worked to optimise AC sample recovery and quality. The driller

paused at the end of each metre to allow the sample to fully pass through the drill string.

The sample return hose and cyclone were cleaned during each rod change. Zones with

high clast-size variability or wood were difficult for the AC bit to penetrate, typically due to

the presence of large beach stones or buried trees.

 If the assessment of the wet sample weights recorded at the rig showed undesirable

trends, this was communicated with the drillers to determine the cause of these trends and

resolve any issues.

 Despite efforts to control sample recovery during the programme, sample weights for AC

samples show a consistent increase with depth. In the Competent Persons’ (Mathijs van

de Ven, Michael Gazley) opinion, a consistent weight increase with depth for AC drilling

can be expected in saturated, unconsolidated ground, as encountered at Cargill South,

and is one of the inherent challenges with the drilling method. Dry weight data indicate

that, despite attempts to control recovery at the rig, sample mass increased progressively

with depth. Comparison with 12 sonic twin holes indicates that the median AC recovery

within the mineralised zone is ~70%; for the key domain (Sand HG), the median

calculated AC recovery was 72%, with an interquartile range of 51–104%. The Competent

Persons (Mathijs van de Ven, Michael Gazley) consider this a moderate risk with respect

to the classification of a high-confidence mineral resource. Recovery percentages for AC

samples were determined by comparison of each sample weight against an expected

weight based on a modelled density. Density was modelled for each sample as a function

of porosity and heavy mineral grade, and hence the Competent Persons were unable to


3

Criteria JORC Code explanation Commentary

assess whether a relationship exists between recovery and HM grade.

 For the sonic drilling, recovery was appraised in the field by assessing the core. Core loss

was attributed to discrete intervals in the logs, and remaining intervals were estimated to

be 100% recovered. Interval length statistics indicate that 75% of intervals had full 1-m

recovery.

Logging

 Whether core and chip samples have been

geologically and geotechnically logged to a

level of detail to support appropriate Mineral

Resource estimation, mining studies and

metallurgical studies.

 Whether logging is qualitative or quantitative

in nature. Core (or costean, channel, etc)

photography.

 The total length and percentage of the

relevant intersections logged.

 A high-quality geological logging SOP was in place. For each metre, a handful of sample

material was placed in a chip tray, logged, and photographed. The geological data

captured were both qualitative and quantitative, including lithology, grain size, colour,

rounding, clay content, garnet grade and dark heavy-mineral grade. Other details logged

included sample weight, sample moisture and depth to the water table.

 All 2025 AC and sonic drillholes at Cargill South were geologically logged.

 The Competent Persons (Mathijs van de Ven, Michael Gazley) consider the logging

procedures to be carried out to an appropriate standard to support a high-confidence

mineral resource classification.

Sub-sampling

techniques

and sample

preparation

 If core, whether cut or sawn and whether

quarter, half or all core taken.

 If non-core, whether riffled, tube sampled,

rotary split, etc and whether sampled wet or

dry.

 For all sample types, the nature, quality and

appropriateness of the sample preparation

technique.

 Quality control procedures adopted for all

sub-sampling stages to maximise

representivity of samples.

 Measures taken to ensure that the sampling

is representative of the in situ material

collected, including for instance results for

field duplicate/second-half sampling.

 Whether sample sizes are appropriate to the

grain size of the material being sampled.

 Each 1-m sample was collected in a polyweave bag and taken to the sample preparation

facility at NZIMMR

 Samples were prepared at NZIMMR. Each primary sample was passed through a

Rocklabs Boyd Elite jaw crusher and rotary splitting device (RSD) combination (first split)

and then wet screened with 2-mm and 45-μm screens (first split). The 45-μm to 2-mm

fraction (sand fraction) was then dried and split into two equal splits (P1 and P2) using an

RSD (second split).

 P1 samples were pulverised at NZIMMR to 85% passing -75 μm and then split (P1

third split) using a scoop to create a 200-g sub-sample. The sub-sample was sent

to RSC Wellington for pXRF analysis, where 20 g was extracted using a spoon (P1

fourth split, ‘many increments’ approach) and poured into a 40-mm sample cup,

with one end covered by 4-μm polypropylene film. Based on the pXRF results, for

selected samples the entire pulp back was sent to ALS Brisbane, where a 0.66-g

aliquot was scooped (P1 fifth split) for XRF analysis.

 P2 samples (~200-g) were sent to Diamantina, and split using a riffle splitter to

generate samples of ~100 g for sink-float analysis.

 P3 samples were sent to Middle Earth Petrographics, split to 15 g using a

Humboldt micro and precision riffle splitter (P2 third split), and set in a 25-mm

epoxy round. The hardened epoxy was cut in half, remounted in a 30-mm epoxy

round, to expose the two cut faces, and polished with water-soluble, polycrystalline

diamond suspension (from 3 μm down to 1 μm). The polished surface was coated

with a conductive carbon film before SEM analysis.

 The Competent Persons (Mathijs van de Ven, Michael Gazley) consider the sample


4

Criteria JORC Code explanation Commentary

preparation techniques appropriate and industry standard for heavy mineral sand (HMS)

samples.

 No screen-size testing data were available for the wet screening at NZIMMR. Residual

slime was identified in the Cargill South samples on receipt, and samples were deslimed

again prior to sub-sampling, heavy mineral separation and SEM analysis. In the

Competent Person’s (Mathijs van de Ven) opinion, the risk associated with the second

split (wet screening) is low with respect to the objective of classifying at least Indicated

mineral resources; the Competent Person (Mathijs van de Ven) recommends that

NZIMMR completes sizing tests and verifies the completeness of washing and screening

before dispatch.

 A second split duplicate sample was collected for every 20 original samples, and a P1

fourth split repeat sample was collected for every 30 original samples. A P1 fifth split

repeat sample was collected by ALS approximately every 30 original samples. No repeat

or duplicate samples were collected for the other split stages. Assessment of the

duplicate and repeat sample data demonstrates that the splits were executed

consistently.

 The Competent Persons (Mathijs van de Ven, Michael Gazley) consider the sample sizes

appropriate given the grain size of the material sampled.

Quality of

assay data

and

laboratory

tests

 The nature, quality and appropriateness of

the assaying and laboratory procedures used

and whether the technique is considered

partial or total.

 For geophysical tools, spectrometers,

handheld XRF instruments, etc, the

parameters used in determining the analysis

including instrument make and model,

reading times, calibrations factors applied

and their derivation, etc.

 Nature of quality control procedures adopted

(eg standards, blanks, duplicates, external

laboratory checks) and whether acceptable

levels of accuracy (ie lack of bias) and

precision have been established.

Portable X-Ray Fluorescence

 All P1 sub-samples were analysed at RSC using an Evident Vanta VMR portable XRF

instrument, with a 4 W, 50 kV rhodium anode and a large-area silicon-drift detector. The

instrument was operated using a field test stand and a laptop with the Vanta PC Software

(Vanta Digi Mining software version 2.1.1.0). The approach adopted by RSC follows

industry best practice, as outlined in Fisher et al. (2014) and Gazley and Fisher (2014).

Samples were analysed using 3-beam Geochem mode, with an analysis time of 15 s for

each beam.

 Blanks, seven certified reference materials (CRMs) and repeat measurements were used

for quality control. Each pXRF operator started their shift measuring the blank and seven

CRMs. After that, only one of the seven CRMs was measured, at a frequency of 1 in 20.

Repeat measurements were taken at a frequency of 1 in 20. All seven CRMs followed by

the blank were measured again at the end of each shift.

 The pXRF data were corrected using calibration plots derived from CRM results. The

calibration plots are based on the expected values of the CRM plotted against the

measured values (Fisher et al., 2014).

 The pXRF data were compared to laboratory (ALS) XRF data as a quality check. A total of

86 samples (72 AC and 14 sonic) were selected for XRF analysis that are representative

of the full range of variability of the pXRF dataset. The 0.66-g aliquot was fused with a Li-

borate flux (including Li-nitrate). Samples were analysed for whole-rock geochemistry

using ME-XRF30 + ME-GRA05, with 24 analytes (plus total and LOI). Lithium-borate


5

Criteria JORC Code explanation Commentary

fusion and XRF finish is the standard industry method for the analysis of oxide iron (Fe)

ores. ALS Brisbane is an ISO/IEC 17025 accredited laboratory, and the Competent

Person (Mathijs van de Ven) considers the risk associated with the laboratory XRF

analysis to be low.

 A comparison of the calibrated pXRF and laboratory XRF data confirmed that the pXRF

data have good precision (RMSCV of repeat analyses on the order of 1–3%). The

Competent Persons (Mathijs van de Ven, Michael Gazley) consider the calibrated pXRF

geochemical data fit for the purpose for deriving HM grade and used these data to

estimate an MRE that has a high-confidence classification.


Sink-Float Analysis

 Approximately 200 g of each of 112 samples (98 AC and 14 sonic) was sent to

Diamantina Laboratories, Perth, Western Australia, for sink-float analysis. Based on visual

inspection by Diamantina staff, the samples were deslimed again to remove residual

slime. Once the samples were fully deslimed, a sub-sample was generated using a riffle

splitter, weighed, and the HM were separated using tetrabromoethane (specific gravity,

SG = 2.92–2.96) in a static separation. Samples were then washed using acetone to

recover the float fraction and the HM fraction. Both fractions were dried and weighed. The

HM fraction was calculated based on the initial and final weights. Once dry, both fractions

were returned to RSC for SEM analysis.


Automated Mineralogy by SEM-based Energy-dispersive X-ray Spectroscopy

 The collection of quantitative mineralogical data by SEM-based energy-dispersive X-ray

spectroscopy (EDS) is known as automated mineralogy (AM). P3 sub-samples (70; 58 AC

and 12 sonic) were analysed at RSC’s Perth office in a Hitachi SU-3900 SEM, with 2

Quantax Q655-60-129 XFlash® EDS silicon-drift detectors, using Bruker’s AMICS

software to control the SEM and process the data. Analysis was undertaken in particle

mode, whereby backscatter intensity was used to segment the sample into individual

grains for EDS spot analyses, to quantify the mineralogy of the sample, in a fast and

efficient manner. The EDS spectra for each point were compared to a library of minerals.

This library of minerals was updated from the generic database, to be specific to the

Barrytown Project. A mineral was allocated to each point analysis, and thus, each area of

the sample and mineral grades were then calculated for each sample.

 As part of processing the AMICS data, a geochemical composition for each sample was

calculated from the measured mineral grades in the samples, and this was used as an

internal check on the chemistry of the minerals. No other quality control samples were

analysed.

 A comparison of paired pXRF and AM data confirmed that the AM data were sufficiently

precise in all elements included in the linear regression model, and highly precise in the


6

Criteria JORC Code explanation Commentary

elements contributing most strongly to the model (Fe, Ti and Mn). The Competent Persons

(Mathijs van de Ven, Michael Gazley) consider the AM data fit for training linear regression

models to derive quantitative mineralogy (ilmenite, garnet and zircon grades).


Linear Regression Modelling

 Linear regression models were built using the linear regression algorithm, in the scikit

learn package in Python, (sklearn.linear_model.LinearRegression) to derive quantitative

mineralogy (ilmenite, garnet and zircon grades) from geochemical data (pXRF) based on

seven elements: Ca, Fe, K, Mn, Si, Ti, Zr. SEM-derived AM data from 70 samples were

used as training data.

 The performance of the models was evaluated using test-and-train datasets with bootstrap

sampling (Python's scikit-learn machine-learning library). The performance metrics were

calculated using data previously unseen by models. Modelled mineral grades were also

compared with SEM-derived mineral grades as a check of model performance.

Verification of

sampling and

assaying

 The verification of significant intersections by

either independent or alternative company

personnel.

 The use of twinned holes.

 Documentation of primary data, data entry

procedures, data verification, data storage

(physical and electronic) protocols.

 Discuss any adjustment to assay data.

 An RSC senior geologist reviewed the logging of HMS intervals during the AC drilling

programme.

 Twelve sonic twin holes were drilled to validate the 2025 AC drilling, at a maximum

distance of ~5 m from the original AC drillholes. Sonic drilling is regarded as the superior

drilling method in unconsolidated sands and is expected to yield a superior sample. The

twin drilling data suggest a low bias in the AC HM grade values. The Wilcoxon signed-

rank test demonstrates that this bias is statistically significant (p<0.1) across minerals for

all domains except for the high-grade sand domain. The analysis is hindered by the

paucity of AC-sonic sample pairs (N=12–48). Heavy mineral grade values from AC drilling

are ~6–16% lower than grade values from sonic drilling in the high-grade sand domain

and ~6–7% lower in the high-grade dredged domain. By contrast, in the low-grade sand,

low-grade dredged and overburden domains, grade values from AC drilling are up to

100% higher than grade values from sonic drilling.

 These findings corroborate existing data from four sonic holes at the Coates South Block

and 13 sonic holes at the Canoe Creek Block. Based on the sonic data, the Competent

Person (Mathijs van de Ven) considers the AC data acceptable with respect to the

classification of an Inferred or Indicated Mineral Resource but not acceptable with respect

to the DQO of classifying a Measured Mineral Resource based on AC data alone. The

Competent Person (Mathijs van de Ven) considers that the 12 sonic drillholes are

sufficient to support classification of some Measured Mineral Resources.

 The high biases in the background domains may seem alarming. However, the

Competent Person (Mathijs van de Ven) notes that percentage differences on low-grade

domains can be misleading since the baseline grade is low. The Competent Person

emphasises that these domains contribute <30% of resource tonnage and <10% of the

contained VHM, which is primarily hosted in the high-grade sand and high-grade dredged


7

Criteria JORC Code explanation Commentary

domains. Overall, given that AC data are biased low in the key estimation domains, the

Competent Person (Mathijs van de Ven) considers the overall risk to the project is

moderate. The quality of the AC data was considered in the classification of the mineral

resource.

 No analytical data were adjusted.

Location of

data points

 Accuracy and quality of surveys used to

locate drill holes (collar and down-hole

surveys), trenches, mine workings and other

locations used in Mineral Resource

estimation.

 Specification of the grid system used.

 Quality and adequacy of topographic control.

 RSC surveyed all drill collars at drillhole completion once the drill rig had moved off the

drillhole using a handheld Garmin GPS Map67i with ~3-m accuracy. Planned collar

locations were set out in advance by Davis Ogilvy & Partners Ltd using a Trimble RTK

GNSS, typically to 0.1 m or better. Drillhole collar elevations were draped on the digital

elevation model (DEM). Because all holes were drilled vertically and are short (<30 m), no

downhole orientation surveys were completed.

 The grid system used is New Zealand Transverse Mercator 2000 (NZTM2000), which is

based on the NZGD2000 datum using the GRS80 reference ellipsoid. The vertical datum

is NZVD2016.

 A 1-m resolution DEM, with accuracy specifications of ±1.0 m (95%) horizontal and ±0.2 m

(95%) vertical, was derived from LiDAR data collected in 2020 and 2021. This is

considered high quality and adequate for a Measured classification.

Data spacing

and

distribution

 Data spacing for reporting of Exploration

Results.

 Whether the data spacing and distribution is

sufficient to establish the degree of geological

and grade continuity appropriate for the

Mineral Resource and Ore Reserve

estimation procedure(s) and classifications

applied.

 Whether sample compositing has been

applied.

 Holes were drilled on a grid with a line spacing of 120 m (N–S) and hole spacing of 30 m

(E–W).

 In the Competent Persons’ (Mathijs van de Ven, Michael Gazley) opinion, drillhole and

downhole sample spacing and distribution are sufficient to establish the degree of

geological and grade continuity appropriate for the mineral resource estimation

procedures and classifications applied.

Orientation of

data in

relation to

geological

structure

 Whether the orientation of sampling achieves

unbiased sampling of possible structures and

the extent to which this is known, considering

the deposit type.

 If the relationship between the drilling

orientation and the orientation of key

mineralised structures is considered to have

introduced a sampling bias, this should be

assessed and reported if material.

 All holes were drilled vertically, which is approximately perpendicular to the sub-horizontal

mineralised sands; hence, sampling is considered unbiased with respect to the sampling

orientation.


8

Criteria JORC Code explanation Commentary

Sample

security

 The measures taken to ensure sample

security.

 Alton Drilling staff placed a metal sample tag into the polyweave sample bag, then closed

the bag with a zip tie, which was attached by a second zip tie to a duplicate metal sample

tag labelled with the sample number. Alton Drilling staff then transferred samples and a

chip tray from the rig to the sample storage area at the end of each drillhole. The drillhole

was logged using the chip tray in the storage area, and sample bags were then batched

and delivered by RSC staff to NZIMMR within 24 hours of drillholes being completed. At

NZIMMR, sample submission batches were placed into large polyweave bulka bags,

which were then closed to protect drill samples from the weather. A securely locked gate

at NZIMMR restricts access to the site.

Audits or

reviews

 The results of any audits or reviews of

sampling techniques and data.

 The Competent Person (Michael Gazley) responsible for the exploration data is a

geologist from RSC, who visited the site in July 2025 to audit/review the sampling

techniques and data collection procedures employed on site.


Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary

Mineral

tenement and

land tenure

status

 Type, reference name/number, location and

ownership including agreements or material

issues with third parties such as joint

ventures, partnerships, overriding royalties,

native title interests, historical sites,

wilderness or national park and

environmental settings.

 The security of the tenure held at the time of

reporting along with any known impediments

to obtaining a licence to operate in the area.

 The Cargill South Mineral Resource is located in the south of the Barrytown Flats, West

Coast, New Zealand, and is fully contained within mining permit (MP) 60785, which grants

Tāiko the right to mine Crown-owned gold, garnet, ilmenite and zircon. Non-statute

minerals of interest (ilmenite, garnet, zircon) in the Cargill South Block are primarily

Crown-owned, except for some private land parcels where these minerals are privately

owned. Approximately 11% of the Cargill South Block consists of privately held minerals.

 Mining permit 60785 has an expiry date of 20 July 2042. The Competent Person (Michael

Gazley) has reviewed the relevant access arrangements and is satisfied that Tāiko has

sufficient landowner permission to access the Barrytown Project area. Mining of the Cargill

South Block is subject to the granting of resource consents; a substantive application

under the Fast-track Approvals Act 2024, covering the Canoe Creek, Barrytown Farms,

and Cargill South blocks, was lodged on 8 June 2026 and accepted as complete on 29

June 2026, and no decision had been issued as at the effective date of the MRE (11

October 2026).

Exploration

done by other

parties

 Acknowledgment and appraisal of exploration

by other parties.

 Since the late 1860s, gold has been prospected and mined from the Barrytown area and

involved bucket line dredging and small sluice operations that worked the terraces along

the Barrytown Flats.

 Records indicate that targeted Au exploration of the wider Barrytown Flats, including


9

Criteria JORC Code explanation Commentary

drilling, commenced in the 1930s as dredging in the area began to decline. Exploration in

the 1930s and 1940s was conducted by NZ Gold Options (1931–1932), NZ Prospecting

and Mining Ltd (1935–1937), Whites Electric Dredging Company (1936–1941) and

Barrytown Dredging Company Ltd (1937–1945). Within the Cargill South Block, Barrytown

Dredging Company Ltd drilled 39 holes (444.1 m) and three keystone sampler holes

(33.98 m, 1937–1938), New Zealand Gold Options Ltd drilled three keystone sampler

holes (23.47 m, 1932) and six other holes (48 m), and Carpentaria Exploration Company

drilled six holes (75.5 m), all targeting Au.

 From the 1960s, investigating ilmenite potential became the main objective of work on the

Barrytown flats, including efforts by Carpentaria Exploration Company, Mineral Resources

(NZ) Ltd, Amax Exploration NZ Ltd, Fletcher Challenge and North Broken Hill Peko

Limited (later known as Westland Ilmenite Ltd).

 Carpentaria Exploration Company drilled six churn holes (75.59 m) targeting HMS within

the Cargill South Block from 1968–1973. By March 1972, Carpentaria had produced 167

tonnes of ilmenite in pilot-scale production at Barrytown; no records are available detailing

the source of the mined material.

 In the mid-1980s (1985–1986), Fletcher Challenge drilled four churn holes (28.5 m;

BPR0098–BPR0101) targeting Au within the Cargill South Block.

 In August 2013, Pacific Mineral Resources drilled 16 AC holes (250 m; WTBT029–

WTBT044) targeting HMS within the Cargill South Block. Historical drillhole information

was not used to inform the Cargill South MRE due to data quality limitations.

 In 2008, NZ Gold undertook an airborne geophysical survey of the Barrytown Flats,

comprising magnetic and radiometric data.

Geology

 Deposit type, geological setting and style of

mineralisation.

 The Barrytown Project is a HMS deposit located on the western coast of the South Island

of New Zealand.

 The Barrytown shoreline beach deposits are quartz, feldspar, lithic (mostly grey schist

fragments) sands that contain elevated HM grades, predominantly garnet and ilmenite

with minor zircon and Au.

 The HM have been concentrated in a series of beach strandlines and are typically

considered to have originated from the Alpine Schist of the Southern Alps, transported to

the coast by rivers, mostly to the south of the Barrytown Project, and transported north by

longshore drift. Drilling at Barrytown has confirmed three broad north-trending zones of

concentrated HM, coincident with buried shorelines, which overlie gravel and marine sand

units. Part of the Cargill South Block was historically dredge-mined, which has mixed and

redistributed the sand in that portion of the block.

 The HM-bearing sands developed along, and behind, the beachfront in sandy barriers

transported by longshore drift and pushed up from the sea by wave action. These sandy

barrier deposits have become stranded as the coastline prograded, allowing lagoonal


10

Criteria JORC Code explanation Commentary

deposits to accumulate in the swales along the eastern side of the barriers. This

depositional process has had the effect of producing elongated zones of HM enrichment

on the former beaches, being surrounded by lower-grade finer sands and silty sediments

in the swales.

Drill hole

Information

 A summary of all information material to the

understanding of the exploration results

including a tabulation of the following

information for all Material drill holes:

o easting and northing of the drill hole collar

o elevation or RL (Reduced Level –

elevation above sea level in metres) of the

drill hole collar

o dip and azimuth of the hole

o down hole length and interception depth

o hole length.

 If the exclusion of this information is justified

on the basis that the information is not

Material and this exclusion does not detract

from the understanding of the report, the

Competent Person should clearly explain

why this is the case.

 A total of 2,825 metres were drilled in 210 holes during May–July 2025, including 198 AC

holes (BAC264–461) for a total of 2,660 m, and 12 sonic holes for a total of 165 m.

 AC holes have an average depth of 13.4 m.

 No downhole surveys were conducted on any holes due to the vertical orientation of the

drillholes, and shallow nature of the drilling (<30 m).

 Drillhole information, including collar locations, elevations and lengths, are stored in the

Project database.

Data

aggregation

methods

 In reporting Exploration Results, weighting

averaging techniques, maximum and/or

minimum grade truncations (eg cutting of

high grades) and cut-off grades are usually

Material and should be stated.

 Where aggregate intercepts incorporate short

lengths of high grade results and longer

lengths of low grade results, the procedure

used for such aggregation should be stated

and some typical examples of such

aggregations should be shown in detail.

 The assumptions used for any reporting of

metal equivalent values should be clearly

stated.

 No Exploration Results (such as drillhole intersections) are reported.

 No aggregation, cutting or averaging were employed.

 No metal or mineral equivalent grades are reported.

Relationship

between

mineralisatio

n widths and

 These relationships are particularly important

in the reporting of Exploration Results.

 If the geometry of the mineralisation with

 No Exploration Results are reported.

 The HM were concentrated in relatively flat-lying shoreline deposits that have been

intersected by vertical drillholes sampled in 1 m intervals. The drillhole intersections are


11

Criteria JORC Code explanation Commentary

intercept

lengths

respect to the drill hole angle is known, its

nature should be reported.

 If it is not known and only the down hole

lengths are reported, there should be a clear

statement to this effect (eg ‘down hole length,

true width not known’).

considered to represent true widths to <1 m of the mineralisation widths.

Diagrams

 Appropriate maps and sections (with scales)

and tabulations of intercepts should be

included for any significant discovery being

reported These should include, but not be

limited to a plan view of drill hole collar

locations and appropriate sectional views.

 Plan view maps, geological cross-sections and various other figures are included in the

associated announcement to demonstrate the geological context and relationship between

drillholes and mineralisation.

Balanced

reporting

 Where comprehensive reporting of all

Exploration Results is not practicable,

representative reporting of both low and high

grades and/or widths should be practiced to

avoid misleading reporting of Exploration

Results.

 No exploration results are being reported.

Other

substantive

exploration

data

 Other exploration data, if meaningful and

material, should be reported including (but

not limited to): geological observations;

geophysical survey results; geochemical

survey results; bulk samples – size and

method of treatment; metallurgical test

results; bulk density, groundwater,

geotechnical and rock characteristics;

potential deleterious or contaminating

substances.

 The presence and orientations of HM strandlines were previously interpreted in

geophysical surveys, and drilling has confirmed these interpretations.

 Metallurgical test work in 2017 established a process flowsheet for the HMS —

incorporating screening, gravity, electrostatic and magnetic separation — that

demonstrated ilmenite and garnet products could be produced. Bulk samples collected

from the Coates South Block in 2022 were tested by IHC Robbins (London, 2023), and

test work on a bulk sample from the Canoe Creek Block is ongoing.

 Mineral composition and inclusion data were collected by quantitative EDS in 2025 on

samples from the adjacent Canoe Creek Block; no systematic variation in garnet

chemistry was identified between strandlines, and this work was not repeated for Cargill

South. Results from the Canoe Creek Block confirmed the garnet population is dominated

by almandine, along with a more spessartine-like composition and a population

intermediate between the two. The median grain size for garnet in the sand fraction is ~90

μm. Ilmenite grains in the Barrytown deposit contain multiple large inclusions of other

minerals e.g. albite, epidote, titanite, quartz. The median grain size for ilmenite in

screened samples is ~75 μm.

Further work

 The nature and scale of planned further work

(eg tests for lateral extensions or depth

extensions or large-scale step-out drilling).

 Diagrams clearly highlighting the areas of

 Feasibility work, including metallurgical testing and environmental studies, is ongoing.

 Resource consenting for the Barrytown Project is ongoing; the Cargill South Block is

included in the substantive Fast-track Approvals Act 2024 application lodged in June

2026.


12

Criteria JORC Code explanation Commentary

possible extensions, including the main

geological interpretations and future drilling

areas, provided this information is not

commercially sensitive.

 Drilling is planned in the Newall Block, which aims to test the continuity of mineralisation

between Canoe Creek in the north to Barrytown Farms in the south. The Competent

Persons recommends a regular (~120 m x 90 m spaced) sonic drill programme at Cargill

South (as well as at the Newall, Barrytown Farms, Canoe Creek, and Coates South

blocks) to further resolve the grade bias in the AC data. A pit optimisation specific to the

Cargill South Block would be required to support Ore Reserve estimation.

Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

Criteria JORC Code explanation Commentary

Database

integrity

 Measures taken to ensure that data has not

been corrupted by, for example, transcription

or keying errors, between its initial collection

and its use for Mineral Resource estimation

purposes.

 Data validation procedures used.

 Data from the 2025 drilling programme are stored in a Microsoft Access database

maintained by RSC. Validation scripts were used when importing data. Additional

automatic error identification and visual data checks were performed when the drilling data

were imported into Leapfrog Geo.

Site visits

 Comment on any site visits undertaken by

the Competent Person and the outcome of

those visits.

 If no site visits have been undertaken

indicate why this is the case.

 On 10–11 July 2025, Michael Gazley, RSC’s General Manager Geoscience and

Exploration, visited the site and observed the on-site drilling and sampling procedures,

and the sample preparation procedures at the NZIMMR facility. Dr Gazley checked

whether all processes were performed in conformance with SOPs and checked core trays

and chip trays against the database and logging sheets.

 On behalf of the Competent Persons (Mathijs van de Ven, Michael Gazley), Sean Doyle,

planned and managed field exploration activities at the Cargill South Block from March

2025 to July 2025. Mr Doyle was on site from 10–12 April, 4–9 May, 20–28 May, and 8–19

June 2025, and ensured that the processes on site were completed in accordance with the

relevant standard operating procedures (SOPs).

 Dr Gazley and Mr Doyle checked whether all processes conformed to standard operating

procedures (SOPs) and industry standards, and checked chip trays against the database

and logging sheets. In the Competent Person’s (Michael Gazley) opinion, the procedures

were appropriate, followed industry standard and, in most cases represented good

practice.

Geological

interpretation

 Confidence in (or conversely, the uncertainty

of) the geological interpretation of the mineral

deposit.

 Nature of the data used and of any

assumptions made.

 The 2025 drilling campaign confirmed the presence of a contiguous shoreline deposit

within the Cargill South Block, within a well-understood framework of the Barrytown Flats.

Geological continuity is straightforward between drillholes, and the deposit is not

structurally complex. The Competent Persons (Michael Gazley, Mathijs van de Ven) are

confident in the geological interpretation.


13

Criteria JORC Code explanation Commentary

 The effect, if any, of alternative

interpretations on Mineral Resource

estimation.

 The use of geology in guiding and controlling

Mineral Resource estimation.

 The factors affecting continuity both of grade

and geology.

 Grade continuity is dependent on the orientation of strandlines and second-order

strandlines, as evidenced in the drilling and geophysical data. Heavy mineral deposition in

a marine placer environment is controlled by the supply of minerals through physical

weathering, the downstream persistence of the minerals, their availability in the fluvial and

marine environments, and the depositional sorting process to concentrate the HMs. The

most effective mineral enrichment process occurs during storms or other periods of high

wave energy, ultimately resulting in a sequence of fine sand laminations of heavier and

lighter minerals.

 Factors affecting the geological and grade continuity would be local variances not

captured at the current drill spacing and secondary erosional and depositional processes

disturbing the geological continuity.

 Three primary geological domains were interpreted based on lithological logging and

downhole pXRF data from the 2025 drilling campaign: clay-rich overburden, mixed (sand

+ clay), and sand. The ratio of Rb/Sr (~1.4) was used to model the boundary between the

clay-rich zones and clay-poor sand. A non-primary, non-geological domain was also

modelled for the portion of the block that was historically dredge mined. Using aerial

photography, an outline was interpreted for the dredged area which was consistent with

the grade data.

 Given the well-understood geological setting and the high data density, alternative

interpretations of the geology are not likely to deviate much from the current geological

model and are unlikely to materially impact the MRE.

Dimensions

 The extent and variability of the Mineral

Resource expressed as length (along strike

or otherwise), plan width, and depth below

surface to the upper and lower limits of the

Mineral Resource.

 The MRE is constrained within the Cargill South blockmodel which spans 1,400 m across

strike (E-W), and 1,740 m along strike (N-S) and down to 40 m maximum depth.

 The MRE was constrained below 0.4 m of topsoil and limited to a depth of 12 m to meet

reasonable prospects for eventual economic extraction (RPEEE)

Estimation

and

modelling

techniques

 The nature and appropriateness of the

estimation technique(s) applied and key

assumptions, including treatment of extreme

grade values, domaining, interpolation

parameters and maximum distance of

extrapolation from data points. If a computer

assisted estimation method was chosen

include a description of computer software

and parameters used.

 The availability of check estimates, previous

estimates and/or mine production records

and whether the Mineral Resource estimate

takes appropriate account of such data.

 The Cargill South MRE was estimated using a combination of ordinary kriging (OK) and

kriging with variance of measurement error (KVME) and was informed by 1-m composites

of AC and sonic data. Estimation wireframes were not constrained laterally; extrapolation

was constrained to within 50% of the drillhole spacing for blocks classified in the

Measured and Indicated categories, and to 100–150% of the drillhole spacing for blocks

classified as Inferred. Forty-six sonic drill intervals <1 m were composited to 1 m.

 Modal mineralogy data (grades of ilmenite, garnet and zircon) modelled from pXRF

analyses on the sand fraction (45-μm to 2-mm fraction), are the main input into the MRE.

Size fraction proportions (proportion of 45-μm to 2-mm fraction) derived from sample

weight data provide the second key input.


Heavy Mineral Grade


14

Criteria JORC Code explanation Commentary

 The assumptions made regarding recovery of

by-products.

 Estimation of deleterious elements or other

non-grade variables of economic significance

(eg sulphur for acid mine drainage

characterisation).

 In the case of block model interpolation, the

block size in relation to the average sample

spacing and the search employed.

 Any assumptions behind modelling of

selective mining units.

 Any assumptions about correlation between

variables.

 Description of how the geological

interpretation was used to control the

resource estimates.

 Discussion of basis for using or not using

grade cutting or capping.

 The process of validation, the checking

process used, the comparison of model data

to drill hole data, and use of reconciliation

data if available.

 Geological domains form a good first-order approximation of the mineralised domains, but

do not constitute robust domains for estimation. The geological sand and non-geological

dredge domains were refined based on a bimodality in the HM grade data into high-grade

and low-grade sand and dredged domains. The high-grade sand and high-grade dredged

domains were modelled at a nominal 8% garnet cut-off, refined spatially to match

interpreted geological continuity.

 Heavy mineral mineralisation is hosted primarily in the high-grade sand and high-grade

dredged domains (72% of MRE tonnes), with minor HM contained within the low-grade

sand, low-grade dredged, mixed and overburden domains.

 A 3-D block model consisting of 20 m x 60 m x 1 m (x-y-z) parent blocks and sub-blocked

to 5 m x 15 m x 0.5 m was used based on drill spacing (30 m E–W, 120 m N–S). Blocks

were estimated using 3 x 5 x 1 (x-y-z) discretisation points.

 Heavy mineral grade values were composited to 1-m intervals. Top caps were not applied

in the high-grade sand and high-grade dredged domains, but were applied in the

overburden, mixed, low-grade sand and low-grade dredged domains to prevent the

influence of extreme grades and to partially address the known positive bias in the AC

data in these domains. Capping values were selected with reference to the sonic

population statistics.

 Variograms were modelled on 1-m composites and are characterised by low nugget effect

ratios (≤0.1 in the high-grade domains; ≤0.4 in the background domains) and ranges of

150–830 m along the major axis. Downhole smearing in the AC data may result in a low

bias in modelled nugget ratios; sensitivity testing on the modelled nugget ratios indicated

an impact of <0.2% on tonnes and grade of Measured and Indicated blocks. The same

variogram was used for ilmenite, garnet and zircon.

 The interpolation of HM grade into blocks was completed using a single search passes,

using a minimum of four and a maximum of 24 samples. Over 99.9% of blocks was filled

on the first pass. Blocks requiring two search passes are located near the edge of the

informing data. The search ellipsoid was optimised based on drill spacing and available

samples to find sufficient samples for estimation. First-pass search ellipsoids were ~300 m

x 130 m x 10 m for the primary mineralised domains. Second-pass search ellipsoids were

twice the size of the first ellipsoid. All domain boundaries were implemented as hard

boundaries.

 For the overburden, mixed, low-grade sand and low-grade dredged domains, HM grades

were estimated using OK in Seequent Leapfrog Edge. For the high-grade sand and high-

grade dredged domains, HM grades were estimated using KVME in Isatis Neo. The KVME

approach was selected based on the observation that HM grades from AC data are biased

low compared to twin sonic intervals (Section 1). The variance of measurement errors, 퐶휖,

can then be used in the kriging system to increase the variance of pairs of independent

AC measurements made at the same location (diagonal of the kriging matrix), which


15

Criteria JORC Code explanation Commentary

translates to a lower weight being placed on AC samples vs Sonic samples, everything

else being equal. The sonic mean kriging variance obtained from this step was used as

the variance of measurement error, 퐶휖, for the KVME implementation of each grade

variable. The variance of measurement error, 퐶휖, was set to 42.31 for ilmenite, 72.01 for

garnet and 0.01836 for zircon in the sand domain and 28.02 for ilmenite, 68.64 for garnet,

and 0.01529 for zircon in the dredge domain.

 The grade of valuable heavy minerals (VHM) has been calculated for each block as the

sum of the ilmenite, garnet and zircon grade. The THM grade, which includes VHM and

other heavy minerals (e.g. epidote, apatite), was determined for each interval as the sum

of ilmenite, garnet, zircon, allanite, Fe-oxide, epidote, rutile, titanite and monazite

(calculated from pXRF data) contained within the particle size range of 45 μm to 2 mm

and estimated in the blocks by ordinary kriging.

 No production data are available to reconcile the HM grades of the MRE. The KVME

method was not trialled for the background domains, given poor results in the background

domains in the Canoe Creek estimate. Sensitivity checks were run on modelled nugget

ratios and on the use of assigned, estimated and calculated densities, and found to have

minimal impact.

 No deleterious elements or minerals were estimated. The impact of mineral composition

and impurities was considered and determined to be insignificant to the proposed product

specifications.

 Block model HM grades were validated by comparing the input mean grades with the

block model mean grade, through review of swath plots, and by visual validation on cross-

section. For the high-grade sand and high-grade dredged domains, KVME mean grades

are 2–11% higher than the global composite mean (sonic + AC), but 5–22% lower than

the composite mean of the declustered sonic data.

 The Competent Person (Mathijs van de Ven) considers that the parameters, and use of

OK and KVME, represent a suitable estimation technique at this stage of the Project; it

honours the spatial continuity of the estimated variables, provides the best-unbiased

estimate and minimises the predicted error variance. The Competent Person (Mathijs van

de Ven) attributes the biases detailed above relative to the sonic data to biases in the

informing data, rather than the estimation method. The KVME aims to reweight sample

data to address this bias but is hindered by the paucity of sonic twin drilling at the project

(~6% twin rate). The Competent Person (Mathijs van de Ven) recommends that additional

twin drilling is completed at Cargill South to obtain a twin proportion of at least 20%.


Grainsize Fractions

 The grainsize proportions (<45 μm, 45 μm–2 mm and >2 mm, i.e. slimes, sand, and

oversize fraction) were estimated using OK from 1-m composites in Seequent Leapfrog

Edge. The grainsize proportions were calculated by dividing size fraction weights,


16

Criteria JORC Code explanation Commentary

obtained at NZIMMR, by dry sample weights. Weights of the slimes fraction were not

collected, and the proportion of slimes was determined based on total dry weight and the

combined weight of the other two size fractions. As a result, the size fractions are

interdependent (i.e. sum up to 100%) and the same estimation parameters were used for

each size fraction).

 The geological domains (overburden, mixed, sand, dredged) were used to estimate the

size fractions.

 No top-caps were applied due to the interdependent nature of the grain size fractions.

 Variograms were modelled on raw data of the sand fraction (mean ~50% of the sample;

~60% in the sand domain) and are characterised by moderate nugget effect ratios (0.20–

0.30) and ranges (150–400 m along major axis). Variograms were modelled based on the

product fraction, which shows the most structure, and the same variogram was applied to

the other size fractions within the same estimation domain to honour the interdependent

nature of the grain size fractions.

 The interpolation of grain size fractions into blocks was completed using a double-pass

search strategy with a minimum of four and a maximum of 32 samples; >99% of blocks

were estimated in the first pass. The search pass was optimised based on drill spacing

and available samples to find sufficient samples for estimation. The first-pass search

ellipsoid was ~300 m x 130 m x 10 m (minor range of 5 m in the dredge domain), and the

second-pass ellipsoid ~600 m x 260 m x 20 m. All domain boundaries were implemented

as hard boundaries based on observation of a sharp contact in downhole plots.

 No production data were available to reconcile the size fractions of the MRE.

Moisture

 Whether the tonnages are estimated on a dry

basis or with natural moisture, and the

method of determination of the moisture

content.

 Tonnages, HM grades, and size proportions are based on dry sample weight basis.

Cut-off

parameters

 The basis of the adopted cut-off grade(s) or

quality parameters applied.

 The Cargill South deposit is anticipated to be mined by dredging and due to high water

levels, dredging will commence from surface after stripping the topsoil. The anticipated

mining selectivity is low and a reporting cut-off of 0.0% would be more appropriate.

 Previous reported mineral resources for the Barrytown Flats Project have been reported at

a grade cut-off of 1.0% ilmenite that was determined in a feasibility study (London, 2023)

for Coates South (located ~5 km north of the Cargill South Block), and the same cut-off

was used for the Canoe Creek MRE (Pocock et al., 2026). That cut-off was based on a

conventional open-pit operation and assumed operating costs and HM recoveries.

 For consistency of reporting, the Competent Person (Mathijs van de Ven) has reported the

Cargill South MRE at a 1.0% in-situ ilmenite cut-off grade.


17

Criteria JORC Code explanation Commentary

Mining

factors or

assumptions

 Assumptions made regarding possible mining

methods, minimum mining dimensions and

internal (or, if applicable, external) mining

dilution. It is always necessary as part of the

process of determining reasonable prospects

for eventual economic extraction to consider

potential mining methods, but the

assumptions made regarding mining

methods and parameters when estimating

Mineral Resources may not always be

rigorous. Where this is the case, this should

be reported with an explanation of the basis

of the mining assumptions made.

 The Competent Person (Mathijs van de Ven) has evaluated preliminary mining,

metallurgical, economic, environmental, social and geotechnical parameters established in

preliminary or internal, pre-feasibility and feasibility studies (Banaszak et al., 2018;

London, 2023) that have investigated various mining and processing methods for

extracting and concentrating the ilmenite, garnet, and zircon. The proposed method is a

bulk mining method (dredging or excavator) with low mining selectivity. A high level of

mining recovery of the sand unit (>95%) is assumed.

 AMC Consultants completed a preliminary pit optimisation on the Canoe Creek MRE,

based on a dredge mining operation. An equivalent optimisation was not completed for

Cargill South; instead, based on the Canoe Creek results, the Competent Person (Mathijs

van de Ven) has excluded blocks that do not have reasonable prospects for eventual

economic extraction (RPEEE). Specifically, the Competent Person (Mathijs van de Ven)

has excluded blocks from the MRE that are:

 more than 12 m from surface;

 within a 50-m standoff zone from a protected natural reserve or shoreline; or

 less than 40 cm from surface (topsoil).

Metallurgical

factors or

assumptions

 The basis for assumptions or predictions

regarding metallurgical amenability. It is

always necessary as part of the process of

determining reasonable prospects for

eventual economic extraction to consider

potential metallurgical methods, but the

assumptions regarding metallurgical

treatment processes and parameters made

when reporting Mineral Resources may not

always be rigorous. Where this is the case,

this should be reported with an explanation of

the basis of the metallurgical assumptions

made.

 The metallurgical assumptions for the Cargill South MRE have been based on the

metallurgical assumptions applied to the Coates South Block and Canoe Creek Block

MREs, which are located ~5 km and ~3 km north of the Cargill South Block respectively.

The Competent Persons (Mathijs van de Ven, Michael Gazley) consider the three deposits

to be geologically very similar.

 The metallurgical parameters established for Coates South Block were based on

2016/2017 and 2022 metallurgical testing results, which demonstrated reasonable

pathways to produce marketable concentrates containing ilmenite, garnet and zircon.

These pathways included screening, desliming, dry magnetic/electrostatic and wet gravity

mineral separation processes.

Environmen-

tal factors or

assumptions

 Assumptions made regarding possible waste

and process residue disposal options. It is

always necessary as part of the process of

determining reasonable prospects for

eventual economic extraction to consider the

potential environmental impacts of the mining

and processing operation. While at this stage

the determination of potential environmental

impacts, particularly for a greenfields project,

 Anticipated mine plans propose minimal use of reagents to minimise environmental risk;

for example, dewatering tailings by a cyclone before discharging into the mining void, and

capping tailings using overburden material.

 Tāiko has completed various environmental studies and plans as part of its mining

resource consent applications at Coates South Block, and the Competent Persons

(Mathijs van de Ven, Michael Gazley) assume that most of these findings will apply at

Cargill South. Groundwater levels are high and the Cargill South Block is very wet for

large parts of the year; effective groundwater management, including of run-off in relation

to surrounding areas of environmental sensitivity, will be key to successful mining. A


18

Criteria JORC Code explanation Commentary

may not always be well advanced, the status

of early consideration of these potential

environmental impacts should be reported.

Where these aspects have not been

considered this should be reported with an

explanation of the environmental

assumptions made.

hydrogeological study was completed across the Barrytown Project area in 2022.

 The Competent Persons (Mathijs van de Ven, Michael Gazley) consider that Tāiko is

working towards an outcome where it is more likely than not that resource consent to mine

the Cargill South Block will be granted. A substantive application under the Fast-track

Approvals Act 2024 was lodged on 8 June 2026 and accepted as complete on 29 June

2026. The Competent Persons (Mathijs van de Ven, Michael Gazley) note that if resource

consents are not granted, it could negatively affect the prospects of eventual economic

extraction.

Bulk density

 Whether assumed or determined. If

assumed, the basis for the assumptions. If

determined, the method used, whether wet or

dry, the frequency of the measurements, the

nature, size and representativeness of the

samples.

 The bulk density for bulk material must have

been measured by methods that adequately

account for void spaces (vugs, porosity, etc),

moisture and differences between rock and

alteration zones within the deposit.

 Discuss assumptions for bulk density

estimates used in the evaluation process of

the different materials.

 Dry bulk density data were collected for 182 sonic core drill samples using the sample

weight method. An SOP was in place for the collection of data to allow for bulk density

determination. Bulk density was calculated based on the length of the sample, the

diameter of the sonic drill bit, and the dry weight of the sample as measured by NZIMMR.

 After comparison with densities calculated from HM grade and porosity, 58 unreliable

measurements were excluded (half-cored, dry weight exceeding wet weight, or samples

under 5,000 g), leaving 124 measurements for assigning density by domain.

 The following median in-situ dry bulk densities were assigned by estimation domain to

calculate material tonnage: 1.49 g/cm

3

for the clay-rich overburden; 1.88 g/cm

3

for the

dredge domain; 2.01 g/cm

3

for the low-grade sand and mixed domains; and 2.35 g/cm

3

for

the high-grade sand.


Classification

 The basis for the classification of the Mineral

Resources into varying confidence

categories.

 Whether appropriate account has been taken

of all relevant factors (ie relative confidence

in tonnage/grade estimations, reliability of

input data, confidence in continuity of

geology and metal values, quality, quantity

and distribution of the data).

 Whether the result appropriately reflects the

Competent Person’s view of the deposit.

 In accordance with Clause 49 of the JORC Code (2012), the likely product and its

specifications have been considered. The specified products are individual concentrates

rich in ilmenite, garnet and zircon recovered from the 45 μm to 2 mm size fraction. The

Mineral Resource is reported in terms of the minerals on which the Project is based and

includes the specifications of these minerals.

 The garnet, ilmenite, zircon and VHM Mineral Resources have been classified in the

Measured, Indicated and Inferred categories.

 The Measured portion of the resource has been determined from an assessment of data

quality, drillhole spacing, geological and grade continuity. Blocks that are in the high-grade

sand or high-grade dredged domains and less than 100 m from a sonic drill hole were

classified in the Measured category. Geological evidence is derived from adequately

detailed and reliable exploration, sampling and testing collected through appropriate

techniques from drillholes. Analysis of samples consisted of pXRF, XRF, SEM-based

automated mineralogy and sink float tests and is sufficient to confirm geological and grade

continuity between points of observation, where data and samples were collected.

Although AC data are biased low in these domains, the Competent Person deems a

Measured classification appropriate for this portion because the tenor of bias is


19

Criteria JORC Code explanation Commentary

constrained by 12 sonic twin holes to be a low bias, the likely impact of the bias is a

conservative estimate, and a grade re-weighting has been applied through the KVME

estimation method.

 Blocks within a perimeter representing half the average drillhole spacing but not meeting

the Measured criteria were classified in the Indicated category. For this portion of the MRE,

evidence is sufficient to assume, but not confirm, geological and grade continuity.

 Blocks that are outside the half drillhole spacing perimeter but within a perimeter

representing one drillhole spacing were classified in the Inferred category. For this portion

of the MRE, geological evidence is sufficient to imply but not verify geological and grade

continuity.

Audits or

reviews

 The results of any audits or reviews of

Mineral Resource estimates.

 RSC consultants estimated the Cargill South Mineral Resource. Internal peer review was

completed at various stages and issues were remedied as, and when, encountered.

Discussion of

relative

accuracy/

confidence

 Where appropriate a statement of the relative

accuracy and confidence level in the Mineral

Resource estimate using an approach or

procedure deemed appropriate by the

Competent Person. For example, the

application of statistical or geostatistical

procedures to quantify the relative accuracy

of the resource within stated confidence

limits, or, if such an approach is not deemed

appropriate, a qualitative discussion of the

factors that could affect the relative accuracy

and confidence of the estimate.

 The statement should specify whether it

relates to global or local estimates, and, if

local, state the relevant tonnages, which

should be relevant to technical and economic

evaluation. Documentation should include

assumptions made and the procedures used.

 These statements of relative accuracy and

confidence of the estimate should be

compared with production data, where

available.

 The Mineral Resource is a global estimate.

 The confidence in the Mineral Resource is reflected in the Measured, Indicated and Inferred

classification which has been based on the drillhole spacing, data quality, and an

assessment of geological and grade continuity.

 Confidence in the accuracy of grade estimates is influenced by the known bias in the AC

data. The Competent Person considers the estimate of HM conservative in the high-grade

domains and notes that that blocks classified as Measured may be subject to a HM grade

low bias of up to 4 percentage points (median block grade < median sonic grade). The

Competent Person also notes a risk of overestimation in the low-grade domains, where

KVME grade re-weighting was not used. The Competent Person acknowledges that

Indicated blocks in the low-grade domains may be subject to a HM grade high bias of up to

3 percentage points (median block grade > median sonic grade). The low-grade domains

constitute <50% of Indicated tonnes and <20% of Indicated contained VHM and <10% of

the total contained VHM. The Competent Person considers this a low- to moderate risk the

project.

 The Competent Person (Mathijs van de Ven) considers the block model to be appropriately

estimated based on the validation of input and estimated grades through visual assessment,

domain grade-mean comparisons, and a review of swath plots.

 No production data are available for comparison.

Data sourced from publicly available filings. Our datasets may not be complete. Automated analysis can produce errors. If you believe any data on this page is incorrect, please contact us at hello@nzxplorer.co.nz. For informational purposes only. Not investment advice.

Other issuers discussed similar conditions around this time

Matched by meaning across NZX announcement text, not keywords — based on our semantic index of announcement bodies.