Taiko Critical Minerals Limited (NZX: TCM) filed “Amended Quarterly Activities & Cash Flow Report - Sep 26” with NZX on 21 October 2026, as a quarterly update announcement.

When was it filed?
21 October 2026
Where is the original?
NZX announcement
Taiko Critical Minerals Limited logo

Amended Quarterly Activities & Cash Flow Report - Sep 26

Quarterly Update21 October 2026TCMMaterials

NZX and Media Release
22 October 2026





Quarterly Activities and Cashflow Report – September 2026

Taiko Critical Minerals Limited (NZCN: 5824110)

c/o PriceWaterhouseCoopers, Level 26 PwC Tower, 15 Customs Street West,

Auckland Central, Auckland 1010, New Zealand

www.taikocm.co.nz


 $20m Regional Infrastructure Fund Loan Offered by NZ Government

 Placement and Share Purchase Plan Raises $9.5m

 Cargill South Mineral Resource Estimate Reported

 Updated Mineral Resource Statement Issued

 Fast Track Application on Track for Decision 8 December 2026


NZ Government Offers Regional Infrastructure Fund (RIF) Loan

1

The Government has offered to provide financial assistance of up to $20 million towards

funding the wet concentrator plant planned as part of its Barrytown Critical Minerals Project.

The Company is currently engaged with Government officials to determine the format, terms

and conditions of the proposed Government assistance.

This funding support from the New Zealand Government materially enhances the credibility

of the Project with prospective lenders, equity participants and other stakeholders.


Placement

2

and Share Purchase Plan

3

The Company completed a $7m equity raising in which it received binding commitments from

wholesale investors in the amount of $9.4m.

The oversubscriptions were scaled back to the approved total of $7m.

The Company completed a Share Purchase Plan from eligible shareholders on the same terms

as the placement targeting to raise a maximum of $3m.

Applications in the amount of $2.505m were received.

Commentary from Chairman, Phil Thick:

“The Company greatly appreciates the funding support from the NZ Government that,

together with the success of its equity raise, reflects investor confidence as it continues to

steadily achieve its key objective of bringing the Barrytown Project into production during

2028. The exceptional results, evidencing the quality of the mineral deposits reported in the

updated Mineral Resource Statement and significant progress made with the substantive

application for Fast Track resource consents, provides the Company with increased confidence

as it completes the Definitive Feasibility Study to secure the project funding to develop the

Barrytown Project.”



Cargill South Mineral Resource Estimate

4


Page 2 of 9

The Competent Person classified the Cargill South mineral resource to contain 9.3Mt at 14%

Total Heavy Mineral (THM) Measured and Indicated, and 0.4Mt at 7% THM Inferred in

compliance with JORC Code (2012).

This adds 1.36Mt of mineral resource to the Barrytown Minerals Project resource base.


Mineral Resource Statement

4


The Mineral Resource Estimate (MRE) for the Cargill South block, together with the previously

reported MREs for Coates South, Canoe Creek and Barrytown Farms blocks, enabled the

Competent Person to report a resource base for the Barrytown Project of 34.1Mt at 21% THM

Measured and Indicated, and 0.9Mt at 2.3% THM Inferred in compliance with JORC Code

(2012).

This is an exceptional THM grade and the project resource base supports the 20+year mine

life to be studied by the Definitive Feasibility Study.


Fast Track Substantive Application

5

The Company lodged its reply to comments received by the Expert Panel considering its Fast-

track application for the Southern Block of the Barrytown Critical Minerals Project together

with further information requested by the Panel.

The Company has met each deadline in the process to date and is on track for a decision due

8 December 2026.


Financial Commentary

The Company closed the September Quarter with $7.8M in cash. Details are provided in the

Quarterly Cash Flow Report below.


Upcoming News

December Quarter,

 Terms and Conditions for the RIF loan agreed

 Fast Track Decision

 Substantial Project Update issued


This Activities and Cashflow Report has been authorised by the Board of Directors of the

Company.

Notes

1. TCM:NZX Announcement 6 July 2026 “Government Funding Offer”

2. TCM:NZX Announcement 8 July 2026 “Completion of Placement + details of SPP”

3. TCM:NZX Announcement 19 August 2026 “SPP results of Offer”

4. TCM:NZX Announcement 12 October 2026 “Updated Mineral Resource Statement”

5. TCM:NZX Announcement 8 October 2026 “Fast Track Decision Due 8 December 2026”


Ends


Page 3 of 9

Mineral Resource Statement

Deposit Category

In-Situ

Mass (Mt)

Sand

4


(%)

In-Situ Grade (%)

5

Material Content (kt)

10


Ilmenite Garnet Zircon VHM

6

THM

7,8,9

Ilmenite Garnet Zircon VHM THM

Cargill

South

Measured 4.3 50.9 4.8 8.2 0.1 13.2 16 210 350 5 560 670

Indicated 5.0 57.7 3.7 6.3 0.1 10.1 13 180 320 4 510 660

Inferred 0.4 47.8 2.1 3.2 0.1 5.3 7 10 10 0 20 30

Total 9.7 54.3 4.1 7.0 0.1 11.2 14 400 680 9 1,090 1,360

Canoe

Creek

Measured 1.15 64.4 11.7 13.8 0.24 26 32 130 160 3 300 370

Indicated 1.7 64.2 6.8 9 0.16 16 21 120 150 3 270 360

Inferred 0.5 67 12 14 0.3 26 33 70 80 2 140 180

Total 3.4 64.7 9.3 11.5 0.2 21 27 320 390 7 710 910

Barrytown

Farms

Measured 7.7 80 7.8 10.6 0.2 18.7 24.9 610 820 14 1,440 1,920

Indicated 5.8 76 9.2 12.2 0.2 21.6 28.5 530 710 11 1,250 1,650

Inferred - - - - - - - - - - - -

Total 13.5 78 8.4 11.3 0.2 19.9 26.4 1,140 1,530 25 2,690 3,570

Coates

South

Measured 4.6 68.3 5.2 7.8 0.1 13.2 21 240 360 4 610 950

Indicated 3.8 66.4 5 6.4 0.1 11.5 19 190 240 4 440 710

Inferred - - - - - - - - - - - -

Total 8.4 67.4 5.1 7.2 0.1 12.4 20 430 610 8 1,040 1,660

Total

Measured 17.8 69.2 6.7 9.5 0.1 16.4 22 1,190 1,690 26 2,910 3,910

Indicated 16.3 66.8 6.3 8.7 0.1 15.2 21 1,020 1,420 22 2,470 3,380

M+I 34.1 68.0 6.5 9.1 0.1 15.8 21 2,210 3,110 48 5,380 7,290

Inferred 0.9 61.8 8.9 10.0 0.2 17.8 23 80 90 2 160 210

Total 35.0 67.9 6.6 9.2 0.1 15.9 21 2,290 3,200 50 5,540 7,500


Notes:

1. Estimates are rounded to reflect the level of confidence at the time of reporting.

2. The Mineral Resources are classified in accordance with the JORC Code (2012).

3. The Mineral Resources are reported at a 1% ilmenite grade cut-off.

4. Sand is defined as the particle size range of 45 μm to 2 mm.

5. In-situ grades are grades estimated for the particle size range 45 μm to 2 mm factored by the proportion of sand.

6. Valuable Heavy Minerals (VHM) % is the sum of ilmenite, garnet, and zircon.

7. Total heavy minerals (THM)% is calculated for each interval as sum of ilmenite, garnet, zircon, allanite, Fe-oxide, epidote,

rutile, titanite and monazite contained within the particle size range of 45 μm to 2 mm and estimated by OK.

8. For Canoe Creek, Barrytown Farms and Coates South, THM% was calculated from VHM grade for each block using a linear

regression based on the SEM data: -0.0043 × [VHM]² + 1.3811 × [VHM] + 2.2234.

9. For Coates South, Total Heavy Minerals (THM) % is calculated for each interval as [VHM] / 0.66 and estimated by OK.

10. The Material Content is reported within the sand fraction and rounded to the nearest 10 kt except zircon.

11. The Mineral Resource is reported on a dry tonnes basis.

12. The effective date of the Cargill South MRE is 11 October 2026.

13. The effective date of the Canoe Creek MRE is 4 May 2026.

14. The effective date of the Barrytown Farms MRE is 6 October 2023.

15. The effective date of the Coates South MRE is 10 February 2023.

16. Totals may vary due to rounding.


Page 4 of 9

COMPETENT PERSON’S STATEMENT

The information in this announcement that relates to Mineral Resources is based on and fairly

represents information and supporting documentation compiled under the supervision of the

Competent Persons, Michael Gazley (sampling and data quality) and Mathijs van de Ven

(domaining and resource estimation). Michael Gazley and Mathijs van de Ven consent to the

inclusion in the announcement of the matters based on this information in the form and

context in which it appears. The Competent Persons are employees of RSC Consulting and are

independent of Tāiko.

Michael Gazley is a Member of the AusIMM and a Member of the Australian Institute of

Geoscientists. Michael is the General Manager Geoscience and Exploration at RSC and holds

a PhD in Geology from Victoria University of Wellington, New Zealand. He is an expert in pXRF

data collection and interpretation, and in collecting, integrating, and interpreting diverse

chemical and mineralogical datasets using multivariate techniques in exploration and mining

settings. He has almost 20 years of experience working in a range of commodities globally,

including orogenic Au, epithermal Au, placer Au, shear-hosted Cu, IOCG, Cu-Au porphyry, Pb-

Zn-Ag deposits, Li and REE pegmatites, and HMS. Michael has sufficient experience that is

relevant to the style of mineralisation and type of deposit under consideration, and to the

activity being undertaken, to qualify as a Competent Person as defined in the 2012 Edition of

the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore

Reserves’.

Mathijs van de Ven is a Member of The Australasian Institute of Mining and Metallurgy

(AusIMM). Mathijs is a Senior Resource Geologist for RSC, a global resource development

consultancy, and holds an MSc in Geology and Geochemistry from the Vrije Universiteit in

Amsterdam. He has eight years of experience working in Au, base metal, and high-tech metal

exploration projects in Australia, New Zealand, Indonesia, and Papua New Guinea and has

authored and co-authored several peer-reviewed research papers. Mathijs has experience in

geological modelling, mineral resource estimation, code-compliant reporting and QA/QC

reviews, and has worked on resource estimates of orogenic, epithermal and porphyry Au,

VHMS Cu-Pb-Zn, skarn W, and HMS deposits. Mathijs has sufficient experience that is relevant

to the style of mineralisation and type of deposit under consideration, and to the activity

being undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the

‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.

In addition to preparing the Mineral Resource estimate, Tāiko has also contracted RSC to

provide limited contracting and other advisory services. The full nature of the relationship

between RSC and Tāiko, including any issue that could be perceived by investors as a conflict

of interest, has been disclosed.





Page 5 of 9

Forward Looking Statement (s)

Statements relating to the estimated or expected future production, operating results, cash

flows and costs and financial condition of the work planned at the Company’s project and the

expected results of such work are forward-looking statements. Forward-looking statements

are statements that are not historical facts and are generally, but not always, identified by

words such as the following: expects, plans, anticipates, forecasts, believes, intends,

estimates, projects, assumes, potential and similar expressions. Forward-looking statements

also include reference to events or conditions that will, would, may, could or should occur.

Information concerning exploration results, metallurgical results and Mineral Resource

estimates may also be deemed to be forward- looking statements, as it constitutes a

prediction of what might be found to be present when and if a project is developed.

These forward-looking statements are necessarily based upon a number of estimates and

assumptions that, while considered reasonable at the time they are made, are inherently

subject to a variety of risks and uncertainties which could cause actual events or results to

differ materially from those reflected in the forward-looking statements.


Schedule of Tenements

Permit Ownership Status Registered Holder

Date

Granted

Expiry

Date

Tier

Area

(ha)

MP 60785 100% Active

TiGa Minerals and

Metals Limited

21 July

2022

20 July

2042

1 1250

EP 60917 100% Active

TiGa Minerals and

Metals Limited

19 April

2024

18 April

2029

2 245










Page 6 of 9

QUARTERLY CASH FLOW REPORT (UNAUDITED)

NAME OF ENTITY

TAIKO CRITICAL MINERALS LIMITED

COMPANY NUMBER QUARTER ENDED (“CURRENT QUARTER”)

5824110

30 SEPTEMBER 2026

CONSOLIDATED STATEMENT OF CASH FLOWS

Current quarter

(3 months)

$NZ’000

Year to Date

(6 months)

$NZ’000

1. Cash flows from operating activities

-


1.1 Receipts from customers -

1.2 Payments for

-



(a) exploration & evaluation expensed

(including resource consent) -

(b) development - -

(c) production - -

(d) staff costs - -

(e) administration and corporate costs (940) (1,987)

1.3 Dividends received - -

1.4 Interest received 7 10

1.5 Interest and other costs of finance paid - -

1.6 Income taxes paid - -

1.7 Government grants and tax incentives - -

1.8 Other (provide details if material) - -

1.9 Net cash from / (used in) operating activities (933) (1,977)

2. Cash flows from investing activities

-


2.1 Payments to acquire or for:

(a) deposits

-

(b) tenements - -

(c) property, plant and equipment (40) (40)

(d) exploration & evaluation (capitalised) (798) (2,079)

(e) investments - -

(f) other non-current assets - -

2.2 Proceeds from the disposal of:

-


(a) entities -

(b) tenements - -


Page 7 of 9

(c) property, plant and equipment - -

(d) investments - -

(e) other non-current assets - -

2.3 Cash flows from loans to other entities - -

2.4 Dividends received (see note 3) - -

2.5 Other - -

2.6 Net cash from / (used in) investing activities (838) (2,119)

3. Cash flows from financing activities



3.1

Proceeds from issues of equity securities

(excluding convertible debt securities) 9,504


9,504

3.2

Proceeds from issue of convertible debt

securities - -

3.3 Proceeds from exercise of options - -

3.4

Transaction costs related to issues of equity

securities or convertible debt securities (449) (449)

3.5 Proceeds from borrowings net of costs - -

3.6 Repayment of finance lease - -

3.7

Transaction costs related to loans and

borrowings - -

3.8 Dividends paid - -

3.9 Other - -

3.10 Net cash from / (used in) financing activities 9,055 9,055

4. Net increase / (decrease) in cash and cash

equivalents for the period


4.1

Cash and cash equivalents at beginning of

period 526


2,851

4.2

Net cash from / (used in) operating activities

(item 1.9 above) (933)


(1,977)

4.3

Net cash from / (used in) investing activities

(item 2.6 above) (838)


(2,119)

4.4

Net cash from / (used in) financing activities

(item 3.10 above) 9,055


9,055

4.5

Effect of movement in exchange rates on cash

held

- -

4.6 Cash and cash equivalents at end of period 7,811 7,811


Page 8 of 9

5. RECONCILIATION OF CASH AND CASH

EQUIVALENTS


AT THE END OF THE QUARTER (AS SHOWN IN THE

CONSOLIDATED STATEMENT OF CASH FLOWS

) TO THE

RELATED ITEMS IN THE ACCOUNTS


Current quarter

$NZ’000

Previous quarter

$NZ’000

5.1 Bank balances 7,811 526

5.2 Call deposits - -

5.3 Bank overdrafts - -

5.4 Other (provide details) - -

5.5

Cash and cash equivalents at end of quarter

(should equal item 4.6 above) 7,811 526


6. PAYMENTS TO RELATED PARTIES OF THE ENTITY AND THEIR ASSOCIATES

Current quarter

$NZ'000

6.1

Aggregate amount of payments to related parties and their associates

included in item 1

59

6.2 Aggregate amount of payments to related parties and their associates

included in item 2

-



7. FINANCING FACILITIES

NOTE: THE TERM “FACILITY’ INCLUDES ALL FORMS OF FINANCING

ARRANGEMENTS AVAILABLE TO THE ENTITY

.

A

DD NOTES AS NECESSARY FOR AN UNDERSTANDING OF THE SOURCES

OF FINANCE AVAILABLE TO THE ENTITY

.

Total facility amount

at quarter end

$NZ’000

Amount drawn at

quarter end

$NZ’000

7.1 Loan facilities - -

7.2 Credit standby arrangements - -

7.3 Other (please specify) – unsecured loan - -

7.4 Total financing facilities - -

7.5 Unused financing facilities available at quarter end Nil

7.6

Include in the box below a description of each facility above, including the lender, interest rate,

maturity date and whether it is secured or unsecured. If any additional financing facilities have been

entered into or are proposed to be entered into after quarter end, include a note providing details

of those facilities as well.



Page 9 of 9

8. ESTIMATED CASH AVAILABLE FOR FUTURE OPERATING ACTIVITIES $NZ’000

8.1 Net cash from / (used in) operating activities (item 1.9) (933)

8.2

(Payments for exploration & evaluation classified as investing activities)

(item 2.1(d))

(798)

8.3 Total relevant outgoings (item 8.1 + item 8.2) (1,731)

8.4 Cash and cash equivalents at quarter end (item 4.6) 7,811

8.5 Unused finance facilities available at quarter end (item 7.5) -

8.6 Total available funding (item 8.4 + item 8.5) 7,811

8.7

Estimated quarters of funding available (item 8.6 divided by item 8.3)


4.5

Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.

Otherwise, include a figure for the estimated quarters of funding available in item 8.7.


8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:

8.8.1 Does the entity expect that it will continue to have the current level of net operating cash

flows for the time being and, if not, why not?

Answer: N/A

8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further cash to

fund its operations and, if so, what are those steps and how likely does it believe that they

will be successful?

Answer: N/A

8.8.3 Does the entity expect to be able to continue its operations and to meet its business

objectives and, if so, on what basis?

Answer: N/A

COMPLIANCE STATEMENT

1 This statement has been prepared in accordance with accounting standards and policies.

2 This statement gives a true and fair view of the matters disclosed.



Date: 22 October 2026

Authorised by: The Board of Directors

Data sourced from publicly available filings. Our datasets may not be complete. Automated analysis can produce errors. If you believe any data on this page is incorrect, please contact us at hello@nzxplorer.co.nz. For informational purposes only. Not investment advice.

Other issuers discussed similar conditions around this time

Matched by meaning across NZX announcement text, not keywords — based on our semantic index of announcement bodies.